Original source · versioned page text
2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
community
consultation. Summary – all sites
Shoreline length (all sites) = 497 m
Total reef footprint (all sites) = 2268m2
(0.27 hectares)
Se;(A4.3) Monitoring 19. Annual monitoring and Complete Baseline monitoring undertaken in July
and evaluation study evaluation report card with 6 2022 by consultants, Ecological Service
for both pilot and full monthly status reports to be Professionals.
restoration sites. provided
Monitoring to See Annex 43
include oyster
metrics, Post construction monitoring
invertebrates, and commences Autumn 2023, then
fish use (detailed in annually till 2027.
MER plan).
(A5.1) Run workshop 20. Workshop completed Achieved 2019 workshop held between TNC and
with Noosa Council NC while Alliance and Funding
to identify ongoing Agreement was being finalized. Results
focus areas for TNC incorporated into agreement activities.
support.
*(A5.2) Provide 21. Minimum of 5 peer review Achieved TNC have provided two peer reviews as
technical/peer reports completed during three- requested by Noosa Council:
review on minimum year term of this agreement, as 1. Draft Noosa River Plan
five requested by Noosa Council
plans/reports/studies See Annex 21
if requested by
Noosa Council. 2. Fishing Futures Report
See Annex 22
*(A5.3) Facilitate a 22. Minimum of 3 study tours Cancelled Study tours hindered by COVID-19
minimum of three completed during the three-year travel restrictions and were not
study tours of term of this agreement, as requested.
relevant sites in line requested by Noosa Council.
with objectives and TNC invited NC to participate in the
scope of the International Conference for Shellfish
program in Reef Restoration in 2021, and to
Australia/US if undertake tours, but declined due to
requested by Noosa pressing work commitments.
Council (flights and
incidentals covered
separately by Noosa
Council,
accommodation and
in country travel
covered by this
Grant).
*(A5.4) Develop a 23. Conservation Action Plan and Actions TNC actively engaged with council staff
conservation action Community Workshops completed, were not on river management issues as
plan for specific as required required requested.
issues (not yet
determined) for the TNC, in partnership with ecological
Noosa Estuary consultancy firm, Ecological Service
(including Professionals (ESP), delivered a status
17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.