Skip to the record
The only place to find full transcripts.

Council archive · source document

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12/0208

of 134

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (65.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

LANE SUMMARY                                                                                                         Site: 14AM BG+Dev Existing

Walter Hay Drive/Eenie Creek Road
2014 AM Peak Background+Development Traffic
Existing Layout
Roundabout




 Lane Use and Performance
                         Demand Flows                           Deg     Lane     Average   Levelof 95% Back of Queue        Lane     SL     Cap. Prob
                     L        T      R   Total   HV    Cap.     Satn    Uti I.             Service   Vehicles   Distance
                                                                                  Delay                                     Length   Type    Adj. Block
                veh/h veh/h veh/h        veh/h    % veh/h         v/c     %          sec                 veh           m        m             %      %
 South: Wa~er Hay Drive

 Lane 1          153          0      0    153 5.0      891         P     100         5.2    LOSA         0.8          6.0     280            0.0    0.0

 Lane 2              0     381    480     861    5.0   1222        P     100        11.5    LOSA         6.9         50.2     280            0.0    0.0

I Approach       153       381    480    1014 5.0              0.705                10.6    LOSA         6.9         50.2

 East: Eenie Creek Road

 Lane 1          348       271       0    619 5.0      1400        P     100         4.2    LOSA         3.3         24.2     500            0.0    0.0

 Lane 2              0     257    239     496 5.0      1121        P     100         8.5    LOSA         3.1         22.4     500            0.0    0.0

 Approach        348       527    239    1115 5.0              0.442                 6.1    LOSA         3.3         24.2

 North: Walter Hay Drive
 Lane 1          217       254     56     526 5.0      737         P     100        13.7    LOSA         7.2         52.7     500            0.0    0.0

 Approach        217       254     56     526 5.0              0.714                13.7    LOSA         7.2         52.7

 West: Eenie Creek Road

 Lane 1           63       355       0    418 5.0      875         P     100        10.1    LOSA         5.6         40.8     140            0.0    0.0

 Lane 2              0     193     69     262 5.0      549         P     100        16.7    LOS B        4.7         34.2     140            0.0    0.0

 Approach         63       547     69     680 5.0              0.477                12.6    LOSA         5.6         40.8


 Intersection                            3335    5.0           0.714                10.0    LOSA         7.2         52.7



P: You need to Process this Site (F9)for this variable to be computed.


Level of Service (LOS)Method          Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.




                                                                                                                                                      -
Processed: Tuesday, 28 August 2012 4:03:43 PM                 Copyright @ 2000-2011 Akcelik and Associates Ply LId           SIDRA                  .-


SIDRA INTERSECTION 5.1.5.2006                                 www.sidrasolutions.com
                                                                                                                             INTERSECTION
Project: G:\510119   -
                         Lake Weyba DA\510119 Modelling\5 Walter Hay_Eeinie Creek 120828.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
65.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12_0208.pdf · 65.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.