Original source · versioned page text
2022-10-24 General Committee Meeting- Item 7 - Attachment 1 - Noosa Oyster Ecosystem Restoration Project - Final Report (1)
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Bathymetric and
intertidal mapping
Seabed and complex
intertidal surveys
undertaken of 4
restoration sites.
Work undertaken by
North Group Pty Ltd.
See Annex 5 (pg. 42)
Ecological
assessments
Undertaken at
potential restoration
sites by Ecological
Service Professionals.
See Annex 5 (pg. 43)
55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.