Skip to the record
The gold standard in government transparency.

Council archive · source document

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12/0208

of 134

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (65.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

LANE SUMMARY                                                                                                         Site: 24PM BG+Dev Existing

Walter Hay Drive/Eenie Creek Road
2024 PM Peak Background+Development Traffic
Existing Layout
Roundabout




 Lane Use and Performance
                         Demand Flows                           Deg     Lane     Average   Levelof 95% Back of Queue        Lane     SL     Cap. Prob
                     L        T      R   Total   HV    Cap.     Satn    Uti I.             Service   Vehicles   Distance
                                                                                  Delay                                     Length   Type    Adj. Block
                veh/h veh/h veh/h        veh/h    % veh/h         v/c     %          sec                 veh           m        m             %      %
 South: Wa~er Hay Drive

 Lane 1           99          0      0     99 5.0      810         P     100         5.4    LOSA         0.6          4.6     280            0.0    0.0

 Lane 2              0     268    506     775 5.0      1094        P     100        13.2    LOSA         7.4         53.7     280            0.0    0.0

I Approach        99       268    506     874 5.0              0.708                12.3    LOSA         7.4         53.7

 East: Eenie Creek Road

 Lane 1          482       250       0    732 5.0      1195        P     100         6.6    LOSA         6.5         47.2     500            0.0    0.0

 Lane 2              0     354    212     566 5.0      923         P     100        10.8    LOSA         5.9         43.4     500            0.0    0.0

 Approach        482       604    212    1298 5.0              0.613                 8.5    LOSA         6.5         47.2

 North: Walter Hay Drive
 Lane 1          246       382     95     723 5.0      678         P     100        97.5    LOS F       49.7      362.8       500            0.0    0.0

 Approach        246       382     95     723 5.0              1067                 97.5    LOS F       49.7      362.8

 West: Eenie Creek Road

 Lane 1          147       383       0    531    5.0   979         P     100        10.0    LOSA         6.9         50.5     140            0.0    0.0

 Lane 2              0     202    137     339 5.0      625         P     100        16.8    LOS B        5.7         41.8     140            0.0    0.0

 Approach        147       585    137     869 5.0              0.542                12.6    LOSA         6.9         50.5


 Intersection                            3764    5.0           1.067                27.4    LOS B       49.7      362.8



P: You need to Process this Site (F9)for this variable to be computed.


Level of Service (LOS)Method          Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.




                                                                                                                                                      -
Processed: Tuesday, 28 August 2012 4:03:45 PM                 Copyright @ 2000-2011 Akcelik and Associates Ply LId           SIDRA                  .-


SIDRA INTERSECTION 5.1.5.2006                                 www.sidrasolutions.com
                                                                                                                             INTERSECTION
Project: G:\510119   -
                         Lake Weyba DA\510119 Modelling\5 Walter Hay_Eeinie Creek 120828.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
65.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12_0208.pdf · 65.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.