Traffic Engineering Letter
To Threedom Nominees Pty Ltd Date 5 June 2026
Prepared Bradley Fuller, Modus Harj Singh, Modus
Approved by
by Senior Traffic Engineer Executive Director (RPEQ 22364)
Location 220 Black Mountain Range Road, Black Mountain
Subject Proposed Subdivision Development - Traffic Engineering Letter
Appendix A: Development Plans
Status Final Attachments
Appendix B: Sight Distance Review
Introduction
Overview
Modus has been commissioned by Threedom Nominees Pty Ltd to provide traffic and transport
advice in relation to the proposed Subdivision development located at 220 Black Mountain Range
Road, Black Mountain.
This Traffic Engineering Letter has been produced by Modus to assess the traffic and transport
engineering items in support of the proposed development. A copy of the proposed development plans
are provided at Appendix A.
Modus has completed this Traffic Engineering Letter in accordance with the usual care and
thoroughness of the consulting profession. The assessment is based on accepted traffic engineering
practices and standards applicable at the time of undertaking the assessment.
Modus disclaims responsibility for any changes to project planning or road conditions that may occur
after completion of the assessment.
Site Location
The development site is located at 220 Black Mountain Range Road, Black Mountain and is bounded
by the Bruce Highway to the north, Residential uses to the east, as well as Black Mountain Range
Road to the south and west.
Furthermore, the development site is currently situated within the Noosa Shire Council Local
Government Area.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.
Full text of the other 16 pages
Page 2
Black Mountain Range Road Black Mountain Range Road is a low order Council Road accommodating an undivided two (2) lane sealed formation, which changes in horizontal and vertical road alignment along the road extent. Furthermore, Black Mountain Range Road accommodates a typical posted speed limit of 80 km/hr, in addition to a localised speed limit of 60 km/hr for a distance of 2.4km (of which apples along the site frontage). Table 1 illustrates the typical formation of Black Mountain Range Road along the road extent Table 1 Black Mountain Range Road Formation Traffic Engineering Letter 220 Black Mountain Range Road, Black Mountain - 2 -
Page 3
Proposed Development Overview The proposed development will comprise a five (5) Lot Residential Subdivision as illustrated below on Figure 1. Figure 1 Proposed Development Layout Access Arrangements As part of the proposed development, access will be achieved on the following basis: N Lot 1: A new access point on Black Mount Range Road to the west, N Lot 2: A new access point on Black Mount Range Road to the south, N Lot 3: As per the existing access point for a Residential Dwelling onto Black Mount Range Road, N Lot 4 and 5: A new dual access point onto Black Mount Range Road to the south. Traffic Engineering Letter 220 Black Mountain Range Road, Black Mountain - 3 -
Page 4
Access Review
Sight Distance Criteria
For the purposes of the assessment herein, Modus has applied the following sight distance criteria:
N Domestic property access vehicle sight distance as per Australian Standards 2890.1, which
corresponds to a minimum sight distance of 55m for a domestic property fronting a 60km/hr
road,
N Stopping Sight Distance (SSD) as per the Austroads Guide to Road Design series
accommodating the following values:
• Reaction Time: 2 seconds,
• Design Speed: 70km/hr to 90 km/hr depending on location,
• Longitudinal Grade: Varying depending on location.
Application of Safe Intersection Sight Distance (SISD) as per the Austroads Guide to Road Design
series is not considered necessary for the proposed development given the domestic nature of each
property, the existing horizontal and vertical road alignment of Black Mount Range Road, as well as
Black Mount Range Road being a low order road with fewer vehicle movements.
Lot 1 Access
The proposed Lot 1 access will be accommodated onto Black Mount Range Road along the western
site frontage, as illustrated in Table 2 below.
Table 2 Lot 1 Access Location
Plan Perspective Aerial Perspective
Traffic Engineering Letter
220 Black Mountain Range Road, Black Mountain - 4 -
Page 5
Modus has prepared Sight Distance Drawings, provided at Appendix B, indicating the minimum SSD
requirements as well as the sight distance extents needed to achieve the minimum SSD requirements.
The driver perspective at the minimum SSD requirements are illustrated in Table 3.
Table 3 Lot 1 Access Sight Distance Review
Approach From North-West Approach From South
(113.8m From Driveway) (82.7m From Driveway)
Therefore, the proposed Lot 1 access is able to accommodate the minimum SSD requirements within
the Austroads Guide to Road Design series as well as Australian Standards 2890.1, and hence is
considered acceptable.
