Decision Notice - Council Meeting Decision - MCU22 0051 [As Published] · MCU22/0051
Officer: Nadine Gorton
Direct Telephone: 07 5329 6215
Our Reference: MCU22/0051
Your Reference: 102995-10
2 November 2023
Bunnings Group Limited
C/- RPS Australia East Pty Ltd
PO Box 6149
MERIDAN PLAINS QLD 4575
[email protected]
Dear Sir/Madam,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 26 October 2023, Council decided to approve the
application, subject to conditions.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU22/0051
Street address: 178 Eumundi Noosa Road, Noosaville
Real property description: Lot 101 SP 279285
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval has been issued:
• Material Change of Use - Hardware and trade supplies
3. CURRENCY PERIOD OF APPROVAL
The Currency Period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior
to the use commencing, and then compliance maintained at all times while the use
continues.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of
12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
CURRENCY PERIOD
2. This development approval lapses if the use has not happened by 26 October 2029,
unless an application to extend the currency period is approved by Council.
APPROVED PLANS
3. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed in the tables below. The plans must be amended to
incorporate the amendments listed within the table below and resubmitted to Council
prior to the issue of any Development Permit for Operational Works
Plan No. Rev. Plan/Document Name Date
NIL
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
DA02 E Site Plan of Layout Proposed Bulk Trade Yard 23.08.2023
Undercroft Car Parking prepared by Group 4
Architects
DA03 E Site Plan of Layout Proposed Bulk Trade Yard 23.08.2023
First Floor Level prepared by Group 4 Architects
DA04 D Site Plan of Layout Proposed Bulk Trade Yard 22.08.2023
Roof Plan prepared by Group 4 Architects
DA05 E Site Plan of Layout Proposed Bulk Trade Yard 23.08.2023
Typical Sections prepared by Group 4 Architects
DA06 E Site Plan of Layout Proposed Bulk Trade Yard 23.08.2023
Elevations prepared by Group 4 Architects
The exit driveway located along the northern boundary is to be
Amendments
relocated off the boundary to provide a garden bed for a length of 15
meters (from the front of the site) with a minimum planting width of 0.5
meters. The plans are to detail landscape and/or architectural
treatments that soften the appearance of the retaining wall and
industrial building of the southern elevation of the adjoining site at 13
Vision Court.
The maximum height of the building is to be reduced such that no part
of the building exceeds 10 metres from natural ground surface levels
and finished levels.
An eave overhang a minimum of 1.2 metres wide must be provided to
the building’s front façade to provide further interest to the street.
*(Refer to Advisory Note)
NATURE AND EXTENT OF APPROVED USE
4. The approved use must not operate outside the hours of 6am to 6pm Monday to Sunday.
Page 2 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 3
5. The approved Bunning Warehouse Store on the balance area of the site must be
operated in accordance with the development approval (07/0256), which includes a
significant hardware component and trade sales area.
BUILDING APPEARANCE
6. External design features, materials and finishes must be as shown on the Approved
Plans, with no inclusions or alterations made without approval in writing by Council.
7. External colours and finishes must be of muted environmental tones, with broad
expanses of a single colour not permitted. Walls must be broken up by varying tones or
design elements and generally consistent with the colour scheme on the approved
plans. The proposed colour scheme must be different to the existing Bunnings
Warehouse Store on the balance area of the site.
8. Waste storage areas, and mechanical equipment are screened from the street.
9. No part of the site may be used for outdoor storage of materials.
10. All mechanical equipment and other service infrastructure located on the site must be:
a. located not less than 2 metres from a property boundary.
b. fully enclosed or screened such that they are not visible from the street frontages
nor adjoining properties. Where screened by landscaping, landscaping beds must
be at least 1.5 metres wide.
STAFF AMENITIES
11. On site amenities, including seating, tables and rubbish bins, must be provided for staff
protected from weather and removed from any noisy or odorous activities.
