                                                                                 Officer:            Tara Norley
                                                                                 Direct Telephone:   07 5329 6414
                                                                                 Our Reference:      132007.738.05
                                                                                 Your Reference:     0081

               29 February 2024


               64 Gateway Dve Pty Ltd ATF 64 GD Trust & Body Corp
               Noosaville Smart Hub CTS 55066
               C/- Pivotal Perspective Pty Ltd
               4/59 Mary Street
               NOOSAVILLE QLD 4566
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 9 January 2024, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              132007.738.05

                   Street address:              Noosaville Smart Hub 64 Gateway Drive, Noosaville

                   Real property description:   Lot 13 SP 170295

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 2 July 2008.
               •       Development Permit for Material Change of Use of Premises – Industrial Business Type 1
                       – Warehouse and Industrial Business Type 2 – Production, Alteration, Repackaging &
                       Repairing
               In relation to the request to make a minor change to the existing approval, Council on 26 February
               2024, decided to approve the requested changes. The changes are detailed below.
               A.      Approved the change; and
               B.      Amend condition 1.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                              PO Box 141
               noosa.qld.gov.au                                                         Tewantin QLD 4565
               [email protected]                                                         07 5329 6500
                                                                                                         Page 1 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024
Log in to download the original file

Decision Notice - Minor Change - 132007 738 05 [As published].pdf · 214 KB (small file)

Full text of the other 16 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               Land Use
               1.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                        Plan No.       Rev.   Plan/Document Name                               Date

                        19020 A.102    B      Master Plan – Staging Plan prepared by Zest 12.06.2021
                                              Design

                        19020 A.200    I      Master Floor Plan prepared by Zest Design        21.09.2022

                        19020 A.200    B      Pod A Level 1 – Floor Plan prepared by Zest 15.05.2023
                                              Design
                                              Annotated by Council

                        19020 A.201    B      Pod A Level 2 – Floor Plan prepared by Zest 15.05.2023
                                              Design
                                              Annotated by Council

                        19020 A.300    B      Elevations prepared by Zest Design               15.05.2023
                                              Annotated by Council

                        19020 A.301    B      Elevations prepared by Zest Design               15.05.2023
                                              Annotated by Council

                        19020 B.200    15     Pod B- Floor Plan prepared by Zest Design        28.09.2022
                                              Annotated by Council

                        19020 B.300    15     Elevations prepared by Zest Design               28.09.2022
                                              Annotated by Council

                        19020 C.200    17     Pod C – Floor Plan prepared by Zest Design       28.09.2022
                                              Annotated by Council

                        19020 C.300    16     Elevations prepared by Zest Design               28.09.2022
                                              Annotated by Council

                        19020 D.200    11     Pod D – Floor Plan prepared by Zest Design       28.09.2022
                                              Annotated by Council

                        19020 A.205    C      Pod F – Floor Plan prepared by Zest Design       30.05.2019

                        19020 A.206    C      Pod G – Floor Plan prepared by Zest Design       30.05.2019

                        19020 A.207    C      Pod H – Floor Plan prepared by Zest Design       30.05.2019

                        19020 D.300    11     Elevations prepared by Zest Design               28.09.2022
                                              Annotated by Council

                        19020 D.301    11     Elevations prepared by Zest Design               28.09.2022



                                                                                                Page 2 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 3

                                                Annotated by Council

               2.     The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.
               3.     The open space and setback areas are to be landscaped in accordance with Council’s Policy
                      on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
                      qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior
                      to the premises being occupied and maintained at all times thereafter. The landscaping shall
                      include:
                      a.      A minimum of 2m width of landscaping adjacent to uncovered parking at the head of
                              the cul-de-sac except for car space 12 which must be setback a minimum of 1.7m and
                              car space 13 which must be setback a minimum of 1.4m. The motor cycle space closest
                              to the each side of the central entry must be removed and replaced with landscaping
                              and include a shade tree;
                      b.      A minimum of 1 shade tree per six vehicle parking spaces;
                      c.      Dense native screening vegetation within the landscaped buffer adjacent the western
                              boundary (where not located within the easement area) consisting of species with a
                              range of mature canopy heights;
                      d.      Revegetation of the landscaped buffer along the northern and eastern boundaries; &
                      e.      Appropriate landscaping / treatment to bin collection or storage areas so that they do
                              not dominate the streetscape.
               4.     All buildings shall have a maximum building height of 10 metres above the natural and
                      finished ground levels and shall be a maximum of 2 storeys.
               5.     A minimum 1.8 metre high timber screening fence shall be constructed along the western
                      boundary of the site.
               6.     The walls to the rear facades of the buildings shall be finished in muted natural tones.
               7.     The windows proposed along the western façade and the southern façade of tenancies 1, 2
                      & 3 of the development shall be permanently fixed and fitted with double glazed glass or
                      glass that is equivalent in sound transmission loss to double glazed glass.
               8.     The retail sales component of any tenancy shall not exceed the gross floor area requirement
                      of the Planning Scheme in force at the time for that tenancy and shall remain an ancillary
                      component of the approved use.
               9.     All goods are to be displayed on site within the property boundaries and/or on the premises
                      approved for the use. Goods shall not be stored or displayed within the common areas of the
                      site.
               10.    Secure bicycle racks shall be provided on site to accommodate a minimum of 45 bicycles.
                      The proposed bicycle racks shall be identified on the landscaping plans and shall be
                      dispersed across the site to the reasonable satisfaction of Council.
               11.    End of trip facilities shall be provided within the buildings at a minimum rate of 1 locker per 2
                      bicycle parking spaces; 1 shower per 10 bicycle parking spaces or part thereof; and change
                      rooms.
               12.    The tenancies of 150m2 or greater indicated on the approved plan shall not be further
                      subdivided or partitioned to create additional tenancies.
               13.    Any advertising sign or device is to comply with Council's policies on advertising devices.
               14.    Existing trees on the site and within road reserves are to be retained, except where required
                      to be removed due to building operations or the conduct of the approved use. The landscape
                      plans required to be submitted are to denote areas of existing vegetation or existing trees
                      proposed or required to be retained.