Lot 2 Access
The proposed Lot 2 access will be accommodated onto Black Mount Range Road along the southern
site frontage, as illustrated in Table 4.
Table 4 Lot 2 Access Location
Plan Perspective Aerial Perspective
Traffic Engineering Letter
220 Black Mountain Range Road, Black Mountain - 5 -
Page 6
Modus has prepared Sight Distance Drawings, provided at Appendix B, indicating the minimum SSD
requirements as well as the sight distance extents needed to achieve the minimum SSD requirements.
For ease of reference, the driver perspective at the minimum SSD requirements are illustrated below
in Table 5.
Table 5 Lot 2 Access Sight Distance Review
Approach From West Approach From East
(80.0m From Driveway) (88.4m From Driveway)
Therefore, the existing horizontal and vertical road alignment of Black Mount Range Road allows
capability for the minimum SSD requirements within the Austroads Guide to Road Design series as
well as Australian Standards 2890.1 to be accommodated.
However, existing vegetation within the Black Mount Range Road verge impedes the available sight
distance.
On this basis, it is recommended that the existing vegetation within the Black Mount Range Road
verge be removed (as demonstrated at Appendix B) to accommodate acceptable sight distance
achievements for the Lot 2 access.
Traffic Engineering Letter
220 Black Mountain Range Road, Black Mountain - 6 -
Page 7
Lot 3 Access
The proposed Lot 3 access will be accommodated onto Black Mount Range Road along the southern
site frontage in line with the existing access location, as illustrated in Table 6.
Table 6 Lot 3 Access Location
Plan Perspective Aerial Perspective
Modus has prepared Sight Distance Drawings, provided at Appendix B, indicating the minimum SSD
requirements as well as the sight distance extents needed to achieve the minimum SSD requirements.
For ease of reference, the driver perspective at the minimum SSD requirements are illustrated below
in Table 7.
Table 7 Lot 3 Access Sight Distance Review
Approach From West Approach From East
(71.5m From Driveway) (124.2m From Driveway)
Traffic Engineering Letter
220 Black Mountain Range Road, Black Mountain - 7 -
Page 8
Therefore, the existing horizontal and vertical road alignment of Black Mount Range Road allows
capability for the minimum SSD requirements within the Austroads Guide to Road Design series as
well as Australian Standards 2890.1 to be accommodated.
However, existing vegetation within the Black Mount Range Road verge impedes the available sight
distance.
On this basis, it is recommended that the existing vegetation within the Black Mount Range Road
verge be removed (as demonstrated at Appendix B) to accommodate acceptable sight distance
achievements for the Lot 3 access.
Lot 4/5 Access
The proposed Lot 4/5 access will be accommodated onto Black Mount Range Road along the
southern site frontage, as illustrated in Table 8.
Table 8 Lot 4/5 Access Location
Plan Perspective Aerial Perspective
Modus has prepared Sight Distance Drawings, provided at Appendix B, indicating the minimum SSD
requirements as well as the sight distance extents needed to achieve the minimum SSD requirements.
For ease of reference, the driver perspective at the minimum SSD requirements are illustrated below
in Table 9.
Traffic Engineering Letter
220 Black Mountain Range Road, Black Mountain - 8 -
Page 9
Table 9 Lot 4/5 Access Sight Distance Review
Approach From West Approach From East
(85.9m From Driveway) (88.4m From Driveway)
Therefore, the existing horizontal and vertical road alignment of Black Mount Range Road allows
capability for the minimum SSD requirements within the Austroads Guide to Road Design series as
well as Australian Standards 2890.1 to be accommodated.
However, existing vegetation within the Black Mount Range Road verge impedes the available sight
distance.
On this basis, it is recommended that the existing vegetation within the Black Mount Range Road
verge be removed (as demonstrated at Appendix B) to accommodate acceptable sight distance
achievements for the Lot 4/5 access.
Traffic Engineering Letter
220 Black Mountain Range Road, Black Mountain - 9 -
Page 10
Summary
Modus has been commissioned by Threedom Nominees Pty Ltd to provide traffic and transport
advice in relation to the proposed Subdivision development located at 220 Black Mountain Range
Road, Black Mountain.
