Original source · versioned page text
Attachment 4 -Email from Core
Attached to the e-mail RAL21/0007 - PART Response to Information Response (Email 1 of 2).
Jennifer Mullaney From: Josh Mitchell <[email protected]> Sent: Thursday, 22 April 2021 9:46 AM To: Jennifer Mullaney Subject: RE: [#202573] 111 Lake Weyba Drive - RFI (202573-G) Hi Jen, Core’s report (J001184-001-R-Rev0, dated October 2020) was written and does take into consideration Table 13.14. However at the time of writing the report there we no details provided on volume of fill, depth of fill etc. However, it is unlikely that filling of this site would result in actual ASS being moved below the water table (the existing levels are low to negligible) as per Column 2 dot point C (i.e. Compliance with Partial solution S25.1). Thanks, Josh Mitchell | BSc(EnvScience) MEIANZ CEnvP CPSS | Director T: +61 7 5475 5900 M: +61 408 984 011 E: [email protected] | W: www.coreconsultants.com.au From: Jennifer Mullaney <[email protected]> Sent: Thursday, 25 February 2021 11:33 AM To: Josh Mitchell <[email protected]> Cc: Chris Camp <[email protected]> Subject: [#202573] 111 Lake Weyba Drive - RFI (202573-G) Hi Josh, We have received the attached RFI for 111 Lake Weyba Drive. Can you please review item 8 and provide initial comment. Table 13.14 is below. I think they are clutching at straws to be honest. I believe the report covers all the relevant items below. 1
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 4 -Email from Core.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.