Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Code assessment

of 25

Page text shows just the words. Original shows the document exactly as it was published.

       areas and provides for
       the clustering of lots into
       cleared areas.

Infrastructure                       No acceptable outcome provided       Complies with PO10
                                                                          The site can be connected to
PO10                Development                                           telecommunication and electrical
accommodates and provides for                                             services. Each lot will be
the efficient and timely delivery                                         provided with water tanks and
of infrastructure appropriate to                                          an on-site effluent disposal
the site’s setting and intended                                           system.
use.

PO11 Roadway and pathway             No acceptable outcome provided       Not applicable
layout      are    predominantly
rectilinear with a high degree of
permeability.

Editor’s Note— Further detail on
traffic and the road network is
addressed     in   Part   9.4.8
Transport Code

PO12 New lots are located, sized     AO12.1 All lots are connected to     Can comply with AO12.1
and configured so as to ensure       power          supply         and    Each lot can be connected to
each lot is capable of being         telecommunications services and      power        supply          and
serviced by appropriate levels of    where located within the Urban       telecommunications services.
infrastructure including:            boundaries, power supply and
    1. power supply;                 communications      infrastructure
   2. telecommunications; and        are provided underground.
   3. where within Local Plan        AO12.2 If located in a water         Not applicable
      Areas                          service area each new lot can be     The site is not located in a water
   4. reticulated water supply;      connected to Unitywater’s water      service area. Water tanks will be
   5. reticulated sewerage; and      supply network.                      provided to service each lot.
   6. stormwater drainage.
                                     AO12.3                               Not applicable
                                     If located in a sewerage service     The site is not located in a
                                     area each new lot can be             sewer service area. See AO12.5.
                                     connected      to   Unitywater’s
                                     sewerage network.

                                     AO12.4                               Not applicable
                                     If located in a Local plan area
                                     lots can be connected to
                                     Council’s stormwater drainage
                                     network.

                                     AO12.5                               Complies with AO12.5
                                     If not in a sewerage service area    Refer On-Site Effluent Disposal
                                     each lot has sufficient area and     Plan prepared by Australian Soil
                                     other attributes to ensure           Investigations.
Log in to download the original file

Code assessment.pdf · 339 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.