From the assessment undertaken, Modus has determined the findings below:
N The proposed Lot 1 access is able to accommodate sufficient sight distance,
N The proposed Lot 2 access has the capability to accommodate sufficient sight distance subject to
vegetation clearing within the Black Mountain Range Road verges,
N The proposed Lot 3 access has the capability to accommodate sufficient sight distance subject to
vegetation clearing within the Black Mountain Range Road verges,
N The proposed Lot 4/5 access has the capability to accommodate sufficient sight distance subject
to vegetation clearing within the Black Mountain Range Road verges,
Should there be any issue with the above, please contact the undersigned.
Yours sincerely,
MODUS TRANSPORT AND TRAFFIC ENGINEERING
Harj Singh
Executive Director (RPEQ 22364)
Traffic Engineering Letter
220 Black Mountain Range Road, Black Mountain - 10 -
Page 11
APPENDIX A Development Plans Traffic Engineering Letter 220 Black Mountain Range Road, Black Mountain - 11 -
Page 12
LINETYPE LEGEND
BANK BOTTOM
Scale 1:3000 - Lengths are in Metres BANK TOP
BATTER
CROWN
30 0 30 60 90 120 150 180 210 240 270 300 330 GUTTER
MAX WATTERSON
GRAVEL
BITUMEN
KERB
E
CONCRETE
ELECTRICAL
+ASSOCIATES
WATER
DAM/POOL
CONSULTING SURVEYORS
SEWER & PLANNERS
DRAINAGE
BRUCE TREELINE
GARDEN
TELSTRA
BUILDING
1/11 Garnet Street
PO Box 639
Cooroy Qld 4563
PAVING
HIGHWAY RETAINING WALL
WALL
Ph. (07) 54426121
Email. [email protected]
160
GUARDRAIL
0
15
FENCE
0
BDY
14
14
0
MAJOR CONTOUR
Client:
140
130
0 220.91
0
17 MINOR CONTOUR
4
13
THREEDOM
.7
140
33
E
53.73
140
130
103.82 30.0
190.3 NOMINEES PTY LTD
1
130
71.89
BLAC
99.92
.16
2
13
93.4
Project:
.83
Dam
0
4.284ha 79
PLAN OF PROPOSED
45
6
13
Dam 0
House Site
Area 2.931ha RECONFIGURATION
E
14
Access 3 Dam
81.7
0
19 OF LOT 3 ON
K
4
9.7
2.
1
66.9 8
10
43.1
1 SP258891.
150
E
5
5
48.9 6 SP258992
9.1
41.98
3
6
Dam
5
11.
E
House
7.699ha
8
70.67
8
House Site
9.4
71.6
Site Area
2
Area
3.984ha
17
69
.21
4
8.2
76.76
Access
150
28.23
41
LOCAL GOVT: NOOSA SHIRE COUNCIL
58
E Shed
.5
0
Single Storey LOCALITY: BLACK MOUNTAIN
MOUNTAIN
Brick House
3
150
3 Plan 1 of 1
.9
4
18
1
s 5 Scale: 1:3000
2.4
es RP193769
12
0
cc
82
A Date: 20-04-26
37
Datum: AHD
.9
7
3.954ha
R Origin: NSC Mapping
Ref:
A Ho
us
Cont.Int: 2.0m
N Ar e S
160
ea ite 25-6775AG
G House Site
2
12
Area
E
3.
RP179367 NOTE:
54
STORMWATER GRATE .77 160 This plan has been prepared for application
3 160
54 purposes only and may be subject to change.
29.5
SW STORMWATER MANHOLE
0
43. Dimensions and areas shown hereon are
10.
S
5
SEWER MANHOLE
37 DENOTES RIPARIAN
BUFFER AREA approximate only and subject to final survey.
