Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
1.0 INTRODUCTION This engineering report and stormwater management plan is lodged in support of an application seeking to develop residential and commercial tenancies at 30-32 Doonella Street, Tewantin. The proposed development consists of 4, 2 level buildings with ground floor car parking. There are 19 residential units and 4 commercial tenancies. No basements are proposed. This report addresses relevant engineering issues and should be read in conjunction with attached preliminary architectural plans and engineering drawings. Importantly, this report seeks to address civil engineering issues at a level appropriate for a Development Application. Figure 1.1 depicts locality of the proposed development. Figure 1.1 – Locality Plan ___________________________________________________________________________________ A6035/21/Engineering Report/30-32 Doonella Street, Tewantin Page 1 of 9 May 2021 WM/tk Alta Projects P/L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.