Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix E - Traffic Engineering Assessment Report

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (14.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Lot 3 Access
The proposed Lot 3 access will be accommodated onto Black Mount Range Road along the southern
site frontage in line with the existing access location, as illustrated in Table 6.

Table 6   Lot 3 Access Location


                  Plan Perspective                                Aerial Perspective




Modus has prepared Sight Distance Drawings, provided at Appendix B, indicating the minimum SSD
requirements as well as the sight distance extents needed to achieve the minimum SSD requirements.

For ease of reference, the driver perspective at the minimum SSD requirements are illustrated below
in Table 7.

Table 7   Lot 3 Access Sight Distance Review

                Approach From West                               Approach From East
               (71.5m From Driveway)                           (124.2m From Driveway)




Traffic Engineering Letter
220 Black Mountain Range Road, Black Mountain - 7 -
Log in to download the original file

Appendix E - Traffic Engineering Assessment Report.pdf · 14.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.