EJ ELECTRICITY JUNCTION BOX 10. 1
RO 0
ss
Ac al
170
ce
TELSTRA PIT
Du
RP168296
WM
H
WATER METER
HYDRANT
AD 180
STOP VALVE
POWER POLE
LIGHT POLE
BENCH MARK QUAIL L ANE
R 93955
P1
Emt C
Page 13
APPENDIX B Sight Distance Review Traffic Engineering Letter 220 Black Mountain Range Road, Black Mountain - 12 -
Page 14
9.3
14.3
NORTH APPROACH: SOUTH APPROACH:
MINIMUM SSD OF ~114m CAN BE ACHIEVED. DRIVER 14.8
PERSPECTIVE AT MINIMUM SSD REQUIREMENT
RT: 2 seconds RT: 2 seconds
SHOWN BELOW: V: 90 km/hr V: 70 km/hr
d: 0.46 d: 0.46
a: +4% a: -2%
17.0
SSD: 113.8m SSD: 82.73m
14.7
LOT 1 DRIVEWAY LOCATION
43.7
PROJECT
220 BLACK MOUNTAIN RANGE ROAD
5.0
CLIENT
THREEDOM NOMINEES PTY LTD
DRAWING TITLE
59.1
LOT 1 ACCESS REVIEW
MINIMUM SSD OF ~82.7m CAN BE ACHIEVED. DRIVER
PERSPECTIVE AT MINIMUM SSD REQUIREMENT DRAWING NUMBER
SHOWN BELOW:
MOD25525QLD - SK05
8.2
DATE REVISION
01 06 2026 A
16.1
REV DATE DESIGNER APPROVED BY
- - - -
- - - -
- - - -
- - - -
- - - -
PRELIMINARY ADVICE ONLY MODUS ENGINEERING ALL RIGHTS RESERVED. THIS DOCUMENT IS PRODUCED BY MODUS ENGINEERING SOLELY
FOR THE BENEFIT OF AND USE BY THE CLIENT IN ACCORDANCE WITH THE TERMS OF THE RETAINER. MODUS
RPEQ CERTIFICATION ABN 49 668 863 269
ENGINEERING DOES NOT AND SHALL NOT ASSUME ANY RESPONSIBILITY OR LIABILITY WHATSOEVER TO ANY 310 Edward Street, BRISBANE CITY QLD 4000
NOT TO BE USED FOR CONSTRUCTION THIRD PARTY ARISING OUT OF ANY USE OR RELIANCE BY THIRD PARTY ON THE CONTENT OF THIS DOCUMENT.
Page 15
MINIMUM SSD OF ~79.9m CAN BE ACHIEVED SUBJECT
TO MINOR VEGETATION TRIMMING WITHIN THE BLUE WEST APPROACH: EAST APPROACH:
EXTENT. DRIVER PERSPECTIVE AT MINIMUM SSD
REQUIREMENT SHOWN BELOW:
RT: 2 seconds RT: 2 seconds
V: 70 km/hr V: 70 km/hr
d: 0.46 d: 0.46
a: +1% a: -7%
SSD: 79.95m SSD: 88.35m
LOT 2 DRIVEWAY LOCATION
5.0
16.4
PROJECT
24.5
80.3
220 BLACK MOUNTAIN RANGE ROAD
CLIENT
47.6 THREEDOM NOMINEES PTY LTD
DRAWING TITLE
LOT 2 ACCESS REVIEW
MINIMUM SSD OF ~88.4m CAN BE ACHIEVED SUBJECT TO DRAWING NUMBER
MINOR VEGETATION TRIMMING WITHIN THE BLUE EXTENT.
DRIVER PERSPECTIVE AT MINIMUM SSD REQUIREMENT MOD25525QLD - SK06
SHOWN BELOW:
DATE REVISION
01 06 2026 B
REV DATE DESIGNER APPROVED BY
- - - -
- - - -
- - - -
- - - -
- - - -
PRELIMINARY ADVICE ONLY MODUS ENGINEERING ALL RIGHTS RESERVED. THIS DOCUMENT IS PRODUCED BY MODUS ENGINEERING SOLELY
FOR THE BENEFIT OF AND USE BY THE CLIENT IN ACCORDANCE WITH THE TERMS OF THE RETAINER. MODUS
RPEQ CERTIFICATION ABN 49 668 863 269
ENGINEERING DOES NOT AND SHALL NOT ASSUME ANY RESPONSIBILITY OR LIABILITY WHATSOEVER TO ANY 310 Edward Street, BRISBANE CITY QLD 4000
NOT TO BE USED FOR CONSTRUCTION THIRD PARTY ARISING OUT OF ANY USE OR RELIANCE BY THIRD PARTY ON THE CONTENT OF THIS DOCUMENT.