12. End of trip facilities must be provided for staff including 2 lockers, 1 shower cubicle with
an ancillary change room, and 2 bicycle spaces must be provided on site.
BUILDING HEIGHT
13. The maximum height of the development must not exceed 10 metres above the ground
level, including the exposed portion of the external façade of the building where
excavation is undertaken.
14. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld)
which certifies that the building does not exceed the maximum height requirement of this
Decision Notice.
LANDSCAPING WORKS
15. The development site must be appropriately landscaped. The works must be undertaken
in accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
a. The works generally shown on the Landscape Concept Plan 155.004.SD001B,
155.004.SD002B and 155.004.SD003B prepared by Citicene dated 9.02.2023
except where varied by the conditions of this approval. The landscape plans are to
incorporate a three-tiered landscape buffer to the street frontage incorporating the
following additional species:
• Corymbia tessellaris
• Eucalyptus intermedia
• Melaleuca quinquenervia
• Banksia integrifolia
b. Vegetated screening of the proposed development from Gateway Drive, designed
such that the development is screened at maturity;
c. Vegetated screening of any electrical transformers, bin storage areas and the like
from the road frontage;
Page 3 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 4
d. Provision of 1 street tree within the road reserve for every 8 metres of road
frontage.
16. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
FAUNA MANAGEMENT
17. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) prepared by a qualified person* and endorsed through an
Operational Works approval.
*(Refer to Advisory Note)
WASTE MANAGEMENT
18. A waste storage area must be designed and maintained in accordance with Planning
Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management
Code. The waste storage area must be:
a. imperviously paved and correctly sized for all refuse and recycling containers;
b. bunded and graded so that wastewater and bin leakage drain to the sewer;
c. provided with a conveniently located hosecock and backflow prevention device,
connected to a water supply to service the area; and
d. roofed or otherwise covered.
19. A Waste Management Plan must be prepared that details the type and quantity of waste
material that is likely to be generated by the development; where and how the waste will
be stored, disposed of and procedures for handling the waste. The Waste Management
Plan must be submitted and approved by Council prior to the issue of a Development
Permit for Operational Works.
PERFORMANCE BOND
20. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
ACID SULFATE SOIL
21. The disturbance and release of Acid Sulphate Soils must be avoided by:
a. Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
National Acid Sulfate Soils Guidance.
b. not excavating or otherwise removing soil or sediment containing ASS;
c. not permanently or temporarily extracting groundwater that results in the aeration
of previously saturated ASS; and
d. not undertaking filling on land at or below 5 metres AHD that results in:-
i. actual ASS being moved below the water table; or previously saturated
ASS being aerated.
Where potential or actual Acid Sulfate Soil is identified, all works must be caried out
in accordance with an Acid Sulfate Soils Management Plan prepared by a qualified
person*.
*(Refer to Advisory Note)
Page 4 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 5
EXTERNAL WORKS
22. Gateway Drive must be upgraded for the length of its frontage to the subject site allowing
for suitable transition of works. The works must be undertaken in accordance with an
Operational Works approval, the approved plans of development and must include in
particular:
a. A road reserve dedication in favour of Council, maintaining a minimum verge width
of 5m along the development frontage.
b. Modification of the existing pavement marking to extend the channelised right turn
lane (CHR).
c. Extension of the existing yellow line marking “No Stopping” zone.
d. Construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice.
Condition 22 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
SITE ACCESS AND DRIVEWAYS
23. Sealed access driveways must be provided from Gateway Drive to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. Driveway crossovers in accordance with IPWEA Standard Drawing RS-051 and
the approved plans of development.
b. Provide signage and line marking in accordance with the Department of Transport
and Main Roads Manual of Uniform Traffic Control Devices (MUTCD) that clearly
denotes separate entry and exit driveways for the development.
CAR PARKING
24. A minimum of 57 car parking spaces must be provided and marked on the site and made
available and accessible at all times while the use is open for business. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
a. Provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code;
b. One (1) disabled parking space/s within the use area;
c. Dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities.
25. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
26. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
PAVING TREATMENT OF VEHICLE MOVEMENT AREAS
27. Alternative materials, patterns, or threshold treatments must be used to articulate the
pavement treatment of vehicle movement areas.
PEDESTRIAN AND BICYCLE FACILITIES
28. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
a. A two metre wide concrete footpath within the road verge for the entire length of
the site’s frontage to Gateway Drive and connecting to the existing path fronting
Lot 11 SP170295.
Page 5 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 6
b. Pedestrian pathways between the proposed car parking area and the building/s.
c. Adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.
d. Signage and lighting at strategic locations to direct people to building entries and
public toilet facilities.
e. Pedestrian refuge areas at strategic locations within the carpark to ensure safe
and convenient congregating of pedestrians waiting to cross major access
driveways.
f. A total of 2 bicycle parking spaces
g. End of trip facilities involving 2 lockers, male and female showers and change
rooms.
Condition 28a is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
STORMWATER DRAINAGE
29. Carry out the development to ensure that adjoining properties, reserves and roads are
protected from ponding or nuisance from stormwater as a result of any works
undertaken.
30. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval, AS3500.3 and the Queensland Urban Drainage Manual, and must include in
particular:
a. Underground detention tanks and drainage works generally as shown in Appendix
C of the Site Based Stormwater Management Plan Rev 07, prepared by ACOR
Consultants, dated 24/08/2023
b. Collection and discharge of stormwater to Council’s underground pipe network in
Gateway Drive
c. Extension of the site stormwater system to accommodate stormwater from the
external catchment East of the site, including registration of drainage easements
over the pipe network within the subject site in favour of the upstream lot.
d. Cut off drains along the Eastern site boundary to convey external catchment flows
up to the 1%AEP climate change event into the pipe network within the site
e. The use of gravity stormwater drainage and not surcharge pits.
Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
STORMWATER QUALITY MANAGEMENT
31. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the
Bioretention Technical Design Guidelines (Water by Design, 2014), and must include in
particular:
a. Stormwater quality treatment devices of a size and location generally in
accordance with those shown in Appendix C of the Site Based Stormwater
Management Plan Rev 07, prepared by ACOR Consultants, dated 24/08/2023
b. A minimum 5kL rainwater harvesting tank, plumbed to supply toilet flushing and
landscape irrigation
c. Bioretention devices which:
i. Are designed generally in accordance with IPWEAQ Standard Drawing No.
DS- 073.
Page 6 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 7
ii. Are provided with a free-draining outlet from the sub-soil drainage system.
d. Incorporation of a primary stormwater quality treatment system for the effective
removal of gross pollutants.
32. Permanent educational signage must be erected to educate the customers to the
development about the function of the bioretention device(s). The dimensions, standard,
presentation and location of the educational signage must be in accordance with an
Operational Works approval.
33. All vegetated stormwater quality treatment devices must be maintained in accordance
with the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1)
and primary treatment devices maintained in accordance with the manufacturer’s
recommendations. The approved Operational Works drawings for the stormwater quality
treatment system and detailed life cycle costing of the system must be attached as an
addendum to this document and kept on site by the operator of the development.
Records of all maintenance activities undertaken must be kept and made available to
Council upon request.
EASEMENTS
34. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
35. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
36. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
EARTHWORKS AND RETAINING WALLS
37. All fill and associated batters must be undertaken in accordance with an Operational
Works approval and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council. The Operational works approval
is to be generally in accordance with the Bulk Earthworks Plan C03-001 and Bulk
Earthworks Section C03-101 dated 21.02.2023 and prepared by Acor Consultants
38. Design all earth retaining structures within private land in accordance with Australian
Standards, Building Code requirements and Noosa Planning Scheme current the time of
the operational works application and the following:
a. Earth retaining structures must be certified by a Registered Professional Engineer
Queensland (RPEQ) where exceeding 1.0m in height.
