Skip to the record
Every meeting, every word.

Council archive · source document

Approved Plans MCU16/0049 & OPW16/0109

of 10

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
           -

   NOOSA COUNCIL
   APPROVED PLAN
MCU16/0049 & OPW16/0109
      6 DEC 2016


[OCR of page images]
 

 

KJ

 

 

NOOSA COUNCIL
APPROVED PLAN
MCU16/0049 & OPW16/0109

6 DEC 2016

 

 

CROSSOVER TO BE IN
ACCORDANCE WITH COUNCIL
SPECIFICATIONS 125 SLAB.

00 SLAB ON GROUND TO DRIVEWAY.

NOTE: APPROX 800mm OF LOOSE SAND HAS BEEN FOUND ON THIS SITE, THIS MATERIAL IS TO
BE EXCAVATED AND REPLACED AND COMPACTED IN LAYERS TO A MINIMUM UNIFORM DENSITY
OF 98% COMPACTION. ALL FOOTINGS ARE THEN TO BE FOUNDED IN MATERIALS OF MINIMUM SAFE
BEARING CAPACITY l00kPa, ANY FILL MATERIAL BENEATH SLAB IS TO BE COMPACTED IN
LAYERS TO A MINIMUM UNIFORM DENSITY OF 98% STANDARD COMPACTION.

 

 

fot

(| LAYER F72 MESH 30 TOP COVER.
\ - - -

 

-|
|
|

7

Td

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PFI [| [| [| [| [00 SLAB ON GROUND TO EXTERNAL AREAS.
| LAYER F72 MESH 30 TOOP COVER.
R FBI EB
7 |
P| LIE IL JL = LILICIL fe = 2 Ey |
a 7 7 PFI |
PFI | Pry —-——f| ~~ Ie a | | (2)
Y 3 m7 |p 7 | | ~ |
lo al | |b — | | | 450 MASS CONCRETE PIERS
| | QD pass | | ty | | MIN 300 PAST U/S OD POOL °
TI | |_| wes 1 | re [— EXCAVATION.
ce | _ _ RG? wo ao
r 4 @25e=qI 0%; eS I | | _ | |
—_ _ a Ors < K
[ abe = IE = Fle gp APR ql | | |
[2 ASAP > Oh Vig 9 x] | | |
v a) | — 4E— <0 FBI |
| el | — Ay | | | Cs
| | | | L —~—__yG___sAL Of
| | q - 5
ofl Pt B22 PL__B?_ L Lj fe SSS SS Sse ore
[CALL LE = EEE A eee |
l raz TT Pc WS SS SH SRG Fi
oe a
SFI
FBI of:
wv | ye
| 7 AY
b Se
TJ |
a _ TJ Cp
ol EB
| |
PFI
( | (al |O
|| |
a _
5
- EB
PFI

 

 

FOUNDATION DESIGN IS BASED ON REPORT No. 16/0258 BY GLOBAL TESTING PTY LTD.
REFER TO THIS REPORT FOR SOIL CONDITIONS EXPECTED ON SITE.

IF ACTUAL SOIL

CONDITIONS VARY SIGNIFICANTLY FROM THOSE IN THE REPORT. CONTACT ENGINEER FOR
RE-APPRAISAL OF FOOTING DESIGN,

CONFIRM ALL STEPS AND FALLS WITH ARCHITECTS DRAWINGS.

CJ - FULL HEIGHT CONTROL JOINT TO MASONRY.

FOOTING

PLAN

 

EXCAVATION FOR POOL SHALL NOT EXTEND BELOW A LINE DIPPING
AT 45° AWAY FROM THE NEAREST UNDERSIDE CORNER OF ANY
FOOTINGS. CONTACT ENGINEER IF UNCERTAIN.

BUILDER TO VERIFY LOCATION OF ALL SERVICES ON SITE
PRIOR TO ORDERING MATERIALS OR COMMENCING WORK.

LOCATION OF POOL TO BE VERIFIED ON SITE.

 

RIENMAC pty tt

CONSULTING CIVIL € STRUCTURAL ENGINEERS

SUNSHINE COAST OFFICE:

A.B.N, 52 010 666 430
A.C.N, 010 666 430

SUITE 5, FIRST FLOOR, SAINT CIRINO, 137 BRISBANE ROAD,
(PO BOX 144) MOOLOOLABA @LD 4557
Fax:- (07) 5444 1158

Phone:- (07) 5478 2500
Email:- [email protected]

Website: -

www ,rienmac biz

 

CLIENT:

GEOFF CONNAN

PROJECT:
PROPOSED DUPLEX
38 ELANDA STREET

SUNSHINE BEACH QLD 4567

DRAWING TITLE:

FOOTING PLAN

This drawing is not_to be copied or amended without written permission from Rienmoc Consul

 

PETER RIENECKER - RPEQ 2088

 

 

 

 

 

 

 

 

Designed: PLR|SCALES: 1:100
Engineer: PLR|DRAWN: LR |DATE: 15 NOV lé
LOT 158 |
COUNTY OF MARCH, PARISH OF WEYBA
NOOSA SHIRE COUNCIL 16436 52 P
REAL PROPERTY DESCRIPTION ¢ COUNCIL: JOB NUMBER DWG No. ISSUE
DO NOT SCALE OFF DRAWINGS. | AS |SHEET 2 OF 13 |CHECKED: PLR

 

 

 

 

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans MCU16_0049 & OPW16_0109.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.