                                                                                                        Page 3 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 4

               15.    A qualified fauna spotter shall be engaged during the removal of any vegetation.
               16.    Cleared vegetation is to be suitably processed by one of the following methods and removed
                      from the site:-
                      a.      Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
                              loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
                              minimum of 10 metres between edges of heaps.
                      b.      Disposal for firewood.
                      c.      Disposal for landscaping purposes.
                      d.      Transport to alternative site for breaking down materials provided that all necessary
                              permits have been obtained to allow the alternate site to be used for this purpose.
                      e.      The disposal method for clearing works is to be submitted in conjunction with an
                              application for a Development Permit for Operational Work. The Applicant is advised
                              that other methods may be considered provided full details of the method are
                              submitted.
                      The Applicant is advised that burning off is an unacceptable method of disposal.
               17.    All hot water systems installed shall be either solar systems; electric heat pump systems; or
                      gas systems (LPG or natural).
               18.    The proposed development shall have all kitchen, laundry and bathroom fittings that comply
                      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
                      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
                      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
                      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
                      Dishwashers and washing machines are excluded from this requirement.
               19.    Security in the form of a cash bond or trading bank guarantee to the sum of $40,000 must
                      be submitted, to secure performance of all conditions of this approval, prior to the issue of a
                      Development Permit for Operational Works. The cash bond or trading bank guarantee will
                      be returned on performance of the conditions of approval less any costs incurred by Council
                      in respect of enforcing performance of this permit.
               20.    The requirements of this development approval are to be effected, prior to the use of the
                      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
                      this approval to effect compliance with conditions.
               21.    The developer must obtain all of the other Development Permits referred to in the Decision
                      Notice, prior to obtaining a Development Permit for Building Works.
               22.    The Development Permit for a material change of use of premises lapses if the use has not
                      happened by 2 July 2022 unless an application to extend the currency is approved by
                      Council.
               Land Development
               Flooding
               23.    Where applicable, any habitable rooms within buildings proposed on site (and areas utilised
                      for carparking purposes associated with the buildings) and any outdoor electrical
                      transformers and generators shall be constructed to comply with Council’s Minimum Floor
                      Height requirements as defined in Council’s Planning Scheme and on Council’s Scheme
                      Maps at the time of issue of the Building Permit.
                      In this regard, and as an indication only, - a Minimum Floor Height of RL 2.80m (AHD) shall
                      apply. These levels, however, are subject to change and verification shall be made to
                      Council’s Land Development Section prior to obtaining a Development Permit for Building
                      Works.




