Council archive · source document
Attachment 4 - Revised Concept Stormwater Plan · MCU13/0251
Attached to the e-mail MCU13/0251 - Peregian Village Market response to information request.
Plans and drawings: the text below has words only, no drawings.
LEGEND
| fe ——- FLOW DIRECTION
—s*— PIPED DRAINAGE
BIORETENTION SYSTEM
DETENTION TANK
DETEN TI@uaLQN K
~~ STORMTRAP 9 NGee2RODUCT
4
! —~ CARPARKS TO BE GRADED TO
= eg 8 CY "FACILITATE SHEET FLOW
, 16 \ es Apo’ fe | TOWARDS BIORETENTION
BIORETENTION SYSTEM DESIGN PARAMETERS SYSTEMS, AS INDICATED.
: EXTENDED DETENTION
LD. FILTER AREA (m?)|FILTER DEPTH (m) DEPTH (m)
BIO 1a & BIO 1b
(COMBINED) 20 0.40 0.15
BIO 2 10 0.40 0.15
BIO 3 16 0.40 0.15
BIO 4a & BIO 4b
(COMBINED) 10 0.40 0.15 =~
WN o-B-cormats DRAWN | BN CLIENT TILE
ENVIRONMENT+ DESIGNED [BN] SCANLON PROPERTY GROUP OPERATIONAL CONTROL
a CONCEPT PLAN
CONS Tua] S| ORM WATER MANAGEMENT PLAN SEAN NGNS a
GriDAER | WA |7 PEREGIAN VILLAGE MARKET $C13-0128-004
DATE | REVISION DETAILS APPROVED
"Thureday, 12 December 2013 23028 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Revised Concept Stormwater Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 516 KB (small file)
- File type
No other editions are linked here.