Skip to the record
For the highest quality transcripts.

Council archive · source document

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12/0208

of 134

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (65.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

LANE SUMMARY                                                                                                                Site: 24 PM BG Existing

Emu Mountain Road/Walter Hay Drive/Eumarella Road
2024 PM Peak Background Traffic
Existing Layout
Roundabout




 Lane Use and Performance
                         Demand Flows                           Deg     Lane     Average   Levelof 95% Back of Queue        Lane     SL      Cap. Prob
                     L        T     R    Total   HV    Cap.     Satn    Uti I.             Service   Vehicles   Distance
                                                                                  Delay                                     Length   Type     Adj. Block
                veh/h veh/h veh/h       veh/h     % veh/h         v/c     %          sec                 veh           m        m              %      %
 South: Emu Mountain Road

 Lane 1          283       107      0     390 5.0      1458        P      986        3.5    LOSA          1.7        12.3     500             0.0    0.0

 Lane 2              0     512     24     536 5.0      1971        P     100         3.6    LOSA          1.8        13.3     140 Turn Bay    0.0    0.0

I Approach       283       619     24     926 5.0              0.272                 3.5    LOSA          1.8        13.3

 East: Eumarella Road

I Lane 1             3       16    21      40 5.0      916         P     100         9.4    LOSA         0.2          1.4     500             0.0    0.0

 Approach            3       16    21      40 5.0              0.044                 9.4    LOSA         0.2          1.4


 North: Walter Hay Drive
 Lane 1           24       428      0     452 5.0      1534        P     100         3.5    LOSA          1.7        12.5     500             0.0    0.0

 Lane 2              0     206    160     366    5.0   1242        P     100         7.3    LOSA          1.6        11.9     150 Turn Bay    0.0    0.0

 Approach         24       634    160     818 5.0              0.295                 5.2    LOSA          1.7        12.5

 West: Emu Mountain Road

 Lane 1          178         12     0     190 5.0      1016        P     100         4.7    LOSA         0.9         6.5      500             0.0    0.0

 Lane 2              0       18   234     252 5.0      1348        P     100        11.7    LOSA          1.0        7.1      200 Turn Bay    0.0    0.0

 Approach        178        31    234     442 5.0              0.187                 8.7    LOSA          1.0        7.1


 Intersection                            2226    5.0           0.295                 5.3    LOSA          1.8        13.3



P: You need to Process this Site (F9)for this variable to be computed.


Level of Service (LOS)Method         Delay (RTA NSW).
Lane LOS values are based on average delay per lane.
Intersection and Approach LOS values are based on average delay for all lanes.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model used.


6 Lane underutilisation due to downstream effects


                                                                                                                                                       -
Processed: Tuesday, 28 August 20122:41 :33 PM                 Copyright @ 2000-2011 Akcelik and Associates Ply LId           SIDRA                   ..    ..


SIDRA INTERSECTION 5.1.5.2006                                 www.sidrasolutions.com
                                                                                                                             INTERSECTION
Project: G:\510119   -
                         Lake Weyba DA\510119 Modelling\2 Emu Mountain_Walter Hay_Eumarella 120828.sip
8000955, CARDNO, ENTERPRISE

Used in these records

About this file

File size
65.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 15 of 37 Appendix 13 - Traffic Assessment MCU12_0208.pdf · 65.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.