                                                                                                       Page 4 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 5

               Vehicle Access
               24.    Vehicular access to the site shall be constructed from the Gateway Drive frontage of the site
                      generally in accordance with the approved plans and as may amended by these conditions.
               25.    All accesses to the site shall be of a maximum width of 6.0m at the property boundary.
               26.    The eastern and the western exit/accesses shall be clearly signed and marked to indicate
                      No Entry and Exit Only.
               27.    The central access shall be clearly signed and marked to indicate Entry Only.
               28.    The driveway shall be designed and constructed to Council’s design standards and to grades
                      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
                      movements along the footpath without any step or level difference. Should any driveways
                      be constructed to grades that do not comply with AS/NZS 2890.1-2004 and AS 2890.2-1989,
                      Council will require that the driveway be removed and reconstructed to levels that do comply.
                      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
                      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
                      trip or fall.
               29.    To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
                      footpath, the driveway and any associated fencing or vegetation near the driveway shall
                      comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The
                      applicant shall demonstrate compliance by illustrating these sight lines on the plans
                      submitted for both Operational Works approval and Building Works approval.
               30.    A public access easement for future cycleway and pathway shall be created over the existing
                      sewer easement, Easement U, along the south and west boundaries of site as shown on the
                      Land Title Plan SP 170295.
               Car Parking and Loading Areas
               31.    Car parking, loading zones and skip bin storage shall be designed and constructed generally
                      in accordance with the approved plans.
               32.    A minimum of 127 uncovered carpark spaces shall be provided on site and shall include:-
                      a.      clearly defined and strategically placed disabled carpark spaces.
                      b.      a minimum of the equivalent of 3 of the car parking spaces designated for motorcycle
                              and motor scooter parking, to accommodate a minimum of 12 spaces. Motorcycle and
                              motor scooter parking is to be evenly dispersed across the site..
               33.    The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
                      for user Class 1 for staff and Class 3 for clients spaces with allowance for vehicles to enter
                      and leave the site in a forward gear and with a minimum head clearance (headroom) at any
                      point of 2.2m.
               34.    All carparking areas shall be kept, maintained and line-marked in a condition fit for use.
               35.    In order to ensure safety of pedestrians, the internal pathways on the site shall be a minimum
                      1.5m wide and be raised above the level of the internal driveway (the aisles) by providing
                      mountable kerb along the outer edge of the pathway and providing line marking and textures
                      surface pathway where necessary. The type and extent of line marking and texture surfaces
                      shall be clearly shown on all plans submitted for operational works.
               Frontage Works
               36.    A new full width concrete or paved path shall be constructed along the cul de sac frontage
                      of the site in accordance with Council’s design standards. Care shall be taken to protect any
                      existing vegetation and/or any underground services.




                                                                                                      Page 5 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 6

               37.    All external and internal paths, driveways and parking areas shall be designed and
                      constructed to ensure pedestrian safety using non-slip materials, to produce an evenly
                      graded surface finish, and to be in accordance with the Disability Discrimination Act 1992
                      and Australian Standard 1428.1 Design for Access & Mobility.
               38.    Any redundant vehicular crossings to the site shall be removed and replaced by kerb &
                      channel, footpath paving and landscaping such as trees and grasses in accordance with
                      Council’s Standard specifications prior to commencement of the use permitted by this permit.
               Roof Water, Stormwater Drainage and Sewerage
               39.    Roof runoff from any new /building shall be directed to a rainwater storage system or tank(s)
                      that is installed to ensure water from the tank(s) is used for external uses (such as watering
                      gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor
                      cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks
                      are to be designed and installed in accordance with the Queensland Development Code
                      (QDC) current at the time of building approval, and shall be part of the plumbing application
                      for approval. The location and capacity of the tank/s shall be clearly shown on the plans
                      submitted for Building Works / Operational Works approval and any overflow shall be directed
                      to the stormwater detention drainage system proposed near the north eastern part of the site.
               40.    All stormwater drainage of the site shall be designed and certified by a Registered
                      Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit
                      for Operational Works. The stormwater drainage design shall give considerations to the
                      following:
                      a.      The design shall be generally in accordance to Drawing No 06105 - 1 (A) dated 3
                              November 2007 by Callaghan & Toth.
                      b.      The design shall take into consideration the findings and the recommendations of the
                              Stormwater Quality Management and Assessment Report dated March 2007 prepared
                              by Callaghan & Toth.
                      c.      The design shall include treatment train of rainwater detention/reuse tanks, gross
                              pollutant traps/oil arrestors, Bio-Retention Basin/Unit and Raingardens to attenuate the
                              stormwater runoff quality and quantity to the Pre Development levels. Calculation and
                              data shall be provided to demonstrate that the EPA recommended water quality
                              objectives will be achieved.
                      d.      All stormwater runoff from the paved areas on the site shall be disposed off via the
                              treatment train.
                      e.      There shall be no concentration of stormwater flows that may cause environmental
                              damage, erosion or siltation onto the downstream bushland due to the completed
                              development or the construction phase of the site.
                      f.      To ensure no adverse impact on the proposed buildings on the site (particularly units
                              facing the central access driveway), the design shall allow for secondary flowpath to
                              cater for 100 years flows from within the site and from Gateway Drive. Improvement/s
                              on the existing stormwater collection within Gateway Drive shall be included in the
                              design and construction where necessary.
               41.    To ensure that polluted run-off does not enter Council’s stormwater drainage system,
                      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
                      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
                      provided on site prior to being permitted to discharge into Council’s drainage system.
                      All other clean stormwater, such as roof water, can be collected on site and discharged
                      through a single underground drain line directly into the existing drainage system, bypassing
                      the grease/oil arrestor/gross pollutant trap.
                      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
                      arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
                      obtaining a Development Permit for Operational Works.


