Clear felling with heavy machinery is not proposed. Trees are selectively felled in a controlled
fashion to avoid inadvertent damage to trees for retention (and minimise dust plumes
associated with clearing).
The construction process is also to be sensitive in that heavy machinery, and earthworks are not
proposed. Construction is also limited to small areas of the site at any one time. The approved
Construction and Tree Management Plan outlines the process for vegetation protection and low
impact construction.
The rehabilitation plan will establish the entirety of the balance land with native vegetation. This
will further buffer/separate the road reserve population.
Physical Protection of Plants during Construction
The Construction and Tree Management Plan describes the construction measures to ensure
trees for retention are retained and inadvertent vegetation clearing is avoided. The road reserve
population occurs south of the subject land. A construction/tree protection fence would be
established along the southern boundary to prevent inadvertent clearing (or access) to this area.
The boundary is already partially cleared due to the existing infrastructure (e.g. cables) in this
area.
In addition, the vines (refer Figure 1) are also located south of large trees, meaning the trees
provide additional (physical) protection from any movement from the north (e.g. any machinery
moving southwards would not pass the large trees in any event 3).
Long-term Protection and Survival in Perpetuity
The group of vines are protected “from the development” (i.e. nature based accommodation) in
the long term by way of physical separation and associated rehabilitation as described above.
Rehabilitation and Weed Management
A site based rehabilitation plan has been approved for the subject land. The treatment of weeds
(including the invasive frangipani vine) and planting with native species on the subject land (i.e.
Lot 3 managed by RACV) will enhance the general ecological values of the local landscape.
Due to the poor condition of the subject land, specifically high level of weed infestation and
limited (to no) native understorey and midstorey, the rehabilitation exercise ensures a significant
improvement to the local environment (i.e. by establishing a native ecosystem that currently is
absent).
Establishing a Protected Population
The rehabilitation plan includes the planting of at least 67 Fraser Island vines in Zone 5. While
the vine is listed as near-threatened, it is readily available from nurseries and commonly used
as a screen/climbing plant. This species could (at the discretion of RACV) be further considered
in landscaping associated the subject land and existing resort.
3
Noting none should be in this area for the project.
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4A - Updated Arborist Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.