SUPERSEDED - Minor Change Existing Approval 131999.982622.5
18. Roof and surface water is to be collected on site and is to be discharged in accordance with
Council’s Engineering Design Standards. A Development Permit for Building Works shall
not be granted until a Development Permit for Operational Works has been issued in regard
to the drainage scheme.
19. The existing concrete footpath along Gibson Road adjacent to the new retail extensions shall
be extended along the frontage of the site to the proposed pedestrian crossing within the car
parking area. A Development Permit for Operational Works shall be obtained prior to the
commencement of any works. Footpath and property alignment levels may be obtained from
the Works Inspector-Development upon request.
20. The concrete footpath is to be designed and constructed to ensure pedestrian safety using
non-slip materials and to produce an evenly graded surface finish.
21. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP 28
and PSP 30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as at December 1999, under the current policies is as follows:-
Water Supply $2,168
Sewerage $2,913
______________________
TOTAL: $5,081
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively, a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
22. Alteration of any public utility or other facilities necessitated by the development of the land
or associated construction works external to the site shall be at no cost to Council.
23. Minimum Floor Heights for the development shall be in accordance with the Planning
Scheme at the time of issue of the Building Permit.
24. Fill levels in accordance with Council’s Noosaville Master Drainage Plan will be provided on
application to Council's Works Department. If any filling works are required on the site, they
shall be carried out in accordance with Section 3.8 of Council's "Engineering Design
Standards" manual. No earthworks or filling works are to be undertaken until issue of a
Development Permit for Operational Works -Filling.
25. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with
any Development Permit for Operational Works. Site control measures such as silt fencing,
controlled gravel access to the site and controlled disposal of waste, may be necessary. Prior
to commencement of Operational Works and/or Building Works, all physical site control
measures shall be installed, and the plan adhered to.
Prior to commencement of Operational Works a $2,000 site control bond is required to be
lodged with the Council to ensure compliance with this condition.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
this condition or any additional inspections incurred for substandard work or works
undertaken not in accordance with this permit.
Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.