                                                                                                        Page 6 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 7

                      The approved maintenance plan shall be incorporated in the Community Management
                      Scheme for the development and a copy of this shall be provided for Council’s records prior
                      to commencement of the approved Use.
                      A Development Permit for Building Works shall not be granted until a Development Permit
                      for Operational Works has been issued in regard to the drainage scheme.
               42.    All site stormwater drainage shall be by means of a gravity system.
               43.    Prior to issue of any Operational Works Approval for the development, the applicant must
                      provide Council with an updated stormwater quality management plan for the site that
                      demonstrates that the following targets are achievable within the development design
                      including for each individual stage of development:
                      a.      All stormwater from the site must be treated to achieve the following pollution reduction
                              targets:
                              •        80% reduction in Total Suspended Solids
                              •        60% reduction in Total Phosphorous
                              •        45% reduction in Total Nitrogen
                      Where Bioretention basins are proposed to achieve the outcomes, they must be designed in
                      accordance with the Water By Design Technical Design Guidelines and demonstrate that all
                      infrastructure that is part of the bioretention basin is not likely to become compromised by
                      future sea-level rises.
               44.    Any bioretention basins must be maintained in accordance with the Water by Design
                      Technical Design Guidelines and records made available to Council on request.
                      Bioretention basin maintenance requirements must be incorporated in the Community
                      Management Scheme for the development and a copy of this must be provided for
                      Council’s records prior to commencement of the approved use.
               45.    The site shall be connected to Unitywater’s existing sewerage reticulation systems and be
                      constructed in accordance with Council’s standards and requirements at no cost to Council.
               46.    The design for the sewer layout on the site shall be generally in accordance to Drawing No
                      06105 - 2 dated 3 November 2007 by Callaghan & Toth titled Proposed Site Layout Levels
                      & Sewer Plan.
               47.    Any building or structure within proximity of an easement or any other public utility’s
                      underground must have its foundations designed so that no surcharge loads are imposed
                      upon such underground infrastructure. Foundations must be taken down a minimum of 1.0m
                      below a line of influence measured 1.0m in the direction of the foundation from the centreline
                      of the closest underground service and along the natural angle of repose of the foundation
                      soil type(s).
                      Plans, and supportive documents, detailing these proposed foundations shall be designed
                      by a registered practicing Geotechnical Engineer and submitted with the application for a
                      Development Permit for Operational Works.
               48.    There shall be no encroachments on Council easements by any buildings or structures (eg.
                      ponds, retaining walls exceeding 1m in height, raised terraces, aboveground or underground
                      water tanks, air conditioning units, ancillary buildings and the like).
               49.    All proposed underground services on the site shall not interfere with the function or the
                      access to the existing Council’s services on the site. To this end the applicant shall provide
                      general plan showing all the existing and proposed services and easements on and adjacent
                      the site to be submitted to council in conjunction with the application for Operational Works.
               Town Water Supply
               50.    The site shall be connected to Unitywater’s existing town water supply and be constructed in
                      accordance with Unitywater’s standards and requirements at no cost to Unitywater.




                                                                                                         Page 7 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 8

               51.    Each individual water connection to the water reticulation system shall extend to the property
                      boundary and be metered. All fees for the supply of water meters shall be paid to Unitywater.
               52.    All water meters must be located outside the property boundary and in an easily assessable
                      location to facilitate unhindered reading by Unitywater and/or Unitywater’s contracted water
                      meter readers, and not behind fences or locked gates. In this regard approval of the water
                      meter configuration and location must be obtained from Unitywater prior to lodgement and
                      approval of hydraulic drawings.
               53.    For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
                      shall be served by:
                      a.      A single Body Corporate water meter to measure the total water consumption
                              (including fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
                      b.      Individual water meters to each tenement capable of being separately rated, and
                      c.      A fire service (fully testable single detector check with metered bypass), where
                              applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
                              reels).
               54.    Fire hydrants are to be provided throughout the development in accordance with Council
                      Engineering Design Standards and in accordance with Queensland Fire Service Standards.
                      The applicant is advised that this development may require the provision of fire hydrants and
                      a booster pump in accordance with the Building Code of Australia, and consultation may also
                      be needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
                      provided. To this end any necessary fire hydrants shall be clearly shown on the plans
                      submitted for both Operational Works and Building Works approval and if a booster pump is
                      deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
                      order to provide boosting to the water supply.
               Earthworks
               55.    Filling works required on site shall be carried out in accordance with Council’s Planning
                      Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
                      ponding of water on any adjoining lands or the blockage of, or interference with, any natural
                      watercourses. Detailed site surveys indicating natural surface levels and contours of the
                      adjoining properties must be provided with the application for a Development Permit for
                      Operational Works for Filling and Drainage.
                      This may require the design and construction of drainage pipes and/or an overland flow-path
                      within the development site that caters for drainage from the adjoining sites for a design
                      storm with an Average Recurrence Interval of 1 in 100 years. A private easement for the
                      Drainage of Water encompassing the drainage pipes or overland flow-path will also be
                      required. In this regard a Development Permit for Operational Works shall be obtained.
                      Should evidence be provided to Council indicating that no additional ponding of stormwater
                      will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
                      path and easement shall not apply.
               56.    Earthworks carried out on site shall not affect the structural integrity of any of the existing
                      fences or structures that border the development site. Fences that are affected shall be
                      replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
                      any fences to be replaced shall be clearly shown on the plans submitted for Operational
                      Works approval.
               57.    Any filling works shall be retained with constructed walls that are designed and located to
                      minimise impacts on the vegetated buffers areas indicated on the approved plan of
                      development.




