Skip to the record
Accept no substitutions.

Council archive · source document

00157B3A.001

of 7

Text shows just the words. Original shows the document exactly as it was published.

Text sections not matched to the original PDF pages. See original document to check page numbers.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  3 of 7




                                      Noosa Council Conditions
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.    Development undertaken in accordance with this approval must generally comply with the approved plans
      of development. The approved plans are titled and numbered Site Plan, A-01; Floor Plan, A-02; Reflected
      Ceiling & Roof Plan/Elevation, A-03 and dated December 2006 and as may be amended by these
      conditions.

2.    The development must be undertaken and operated in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
      emissions.

3.    All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
      (LPG or natural).

4.    A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service the
      detached house. The tank is to be installed to ensure water from the tank can be used both:

      4.1.   for external use such as watering gardens, irrigation, ornamental ponds or water features, topping
             up swimming pools, outdoor cleaning; and

      4.2.   for use in flushing of toilets internal to the building.

5.    Existing trees on the site and within road reserves are to be retained, except where required to be
      removed due to building operations or the conduct of the approved use. In this regard, the removal of
      vegetation shall not extend beyond 3 metres of the building footprint of the Detached House.

6.    All other vegetation shall be protected from interference resulting from clearing or construction activities
      by:

      6.1.   Clearly marking vegetation to be retained with flagging tape;

      6.2.   Installing protective fencing around the drip line of the vegetation;

      6.3.   Stockpiling, storage and vehicle parking occurs in already cleared areas and does not cause
             interference with vegetation; and

      6.4.   Low impact construction techniques are used around vegetation to minimise interference with the
             vegetation.

7.    Cleared vegetation is to be suitably processed by one of the following methods and removed from the
      site:-

      7.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in
             heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
             between edges of heaps.

      7.2.   Disposal for firewood.

      7.3.   Disposal for landscaping purposes.

      7.4.   Transport to alternative site for breaking down materials provided that all necessary permits have
             been obtained to allow the alternate site to be used for this purpose.

      7.5.   The Applicant is advised that other methods may be considered provided full details of the method
             are submitted.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@a4014440\@[email protected]

Used in these records

About this file

File size
27 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00157B3A.001.pdf · 27 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.