Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Attachment I - Updated Engineering Report & SWMP

of 120

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

1.0    INTRODUCTION

This engineering report and stormwater management plan is lodged in support of
an application seeking to develop residential and commercial tenancies at 30-32
Doonella Street, Tewantin.

The proposed development consists of 4, 2 level buildings with ground floor car
parking. There are 19 residential units and 4 commercial tenancies. No basements
are proposed.

This report addresses relevant engineering issues and should be read in
conjunction with attached preliminary architectural plans and engineering
drawings.

Importantly, this report seeks to address civil engineering issues at a level
appropriate for a Development Application.

Figure 1.1 depicts locality of the proposed development.




                                 Figure 1.1 – Locality Plan


___________________________________________________________________________________
A6035/21/Engineering Report/30-32 Doonella Street, Tewantin                  Page 1 of 9
May 2021    WM/tk
                                    Alta Projects P/L

Log in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.