Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
GENERAL NOTES:
1. NOT ALL SERVICES HAVE NECESSARILY BEEN RECORDED AND
SHOWN ON THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE TO
LEGEND:
LIAISE WITH THE RELEVANT SERVICE AUTHORITY PRIOR TO FINISHED SURFACE CONTOURS
COMMENCEMENT OF CONSTRUCTION TO DETERMINE THE LOCATION
AND LEVEL OF ALL EXISTING SERVICE UTILITIES. THE CONTRACTOR EXISTING SURFACE CONTOURS
SHALL BEAR THE COST OF ANY DAMAGE TO EXISTING SERVICES.
PROPOSED CONCRETE DRIVEWAY.
\
\
2. THE CONTRACTOR SHALL OBTAIN ALL AS-CONSTRUCTED SURVEY
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
FOR ROADWORKS, DRAINAGE WORKS, SERVICE CONDUITS ETC.
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
PRIOR TO BACKFILLING. ALL SURVEY TO BE CARRIED OUT BY A
\
\
\
\
\
\
\
\
\
\
\
PROPOSED CONCRETE See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.