Original source · versioned page text
4325IR Response
Attached to the e-mail Response to the Information Request - MCU17/0028 REC17/0012 & OPW17/0120.
Callaghan & Toth Consulting Engineers Pty Ltd ABN No. 45140292324 8/41 Sunshine Beach Road Noosa Junction P.O Box 2305 Noosa Heads 4567 Callaghan & Toth www.callaghanandtoth.com.au Ph: 07 5474 9081 Fax: 07 54749041 4st June 2017 Civil, Environmental & Hydraulic Engineers = File No. 1622 Development Planning Officer Noosa Council Via Email: [email protected] Attention: Patrick Murphy RE: REPONSE TO INFORMATION REQUEST MCU17/0028 OPW17/0120 REC17/0012 AT 23 TEWANTIN ROAD, COOROY In reply to Noosa Council Information Request dated 9" May 2017 we enclose our response to items as follows: Issue 1: The proposed access driveway to Tewantin Road is a significant structure in a Main Roads controlled road. The structure has the potential to create adverse impacts on the existing services, vegetation and drainage patterns. Information Required: Response 1: Response 2: Response 3: 1. Provide written approval from the Department of Transport and Main Roads for the proposed access driveway works and associated retaining structures. 2. Provide comment from the design engineer that addresses the potential impacts on the adjoining property due to the changes in overland flows created by the proposed access driveway. 3. Provide RPEQ certification that states that: a. the designed structure will provider suitable sight lines to pedestrians on the footpath in Tewantin Road. b. the proposed retaining structures do not create an unacceptable fall risk in the road reserve or within the property. 4. Provide written approval from any third party service provider (Telstra, Unitywater etc.) whose assets (both above and below ground) may be affected by the works. Refer to separate written approval from the department of Transport and Main Roads for the proposed driveway works. Our driveway location ensures that there is no impacts on the adjacent property due to changes in overland flow paths. The survey contours show that the verge runoff flows is at 90° approximately to the road and so our driveway design will not divert these flows. The small retaining wall is set 300mm inside the client's boundary to drain any local depressions. a) | certify that we have checked the sight lines to pedestrians on the footpath and that they exceed the requirements in F1G 3.2 of AS 2890.1 b) | certify that retaining walls are more than 500mm away from the edge of the pathway and are only a max of 0.75m high which is less than the minimum 1m high wall requiring a barrier. The edge is also raised to define the change of grade. The design ensures that the public will not use the driveway. Therefore | certify that the structure does not create an unacceptable fall risk in the road reserve or within the property. X:JOBSICT Projects in progress\1622 23 tewantin rd\Correspondence\Response to Noosa Council Info Request.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.