Page 16
WEST APPROACH: EAST APPROACH:
MINIMUM SSD OF ~71.5m CAN BE ACHIEVED. DRIVER
PERSPECTIVE AT MINIMUM SSD REQUIREMENT SHOWN
BELOW: RT: 2 seconds RT: 2 seconds
V: 70 km/hr V: 90 km/hr
d: 0.46 d: 0.46
a: +13% a: -3%
SSD: 71.59m SSD: 124.16m
LOT 3 DRIVEWAY LOCATION AT EXISTING
DRIVEWAY
71.8
5.0
PROJECT
220 BLACK MOUNTAIN RANGE ROAD
CLIENT
THREEDOM NOMINEES PTY LTD
DRAWING TITLE
LOT 3 ACCESS REVIEW (EXISTING
MINIMUM SSD OF ~124.2m CAN BE ACHIEVED SUBJECT TO 124.8 DRIVEWAY LOCATION)
MINOR VEGETATION TRIMMING WITHIN THE BLUE EXTENT.
DRIVER PERSPECTIVE AT MINIMUM SSD REQUIREMENT
SHOWN BELOW: DRAWING NUMBER
MOD25525QLD - SK07
DATE REVISION
01 06 2026 A
REV DATE DESIGNER APPROVED BY
- - - -
- - - -
- - - -
- - - -
- - - -
PRELIMINARY ADVICE ONLY MODUS ENGINEERING ALL RIGHTS RESERVED. THIS DOCUMENT IS PRODUCED BY MODUS ENGINEERING SOLELY
FOR THE BENEFIT OF AND USE BY THE CLIENT IN ACCORDANCE WITH THE TERMS OF THE RETAINER. MODUS
RPEQ CERTIFICATION ABN 49 668 863 269
ENGINEERING DOES NOT AND SHALL NOT ASSUME ANY RESPONSIBILITY OR LIABILITY WHATSOEVER TO ANY 310 Edward Street, BRISBANE CITY QLD 4000
NOT TO BE USED FOR CONSTRUCTION THIRD PARTY ARISING OUT OF ANY USE OR RELIANCE BY THIRD PARTY ON THE CONTENT OF THIS DOCUMENT.
Page 17
MINIMUM SSD OF ~85.94m CAN BE ACHIEVED SUBJECT TO
MINOR VEGETATION TRIMMING WITHIN THE BLUE EXTENT.
DRIVER PERSPECTIVE AT MINIMUM SSD REQUIREMENT
SHOWN BELOW:
WEST APPROACH: EAST APPROACH:
RT: 2 seconds RT: 2 seconds
V: 70 km/hr V: 70 km/hr
d: 0.46 d: 0.46
a: -5% a: -7%
SSD: 85.94m SSD: 88.35m
LOT 4/5 DRIVEWAY LOCATION
PROJECT
85.9
220 BLACK MOUNTAIN RANGE ROAD
5.0
CLIENT
THREEDOM NOMINEES PTY LTD
19.0
22.5
DRAWING TITLE
MINIMUM SSD OF ~88.35m CAN BE ACHIEVED SUBJECT TO
MINOR VEGETATION TRIMMING WITHIN THE BLUE EXTENT. LOT 4/5 ACCESS REVIEW
DRIVER PERSPECTIVE AT MINIMUM SSD REQUIREMENT
SHOWN BELOW: 19.4
DRAWING NUMBER
MOD25525QLD - SK08
8.3
7.0
DATE REVISION
12.5 01 06 2026 A
REV DATE DESIGNER APPROVED BY
- - - -
- - - -
- - - -
- - - -
- - - -
PRELIMINARY ADVICE ONLY MODUS ENGINEERING ALL RIGHTS RESERVED. THIS DOCUMENT IS PRODUCED BY MODUS ENGINEERING SOLELY
FOR THE BENEFIT OF AND USE BY THE CLIENT IN ACCORDANCE WITH THE TERMS OF THE RETAINER. MODUS
RPEQ CERTIFICATION ABN 49 668 863 269
ENGINEERING DOES NOT AND SHALL NOT ASSUME ANY RESPONSIBILITY OR LIABILITY WHATSOEVER TO ANY 310 Edward Street, BRISBANE CITY QLD 4000
NOT TO BE USED FOR CONSTRUCTION THIRD PARTY ARISING OUT OF ANY USE OR RELIANCE BY THIRD PARTY ON THE CONTENT OF THIS DOCUMENT.