                                                                                                         Page 8 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 9

               Acid Sulfate Soils
               58.    As the site is located below the 5m AHD, any excavation works or earth disturbance
                      consisting of 100m3 or greater and/or any filling works consisting of 500m3 or greater and
                      with an average depth of 0.5m or greater will need to be carried out in accordance with State
                      Planning Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils. In
                      this regard appropriate testing and supporting documentation prepared by a suitably qualified
                      specialist shall be submitted to Council for approval prior to obtaining a Development Permit
                      for Operational Works.
               59.    Excavated soil shall be lime treated in accordance with the recommendations of the Acid
                      Sulfate Soil Investigation dated August 2003 by Golder Associates Pty Ltd.
               Environmental
               60.    The applicant shall provide a professionally prepared Environmental Management Plan
                      (EMP) for the site to be submitted to Council for approval prior to obtaining a Development
                      Permit for Operational Works. The management plan shall be for the construction phase
                      and the operational phase of the development and shall address:-
                      a.      Management of the naturally acidic soils identified on the site;
                      b.      Protection of vegetation with the Environmental Buffer and Landscaped Buffer areas;
                      c.      Run-off water quality management, sediment and erosion control;
                      d.      Vegetation removal and disposal, including the use of fauna spotter;
                      e.      Removal of environmental weeds; &
                      f.      Rehabilitation of disturbed areas within the identified buffer areas.
               61.    All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
                      Stock Route Management) Act 2002 are to be controlled on the site prior to Council
                      endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
                      pests, completely eradicated. For class 3 pests it shall mean removal of the plants where
                      they threaten environmentally significant areas of the site such as riparian zones and areas
                      of natural vegetation.
                      Where class 3 plants are removed as a result of this condition and there is not sufficient
                      natural regeneration of native species, the areas shall be replanted with endemic native
                      species so that a sustainable natural ecosystem is restored.
                      Council’s Conservation Management Supervisor will not inspect the site until 30 days after
                      the weed treatment and replanting is complete.
               62.    A Vegetation Protection Area shall be provided in the northeast corner of the property as
                      indicated on drawing the approved plan and as recommended by the Ecological Survey
                      prepare by Pederson Biological and Environmental dated 15 April 2003. This area shall be
                      of a triangular shape, with corners being approximately 54 metres along the northern
                      boundary and 37 metres along the eastern boundary from the northeastern corner of the
                      property.
               63.    In order to protect the vegetation within the Vegetation Protection Area an Environmental
                      Covenant(s) (as defined by Part 6 division 4A of the Land Title Act 1994) shall be created at
                      no cost to Council. The covenant(s) shall be for the protection of the site’s environmental
                      values so that it retains and enhances the vegetation and allows for fauna movement.
               64.    The existing vegetation within the 10m wide Landscape Buffer areas adjacent to the western,
                      northern and eastern boundaries shall be retained, with the exception of any bio-retention
                      basins, raingarden areas or rainwater tanks, and a 3metre strip adjacent to the buildings for
                      construction purposes. Plans shall be submitted to the Council for approval that clearly
                      indicates the vegetation retention areas prior to obtaining a Development Permit for
                      Operational Works. Temporary fencing shall be provided to protect these trees during the
                      construction phase.



                                                                                                      Page 9 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 10

               65.    Where retained trees are located in areas proposed to be filled on the site (or are located on
                      neighbouring allotments to the area to be filled), there will be a need to prevent fill material
                      from being placed on the tree’s root system. To this end, the design of any filling works will
                      need to incorporate terracing around the tree or a similar means of ensuring that the natural
                      ground level around the trees remains generally the same as existing. These measures shall
                      clearly be shown on the plans submitted for Operational Works approval and any drainage
                      required to drain these areas shall also be shown on the plans.
               66.    An environmental maintenance period of 12 months shall commence after the Landscaped
                      area has been re-vegetated and all declared & environmental weeds have been removed
                      from the entire property. Council’s appointed Environmental Officer shall sign the
                      maintenance period ‘on’ and ‘off’ after this work has been successfully completed. To this
                      extent, the Officer has the discretion to pause the maintenance period if work has not been
                      carried out as instructed or if lengthy time delays occur.
               Erosion and Sediment Control
               67.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                      site. Site control measures such as silt fencing, controlled gravel access to the site and
                      controlled disposal of waste, will be necessary.
                      In this regard plans detailing the methods of controlling erosion and sediment are required
                      to be submitted to the Council for approval prior to obtaining a Development Permit for
                      Operational Works.
               Contributions Towards Council Infrastructure (amended 1/07/2019)
               68.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
                      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
                      only of the contribution amounts under the current Council policies and requirements is
                      outlined in the table below:

