Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
The original of this document is very large (18.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
INPUT
Rainfall Intensities (mm/hour) *
AEP 63.20% 50% 10% 2% 1%
5 minute storm 123 140 225 299 330
10 minute storm 101 114 180 235 257
30 minute storm 60.3 68.3 109 143 158
60 minute storm 40 45.5 74.3 100 112
120 minute storm 25.9 29.7 50.1 69.4 78.1
* default intensities set for Maroochydore (from BOM)
* default temporal patterns set for East Coast (North) (from ARR)
Catchment Information (5 minute time of concentration)
Area (m’
2539
2035
504
Cis*
0.82
0.9
0.82
* Cig values derived from QUDM
Fraction Impervious
0.60
1.00
0.60
¥
¥
Light cover bushland, or Poor grass cover, or Lol}
[Lowscipermeabiity —=—=—=S*~S~S*«~w*S: ~ Orifice & Weir Configuration
Low soil permeability
Lb
Detention Tank Information
Tank base width (m) = 48
Tank base length (m) = 48 O
Orifice flow discharge coeffecient C, = 0.62
Side wall slope = lino
* 1 in O slope indicates vertical walls O O
Tank Outlet Information
Orifice Number 1 2 3 4 5 6 Overflow Weir
Diameter (mm) 100 150 150 Length (mm) 1600
Invert level (mm) 0 I 0 300 Invert level (mm) 700
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.