Original source · versioned page text
Attachment I - Updated Engineering Report & SWMP
Original PDF page 22, section 3. The text section number identifies this passage in the reader.
5.70
\
//
\
\
D
//
6.0
\
\
//
\
//
\
\
//
\
>
71
CARPARK
//
\
71
70
24
69
70
62
5.6
\
5.6
5.6
5.3
5.6
5.6
5.6
>
\
D
EXIT
//
\
| |
\
//
>
||
50
\
| |
//
5.8
| | Brigade Booster
5.6
ENERGEX
|
>
|
> | |
//
Pad Mount | |
|
Cabinet
> > |
>
//
Transformer | |
34
-15.8%
> ||
>
CARPARK
//
|
>
5.6
1.5m WIDE CONCRETE
D
| | | | | | | | | | | | | | | | | | | | | | | | |
>
> -2.3% >
//
> >
> >
//
ENTRY
FOOTPATH AS PER >
PEDESTRIAN SIGHT LINE.
> >
> >
//
> > > >
50
> >
> >
>
//
>
>
4.5
IPWEA STD DWG RS-065 LANDSCAPE TO BE
> > S150 S150 S150
> > > S150 S150 S150 S150 S150 S150 S150 S150 S150 S150 S150 S150 S150 S150 S150 S150
//
S150 S150 S150
> S150 S150 S150 S150
S150 S150 S150 S150 S150 S150 S150 S150 S150 > > >
D
S150 S150 S150 >
>
//
> >
LIMITED TO 0.6m HIGH
//
99
03
73
57
//
5.6
4.6
4.4
>
5.5
> >
> > > > > > >
WITHIN THIS AREA
//
//
RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM E/UG RM E/UG RM E/UG RM E/UG RM E/UG RM E/UG RM E/UG RM E/UG RM E/UG
// // // // // // // // // // // // // // // // // // // // // //
E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG
E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG E/UG
54 57 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment I - Updated Engineering Report & SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.