Original source · versioned page text
Acid Sulfate Report
Attached to the e-mail Additional Items for Information Request - MCU17/0076 & OPW17/0224.
25 EDWARD STREET, NOOSAVILLE PROPOSED DUPLEX DEVELOPMENT 6.3 Quantitative Laboratory Analysis Quantitative laboratory analyses were completed on 6 samples using the Chromium Reducible Sulfur (SCR) suite of testing in order to quantify the severity and nature of any acidity or potential acidity present in the soil profile. The quantum of any actual acidity was assessed using Titratable Actual Acidity (TAA), and potassium-chloride extractable sulfur (SKCl) was used to assess the nature of the measured actual acidity. Potential acidity was measured by the SCR method which specifically measures inorganic oxidisable sulfur. These methods are set out in the QASSIT guidelines and associated ASS management documents. Based on the nature of the proposed disturbance an action criteria of 0.03%S (18 mol H+ per tonne) was adopted for comparison with the combined actual and potential acidity results. Samples obtained from BH1, and above the groundwater table in BH2 (typically 0.0 m to 1.0 m BGL), contained no actual or potential ASS above the defined action criteria. Samples obtained from below the groundwater table in BH2 (typically below 1.0 m BGL) contained no actual acidity, but did contain levels of PASS which exceeded the 0.03%S action criteria, ranging from 0.039%S to 0.062%S. 6.4 Risk Characterisation Sands sampled from below the groundwater table (below 1.0 m BGL), from BH2 were characterised as containing levels of oxidisable sulfur (PASS), averaging 0.05 %S (31 mol H+ per tonne). This material presents a moderate risk if disturbed, and should be avoided where possible. This underlying acidic soil is not likely to be disturbed by the proposed works and thus presents a low risk to the overall development of the site. Where construction of deep stormwater/sewer infrastructure or the proposed pool is expected to disturb soil from below 1.0 m BGL, the risk posed by disturbance of potential acidity within the underlying sand may be mitigated by conventional lime neutralisation of the disturbed material, combined with management of any construction site runoff. Recommended measures for management of acidic, non-sulfuric soil are set out in Section 7.0 below. 7.0 MANAGEMENT RECOMMENDATIONS Where works are only expected to disturb soils within 1.0 m of the existing ground surface, these works may proceed without specific management measures for ASS. However, should disturbance of the sands at and below 1.0 m BGL occur, the following management measures should be adopted: ▪ Where sands below 1.0 m BGL are disturbed, fine grained agricultural lime shall be mixed with the disturbed material prior to treated material being reused on site, or exported off site. The neutralising agent (fine grained agricultural lime) shall be applied at a rate of 2 kg per cubic metre. It is anticipated that the only works which may disturb this material would be for construction of sewer reticulation, to tie in with the existing sewer main. Some of the deeper pool construction may also be likely to disturb soils below 1.0 m BGL. This is expected to disturb less than 100 m 3 of acidic material in total, therefore the total risk associated with the works is very low. ▪ Verification testing for confirmation of effective neutralisation of treated soil is not considered a suitable for these works. However, effective treatment should be demonstrated by maintaining records of lime delivered and used on site, which shall be maintained by the contractor. It is also recommended that photographic evidence of lime treatment be recorded and maintained where lime treatment is undertaken. ▪ It is expected that conventional erosion and sediment control measures shall be applied in accordance with current industry best practice to contain and control site runoff during construction. This will help to mitigate any potential for mobilisation of acidity to ground and surface waters as a result of the works. ▪ Contained site water should be monitored and maintained within a pH range of 6.5 to 8.5. 25 August 2017 Report No. 17265-001-Rev0 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.