                        Contribution Required For: Amount:
                        PSP12 – Public Open Space Contributions (Park)             $25,474.00
                        PSP16 – Sewerage Headworks Contributions                   $62,375.00
                        PSP17 – Water Supply Headworks Contributions               $54,735.00
                        PSP20 – Pathway Trunk Network Contributions                $26,614.00
                        TOTAL Contribution Amount =                                $169,198.00
                        Please note that these amounts are all subject to variations in the Consumer Price Index,
                        All Groups Brisbane from March 2019 until the date of payment.

                       All contributions must be paid prior to the change of use happens.
               General
               69.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings
                      and specifications for all engineering works, which shall be submitted in conjunction with an
                      application for a Development Permit for Operational Works. In this regard a DXF/DWG file
                      on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
                      with any application for Operational Works.
               70.    Digital detailed designs including drawings, calculations, specifications and a schedule of
                      works, shall be submitted with any application for a Development Permit for Operational
                      Works in respect of stormwater drainage works. The design shall be in accordance with
                      Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads,
                      Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
                      and proposed services required by the development shall be shown on the plans.




                                                                                                      Page 10 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 11

               71.    A construction management plan/strategy to ensure no damage occurs to Council services
                      shall be prepared by a suitably qualified Registered Professional Engineer and submitted to
                      Council in conjunction with any application for Operational Works.
               72.    Any damage caused to any public utility during the course of construction shall be repaired
                      to Council’s standards and at no cost to Council.
               73.    Any alteration of any public utility or other facilities necessitated by the development of the
                      land or associated construction works external to the site shall be at no cost to Council.
               74.    The transportation of all materials to and from the site shall be undertaken in a manner such
                      that no particle matter escapes onto a public road. All vehicles carrying materials either to
                      or from the site shall be covered to prevent materials including dust being windblown from
                      the vehicle.
               75.    As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
                      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level
                      and type of all services and structures. All of which shall be submitted to Council for checking
                      and for Council’s records.
                      The data must fully detail levels for all engineering works including but not limited to
                      drainage structures, finished ground levels and pavement surface levels. The data shall be
                      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
                      the use of ADAC are available at www.adac.com.au).
               76.    Approval of works shall not be granted until all As Constructed information has been supplied
                      and accepted by Council.
               Environmental Health
               77.    Refuse containers must be provided in accordance with the requirements of the
                      Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                      Regulation 2000, for the storage and collection of refuse.
               78.    The Operational Waste Management Plan (OWMP) dated 20 May 2008 submitted is not
                      approved and shall be amended and re-submitted to Council for approval prior to the issue
                      of a Development Permit for Operational Works. The revised OWMP shall address the
                      following:
                      a.      Additional skip bin storage areas for Bulk Recyclables for the eastern and western
                              areas of the development in addition to the refuse storage areas as indicated in the
                              Operational Waste Management Plan dated 20 May 2008 Job No. 7800/62.
                      b.      Provision for waste generated from food, mechanical, boat repair and other industries,
                              in accordance with the range of approved uses.
                      c.      A minimum separation distance of 500mm between bins to be collected by robotic arm.
                      d.      Flat or minimal grades where industrial bins are to be manually shifted by refuse
                              collectors.
                      e.      The role of the Body Corporate Manager is to be clarified. If no on-site manager is
                              proposed then the OWMP is to be revised to adequately address the day-to-day
                              management of waste issues on the site.
               79.    There shall be no awnings or building overhangs along the refuse truck travel path or
                      manoeuvring areas.
               80.    A Waste Management Plan (Construction) shall be submitted in accordance with Planning
                      Scheme Policy 11, Waste Management Plans. Waste storage areas are to provide for
                      adequate separation of all reusable, recyclable and waste materials. These shall be located
                      so that they are convenient and safe to use (refer to Noosa Council Waste Management
                      Code).
                      The Plan shall contain the following information:



                                                                                                      Page 11 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 12

                      a.      The site area for the storage and separation of waste is to be shown on the plan
                              drawings accompanying the application.
                      b.      A waste management table as indicated below is to be completed showing how waste
                              material is to be segregated - recycled – reused or disposed.

