Skip to the record
The only place to find full transcripts.

Council archive · source document

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12/0208

of 134

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (65.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

LANE SUMMARY                                                                                                      Site: 24PM BG+Dev Mitigated

Walter Hay Drive/Eenie Creek Road
2024 PM Peak Background+Development Traffic
Mitigated Layout
Roundabout




 Lane Use and Performance
                         Demand Flows                           Deg     Lane     Average   Levelof 95% Back of Queue        Lane     SL      Cap. Prob
                     L        T      R   Total   HV    Cap.     Satn    Uti I.             Service   Vehicles   Distance
                                                                                  Delay                                     Length   Type     Adj. Block
                veh/h veh/h veh/h        veh/h    % veh/h         v/c     %          sec                 veh           m        m              %      %
 South: Wa~er Hay Drive

 Lane 1           99          0      0     99 5.0      835         P      1i         5.4    LOSA         0.6          4.4     280             0.0    0.0

 Lane 2              0     268    506     775 5.0      1127        P     100        12.9    LOSA         6.8         49.9     280             0.0    0.0

I Approach        99       268    506     874 5.0              0.687                12.0    LOSA         6.8         49.9

 East: Eenie Creek Road

 Lane 1          482       254       0    736 5.0      1294        P     100         5.1    LOSA         4.5         33.0     500             0.0    0.0

 Lane 2              0     350    212     562 5.0      989         P     100         9.1    LOSA         4.2         31.0     500             0.0    0.0

 Approach        482       604    212    1298 5.0              0.568                 6.9    LOSA         4.5         33.0

 North: Walter Hay Drive
 Lane 1          246       181       0    428 5.0      904         P     100         7.7    LOSA         3.8         28.0      40 Turn Bay    0.0    0.0

 Lane 2              0     201     95     295    5.0   625         P     100        12.1    LOSA         3.3         23.9     500             0.0    0.0

 Approach        246       382     95     723 5.0              0.473                 9.5    LOSA         3.8         28.0

 West: Eenie Creek Road

 Lane 1          147       383       0    531    5.0   991         P     100         9.8    LOSA         6.7         49.2     140             0.0    0.0
 Lane 2              0     202    137     339 5.0      633         P     100        16.6    LOS B        5.6         40.9     140             0.0    0.0

 Approach        147       585    137     869 5.0              0.536                12.5    LOSA         6.7         49.2


 Intersection                            3764    5.0           0.687                 9.9    LOSA         6.8         49.9



P: You need to Process this Site (F9)for this variable to be computed.


Level of Service (LOS)Method: Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.


5 Lane underutilisation determined by program


                                                                                                                                                       -
Processed: Tuesday, 28 August 2012 4:03:45 PM                 Copyright @ 2000-2011 Akcelik and Associates Ply LId           SIDRA                   ..    ..


SIDRA INTERSECTION 5.1.5.2006                                 www.sidrasolutions.com
Project: G:\510119   -
                         Lake Weyba DA\510119 Modelling\5 Walter Hay_Eeinie Creek 120828.sip
                                                                                                                             INTERSECTION
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
65.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12_0208.pdf · 65.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.