Council archive · source document
Amended plans received 14.11.25 · 51983.3225.25
Plans and drawings: the text below has words only, no drawings.
NOTES
BUILDING NOT TO EXCEED
FROSTED GLASS BALLUSTRADE WEATHERTEX WEATHERGROOVE WEATHERTEX WEATHERGROVE NOTE DESCRIPTION
WITH TIMBER TOP RAIL NATURAL 150MM MATT FINISH 15M MAX HEIGHT NATURAL 150MM MATT FINISH AW SUN AWNING
16980 15M MAX BUILDING HEIGHT
230
RTH RTH BAL1 BALUSTRADE TYPE 1 AS SELECTED
CL2 WEATHERTEX WEATHERGROOVE COL STEEL COLUMN, REF ENGINEER
DETAILS
1000
NATURAL 150MM MATT FINISH
15750 GRC GRC GRC
13050 ROOF DECK DP DOWNPIPE
SOFFIT TO BE WEATHERTEX
GRC GRC EX
METAL AWNING APPROX
WEATHERGROVE NATURAL 75MM GRC PROPRIETARY GLASS REINFORCED
12200 L4 2000w x 700 x 300d
SCR CONCRETE PLANTER REFER TO
AW AW AW SCHEDULE
BATTEN SCREEN WALL WITH
OPENABLE SECTION D3.2 D3.1 MB METER BOARD
3F GLAZING HEIGHT
3F GLAZING HEIGHT
3RD FLOOR
CL2 WEATHERTEX WEATHERGROVE RTH PROPRIETARY ROOF TOP HATCH
CL3 WEATHERTEX WEATHERGROVE
3600
NATURAL 75MM MATT FINISH
NATURAL 150MM MATT FINISH REFER TO SCHEDULE
W3.5
2400
2100
FROSTED GLASS BALLUSTRADE W3.3 RWH RAIN WATER HEAD & OVERFLOW
METAL AWNING APPROX
WITH TIMBER TOP RAIL
1400w x 700 x 300d SCR BATTEN SCREEN
9450 L3 (BEHIND) 12150 SET SLAB EDGE THICKENING REFER TO
RWH ENGINEERS DRAWINGS
AW EX ST STAIRS
AW AW AW
SOFFIT TO BE WEATHERTEX
TD TIMBER DECK
2F GLAZING HEIGHT
WEATHERGROVE NATURAL 75MM
2ND FLOOR
2F GLAZING HEIGHT
15000 MAX BUILDING HEIGHT
3000
CL3 WEATHERTEX WEATHERGROVE D2.7 D2.6
MAX BUILDING HEIGHT
W2.5 W2.4
2400
NATURAL 75MM MATT FINISH
2100
RAIN WATERHEAD & DOWNPIPE W2.10
FROSTED GLASS BALLUSTRADE
BAL1 COLORBOND MONUMENT
15000
WITH TIMBER TOP RAIL
6450 L2 9150
METAL AWNING APPROX
CL3 WEATHERTEX WEATHERGROVE 2000w x 700 x 300d
NATURAL 75MM MATT FINISH AW
AW AW
SOFFIT TO BE WEATHERTEX
1F GLAZING HEIGHT
1F GLAZING HEIGHT
1ST FLOOR
WEATHERGROVE NATURAL 75MM CL1 WEATHERTEX
3450
D1.1 D1.2
W1.4
FC SHEET PORTAL RENDERED IN-SITU WEATHERGROOVE SMOOTH 300MM
2400
2100
LOW SHEEN PAINT FINISH SURFMIST W1.9
FROSTED GLASS BALLUSTRADE
WITH TIMBER TOP RAIL BAL1 METAL AWNING 1200w x 600d
3000 L1 5700
EX
AW W0.2 W0.3 EX
AW
GROUND FLOOR
BLUEBOARD LINING TO CONCEAL
GF GLAZING HEIGHT
GF GLAZING HEIGHT
CARPORT SOFFIT TO CL2 WEATHERTEX WEATHERGROVE D0.2
COLUMN - RENDERED IN-SITU
3000
BE WEATHERTEX W0.1 NATURAL 150MM MATT FINISH
STONE FACADE SUPPLIED &
2100
2100
WEATHERGROVE
INSTALLED BY CLIENT. CL4 EASYLAP NATURAL 150MM W0.4
(OR SIMILAR) FACADE BEHIND
MB
Paint finish - "Monument"
0 L0 2700 DP TD
420 300
DEFINED FLOOD LEVEL 2400 DEFINED FLOOD LEVEL
NOM.
ST
720
570
551
551
551
551
520
SET COL N.G.L
FLOOR TO FLOOR HEIGHTS
1 Elevation 2 Elevation
A02 A02
Revision Description Date Issued By Building Class: 1 Sheet Name:
PROJECT DESCRIPTION
DESIGN & VERSION
CLIENT: B. & S. MAGANAY Climate Zone: 2
A1 CONCEPT PLAN 24.07.2025 MD
Wind: N4 (EQUIV)
ELEVATIONS (1)
11/11/2025 1:49:14 PM
B1 PRELIMINARY DESIGN 29.07.2025 MD NAME ON TITLE: SHELLEY JEANETTE MAGNAY
B2 GENERAL AMENDMENTS 28.08.2025 MD ADDRESS: 3/30 HASTINGS STREET NOOSA HEADS BAL: LOW Project #: Sheet #: Rev:
C1 DETAILED DESIGN 16.09.2025 MD Soil Class: P
C2
D1
MINOR CHANGE APPLICATION
GENERAL AMENDMENTS
29.09.2025
06.11.2025
MD
MD Lot 3 on GTP 1154 Corrosion: C5 1070 A05 E1
© QBCC Lic no. 15143813 Noosa Shire Council Acoustic: n/a Drawn By: MD Checked By: T.J. Scale: 1 : 100
E1 CONTRACT DRAWINGS 11.11.25 MD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended plans received 14.11.25Related documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.