                        MATERIALS ON-SITE            DESTINATION

                                                     Re-use and Recycling       Disposal

                        Expected         Estimated On-site        Off-site      *specify contractor and landfill site
                        waste            volume    *specify       *specify      or other disposal site
                        materials        (m³)      proposed       contractor
                                                   re-use or      and
                                                   on-site        recycling
                                                   recycling      outlet
                                                   methods

                        Excavation
                        material

                        Green waste

                        Bricks

                        Concrete

                        Timber-
                        please
                        specify

                        Plasterboard

                        Metals -
                        please
                        specify

                        Asbestos

                        Other -
                        please
                        specify

                        The purpose of the Waste Management Plan is to facilitate the segregation of waste for
                        the effective reuse and recycling of such materials. Additionally Council rewards those who
                        segregate waste by significantly reducing disposal fees at the landfill some items are free.
                        Higher gate fees are charged for loads of mixed waste.

               81.    Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
                      pumps, etc.) shall comply with the following requirements:
                      The equipment shall be installed and located in a manner that prevents excessive noise in
                      accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices
                      (on-the-spot fines) may apply for offences.
                      A person must not use equipment on any day if it makes or causes noise to be made –
                      From 10pm to 7am: More than the lower of either –
                      a.      40 dB(A)


                                                                                                      Page 12 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 13

                       b.     3 dB(A) above the background noise level
                       c.     No audible noise for pool pumps apply during these hours.
                              From 7am to 7pm: More than the lower of either –
                       d.     50 dB(A)
                       e.     dB(A) above the background noise level
                       From 7pm to 10pm: More than 3 dB(A) above the background noise level.
               82.     Written certification is required from a suitably qualified person confirming that the noise
                       levels from all mechanical equipment comply with the above condition when measured at
                       either the residential boundary or outside the most exposed part of an affected building,
                       whichever is the closest to the equipment.
                       The assessment and certification is required immediately after installation of the equipment
                       and prior to any occupation of the building, and in a format approved by Council. This
                       assessment must take into account noise from any other fixed equipment on the property
                       e.g. swimming pool pump, heating/cooling equipment, etc that may increase the overall noise
                       level emitted.
                       Advice: It is highly recommended that the person you engage to certify the installation is
                       involved at the plan development stage so they can recommend where this equipment is
                       best located. They can also advise about noise enclosures and can make other suggestions
                       to avoid noise problems. It is a lot more costly to try and deal with noise problems after
                       everything is built.
               Additional Conditions 1 July 2019
               Staging
               83.     Should the development be staged, the staging sequence must be undertaken in accordance
                       with the approved master plan - staging plan.
               Sunset Clause for Completion of Approved Development
               84.     Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development
                       approval lapses if the whole of the approved use has not happened by 2 July 2026.
               5.      REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                     Referral Trigger       Referral Status    Referral Agency         Referral Address

                     Acid Sulfate Soils     Advice Agency      Department      of      PO Box 573
                                                               Natural Resources &     NAMBOUR QLD 4560
                                                               Water
               6.      ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               1.      The applicant is advised that development contributions and infrastructure charges
                       applicable to this change to a development approval (amended 1/07/2019) have been based
                       on the following Uses Class/ Uses and applicable quantities:-

                                Existing Development                     Approved Development
                            Existing Use          Existing        Existing Use Class /         Approved Quantity
                             Class / Use          Quantity         Use
                             Non-                                   Industrial Business
                                                 Vacant Land                                   5,769 m2
                              residential                             – Type 1 & 2



                                                                                                    Page 13 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 14

               2.     The applicant is informed that approval of this change to a development approval (amended
                      1/07/2019) will trigger an Amended Infrastructure Charge in accordance with the Coastal
                      Major Road Network Infrastructure Charges Plan for the estimated amount of $257,626.00
                      and is subject to variations in the Consumer Price Index, All Groups Brisbane from March
                      2019 until the date of payment. An Amended Infrastructure Charge Notice will be issued in
                      accordance with Chapter 5 of the Integrated Planning Act 1997.
               3.     Delete
               4.     The plans for the proposed building work have not been assessed for compliance with the
                      requirements of the Building Code of Australia as they relate to people with disabilities. Your
                      attention is drawn to the matter that either or both the Disability Discrimination Act 1992
                      (commonwealth) and the Anti-Discrimination Act 1991(Queensland) may impact on the
                      proposed building work.
                      Noosa Council recommends that the following matters be considered to address
                      equitable access and facilities in the building:-
                      a.      The building and environs should be designed to meet the requirements of the Human
                              Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises”
                              and AS1428.2;
                      b.      Applicants should be aware that a “Disability Standard on Access to Premises is being
                              developed and most likely will result in changes to the Building Code of Australia;
                      c.      Any services and facilities in the building complex must allow independent, dignified
                              and equitable use of the services and facilities for all people.
               5.     This proposal has not been assessed in relation to the spread of fire between properties /
                      buildings. It is the building certifiers responsibility to assess the requirements for fire services,
                      fire separation and appropriate methods of construction as part of the building works approval
                      process. Referral to the Queensland Fire and Rescue Service (QFRS) may be required as
                      part of the Building Approval process.
               6.     The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
                      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
                      building site in a way that makes or causes audible noise to be made from the building work:-
                      6.1. On a Sunday or public holiday, at any time; or
                      6.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
                      A maximum penalty of $1,500 applies to an offence under this legislation.
               7.     Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act
                      if the cost of operational works exceeds $80,000, then a portable long service leave levy is
                      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
                      the approved form issued by the Building and Construction Industry (Portable Long Service
                      Leave) Authority that confirms that the requirements of the Act have been satisfied. A
                      statutory declaration outlining the cost of the operational works must be submitted to Council
                      with the lodgement of any application for operational works over the site.
               8.     The applicant is advised that a Compliance Permit for all plumbing and drainage works within
                      the boundaries of the development site shall be obtained from Council’s Plumbing Services
                      Section prior to obtaining a Development Permit for Building Works.
               9.     Where any food premises is included in a development, the following is required:
                      9.1. Plans and application is to be made to Council’s Environmental Health Section for
                           approval prior to any building approval, fitting out or use of the premises.
                      9.2. A statement indicating the purpose of the food premises, type of food sold, proposed
                           menu and maximum number of patrons at any time, is to accompany the application
                           for plan approval.