b. The minimum design life (the period assumed in design for which a structure or
structural element is required to perform its intended purpose without replacement
or major structural repairs) for the earth retaining structure that is specified in Table
3.1 of Australian Standard AS4678;
c. Earth retaining structures within the land and around areas of cut on or near the
boundaries of the site must be designed to allow for live and dead loads associated
with the land/premise’s current occupancy use;
d. Where the adjoining land use rights or zoning allows for industrial uses a minimum
live load of 25kPA must be allowed in the design of the retaining structure for these
adjoining premises.
e. All retaining walls that are publicly accessible and exceed 1.0m in height must be
fitted with a commercial grade safety fence.
Page 7 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 8
ACID SULFATE SOILS
39. If earthworks trigger assessment, prepare an Acid Sulfate Soil Investigation Report and
if required an Acid Sulfate Soils Management Plan prior to the commencement of works.
The reports and analysis are to be undertaken in accordance with the Noosa Plan 2020
and prepared by a suitably qualified person.
40. Prior to the commencement of use, provide certification from a suitably qualified person
that all works have been undertaken in accordance with the Acid Sulfate Soil
Management Plan.
PREPARATION OF A PRELIMINARY CONSTRUCTION MANAGEMENT PLAN
41. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. Traffic management during all aspects of the construction phase including:
i. Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
b. Maintenance of safe pedestrian access for the areas affected by the works during
and after daily construction has ceased.
c. Provision for worker car parking.
d. Maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures.
e. Works programme identifying key components of the works and their respective
durations.
f. Include signage in prominent locations on the boundaries of the site advising of
the proposed development, the expected time frames and the site contact details.
g. Identification of complaint management procedures including:
i. Contact details for the on-site manager.
h. Dispute resolution procedures.
i. If the proposed earthworks exceed 1000m3, provide details on the location of
external fill sites/sources, the haulage route, type of vehicle to be utilised during
filling operations and frequency of usage. NB any damage to the existing road
system as a result of haulage operations shall be fully repaired at the applicant’s
expense.
j. It is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre- Start Meeting for the project.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Page 8 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 9
Qualified Person
2. For the purpose of preparing a Landscape Plan, a qualified person is considered to be
a landscape architect, landscape designer and/or horticulturist with a minimum of 3
years current experience in the field of landscape design.
3. For the purpose of preparing a Fauna Management Plan, a qualified person is
considered to be an ecologist with a minimum of 3 years current experience in the field
of fauna assessment and management.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Qualified Person
6. For the purpose of preparing an Acid Sulfate Soils Management Plan, a qualified person
is considered to be a person who:
a. Is a Registered Professional Engineer of Queensland (RPEQ); or
b. Environmental/Soil Scientist with current professional membership status at a
relevant organisation (e.g. ASSSI, AIG; EIANZ; GSA); and
c. Has a minimum of 5 years of professional experience in the field of Acid Sulfate
Soils.
6. PROPERTY NOTES
Not applicable.
7. VARIATION APPROVAL DETAILS
Not applicable.
8. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Landscaping, Roadworks and Frontage
Works Works, Driveways, Carparking and Access,
Stormwater and Drainage, Earthworks
Development Permit for Building Works Building Works
9. SUBMISSIONS
Not applicable.
10. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make
written representations to Council about the conditions contained within the development
approval. If Council agrees or agrees in part with the representations, a negotiated decision
notice will be issued. Only one negotiated decision notice may be given.
Page 9 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 10
11. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on
line at www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Patrick Murphy
Manager - Development and Regulation
Enc: Appeal Rights
Infrastructure Charge Notice
Approved Plans/Documents
cc. Unitywater
Page 10 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 11
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
(2) The notice of appeal must be accompanied by the required fee. the person has not complied with the rules of the P&E Court
Page 11 of 12
Document Set ID: 22640657
Version: 7, Version Date: 02/11/2023
Page 12
Document Set ID: 22640657 Page 12 of 12 Version: 7, Version Date: 02/11/2023
Used in these records