SUPERSEDED - Minor Change Existing Approval 131999.982622.5

of 11

Page text shows just the words. Original shows the document exactly as it was published.

      Application No.     Type of Development

      131999.982622.2 Change to Development Approval – New Toiletsl

     A.    The approved plans to comprise those numbered DA02 Issue B, DA03 Issue A, DA04
           Issue B, prepared by Husband Leith Architects and dated 1 July 2004.
     B.    Include conditions. Refer to the conditions below.
    In relation to the request to make a change to a Development Approval – Addition of Shade
     Structures & Landscaping, Council on 15 September 2006, decided to approve the
     requested change.
      Application No.     Type of Development

      131999.982622.3 Change to Development Approval - Addition of Shade Structures &
                      Landscaping

     Refer to Conditions below.
    In relation to the request to make a change to a Development Approval – Infill of Shade
     Structures, Council on 2 November 2006, decided to approve the requested change.
      Application No.     Type of Development

      131999.982622.4 Change to Development Approval – Infill of Shade Structures

     Refer to Conditions below.
    In relation to the request to make a minor change to the existing approval, Council on 15
     March 2018, decided to approve the requested changes. The changes are detailed below.
      Application No.     Type of Development

      131999.982622.5 Minor Change to Development Approval

     A.    Agree to change conditions 14, 15, 26, 27 and 29
     B.    Refuse to amend condition 23
     C.    Include new conditions 37, 38 and 39, 40 & 41
3.   CURRENCY PERIOD OF APPROVAL

The currency period for this development approval is 4 years starting the day that the original
development approval took effect.
4.   ASSESSMENT MANAGER CONDITIONS

     BUILDING

1    The plans submitted for a Development Permit for building works are to comply with the
     approved plans.
2    An identification survey of the subject site is to be carried out by a Licensed Surveyor and is
     to be submitted to Council at the time of foundation inspection or immediately thereafter.
     Such survey shall set out the boundaries of the site and the position of the buildings on the
     site.
3    A verification survey is to be undertaken on the building by a Licensed Surveyor and a
     certificate lodged with Council at completion of the work confirming compliance with the
     minimum required floor level, or the maximum building height above natural surface, required
     by the provisions of the Town Planning Scheme.



                                                                                      Page 2 of 11
Log in to download the original file

SUPERSEDED - Minor Change Existing Approval 131999.982622.5.pdf · 446 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.