                                                                                                           Page 14 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 15

                      9.3. Construction and use of the food premises should comply with Council’s Food
                           Premises Policy and the Food Safety Standards. (Both available from Council)
                      9.4. Toilets for customers and staff to be provided in accordance with Building Code of
                                    Australia. Obtain advice from a building certifier on numbers and standards,
                              including disable access.
                      9.5. Plans and approval is required for any mechanical exhaust ventilation system, which
                           should comply with AS1668. A certificate from the installer certifying the system
                           complies with the Standard must be obtained and lodged with Council prior to
                           commencement of trade.
                      9.6. Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006, must
                           obtain a Food License from Council, prior to use of those premises.
               10.    Where any part of the premises is proposed to be used for an industrial purpose defined as
                      an environmentally relevant activity under the Environmental Protection Act 1994 (E.g. motor
                      vehicle workshop, engineering workshop, plastic manufacturer etc), a separate development
                      approval and registration is required prior to commencement of that use.
               11.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
                      paint, cement, concrete, builder’s waste or rubbish should not be permitted to enter or be
                      placed where it could reasonably be expected to move into a roadside gutter, storm water
                      drain or a watercourse. On the spot fines apply for such offences.
                      Aboriginal Cultural Heritage Act 2003
               12.    There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person
                      who carries out an activity must take all reasonable and practicable measures to ensure
                      the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with
                      the duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      Additional Advisory Note 14 June 2016 (amended 01/07/2019)
               13.    An Infrastructure Agreement applies to this development that requires alternative
                      Infrastructure Contributions in accordance with the Noosa Shire Charges Resolution No.3
                      (2018) replacing the Contribution Conditions and Infrastructure Charge applied by the
                      original Development Approval.
                      All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.




                                                                                                         Page 15 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 16

               9.        FURTHER DEVELOPMENT PERMITS REQUIRED

                     Type of Development Permit required                   Subject of the required Development Permit
                     Development Permit for Building Works                 All Building Works

                     Development         Permit     for    Operational     Access, Carparking and Internal Pathways, Site Civil
                     Works                                                 Works, Stormwater Drainage including the Treatment
                                                                           Train, Frontage Works, Earthworks and Acid Sulphate
                                                                           Treatment, Erosion and Sediment Control and
                                                                           Landscaping

               10.       SUBMISSIONS

               Not applicable.
               11.       RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.       SELF ASSESSABLE CODES

               The developer must comply with the following codes for self-assessable development related to
               the development approved under this Decision Notice:
               Advertising Devices Code
               13.       OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.

               Yours faithfully




               Tara Norley
               Senior Development Planner



               Enc:      Referral Agency Response
                         Appeal Rights
                         Approved Plans/Documents
               cc.       Unitywater

               DECISION NOTICE HISTORY
               •     Original Decision Notice – 2 July 2008.

               •     Decision Notice – Minor – 132007.738.01 – 9 April 2013, Extension of time.

               •     Decision Notice – Minor – 132007.738.02 – 14 June 2016, Extension of time.

               •     Decision Notice – Minor – 132007.738.03 – 3 October 2018, Returned.

               •     Decision Notice – Minor – 132007.738.04 – 21 June 2019, amend condition 1, 3, 8, 10, 22, 24, 31, 32, 43, 44, 45, 50, 51, 52 &
                     68, delete item 6, include additional conditions 83, & 84, amend advisory notes 1, 2, & 13 and delete advisory note 3.

               •     Decision Notice – Minor – 132007.738.05 – 26 February 2024, amend condition 1.




                                                                                                                                Page 16 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

Page 17

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 17 of 17
Document Set ID: 22829529
Version: 4, Version Date: 29/02/2024

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.