Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Planning Report · RAL26/0027

of 15

Text shows just the words. Original shows the document exactly as it was published.

4       LEGISLATIVE MATTERS

4.1     PLANNING ACT 2016

The Planning Act 2016 is the overriding legislation for this Development Application. Compliance with the Act and
any subordinate legislation will be demonstrated and where any conflict exists with compliance, sufficient
justification will be provided.



4.2     STATE PLANNING POLICY

The subject land has been identified as containing state interests and therefore the State Planning Policy (SPP) is
applicable to the development. These interests are detailed in Table 2 below.

Table 2: State Interests
 State Interest                                         Details

 Natural Hazards Risks and Resilience                   Flood hazard area – Local Government flood mapping area

 Strategic Airports and Aviation Facilities             Obstacle limitation surface area

Part 2 of the Noosa Plan 2020 states that the State Planning Policy has been integrated into the planning scheme
and therefore this report is not required to address the above state interests.



4.3     SOUTH EAST QUEENSLAND REGIONAL PLAN

The subject land is located in the Urban Footprint of the South East Queensland Regional Plan and the
development is consistent with the intent of the South East Queensland Regional Plan.



4.4     DEVELOPMENT REFERRALS FOR ASSESSMENT

In accordance with the Planning Regulation 2017, the development will require referral for the following matter:

Table 3: Referral Triggers
 Relevant Provisions of the Planning Regulation 2017 Triggered by the Application                  Referral Authority

 Premises contaminated because of unexploded ordnance: Schedule 10, Part 4, Division 3, Table 1          SARA
 – Reconfiguring a Lot that is assessable development under s 21

      Development application for the following development, if all or part of the premises are
      shown as an area of substantial unexploded ordnance potential in a mapping layer in the
      development assessment mapping system published on the department’s website—

          (a) reconfiguring a lot that is assessable development under section 21;
          (b) a material change of use that is assessable development under a local categorising
              instrument




Planning Report | 2 & 4 Paldao Rise, Peregian Beach | 28/09/2026                                              11

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Planning Report.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.