Community feedback about construction
As per the permit requirements, TNC maintained a formal community feedback and complaints mechanism for the
construction process. A specific email address was generated to receive complaints and concerns. Local residents could also
use this contact point to ask for more information, and to volunteer for project activities.

TNC also tracked complaints and concerns registered with NC and State Member for Noosa, The Honourable Sandy Bolton
(MP).

Throughout construction, one formal complaint was received, and one concerned resident contacted council, with whom
TNC is following up (Table 7).

Most public interest in the construction works was seen in the first few days as the load out site was being established. Many
curious onlookers dropped by and talked with the construction team from M&J Marine Services. M&J reported to TNC that
there were no complaints and people seemed more curious than concerned.

Table 7: Complaints received during the construction process

 Person / Group                 Complaint / Objection

 Community member               Issue with the load out site. Does not believe this is a suitable use of a foreshore
                                area. Expressed general concerns about shoreline uses and the need for shoreline
                                restoration throughout the river system. Would like Noosa River Stakeholder
                                Advisory Committee (NRSAC) consulted on the establishment of load out sites, and
                                other similar shoreline uses, in the future.

 Noosa Sound Resident           Contacted NC, concerned about construction works at Noosa Sound East restoration
                                site. TNC has offered to talk to the resident about the project and will ascertain the
                                nature of the concern and reasoning behind it.


TNC also offered inspections of the restoration sites to NC staff and to The Hon. Sandy Bolton. Both accepted. Ms Bolton was
given tour of the reefs, a view of construction works underway in Noosa Sound East, spoke with the contractor and received
a detailed briefing about the construction process (Figure 16). Ms Bolton’s social media post of the reef inspection received
only positive community feedback.




Figure 16: MP Sandy Bolton and team being briefed about the reef build to help them better communicate with local
constituents. Photo by M. Connell.




                                                                                                                           42
Log in to download the original file

2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.