Development Application Part 1 of 2 IDAS Forms 1and checklist 33 Seamount Qy Noosaville · OPW10/2196

of 15

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                          SCRC CORRESPONDENCE



                                                                  Place Barcode here                       l ^ l l 'I I I IIlllliiii ^ll^lll lli ill
                                                                                                                    S0023436


                                 THIS IS THE NEXT PART OF A
                           MULTIPLE PART RECORD
                                                      Part _ Of

                     Application number:
           T   I&AM\BCS IAM\INFORMATION M ANAGEMENTRECORDS MAN AGE MENTControl of Records\EDRMS\.Multt Part Record Cover Sheet FIRST PART do#




    .mot


    A
                                                  REC` - '


                                        F1            SC FC
                                                     Harr,b our

8
Full text of the other 14 pages

Page 2

Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:

•      complete this form (Application details - IDAS form 1)

•      complete any other forms relevant to your application

•      provide any mandatory supporting information identified on the forms as being required to accompany your
       application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.


Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)


Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.


Name/s (individual or company name in full)                   PILE-IT PTY LTD T/A NOOSA JETTY BUILDERS


For companies, contact name                                   DANNY REED

Postal address                                               PO BOX 299 NOOSAVILLE QLD 4566                       10
Contact phone number

Mobile number (non-mandatory)


Fax number (non-mandatory)                                   07 5474 3480                                    rt


e-mail address (non-mandatory)                               [email protected]




1. What is the nature of development proposed? (tick all applicable boxes)


q     material change of use of premises

q     building work

® operational work                                                                  Development Counter
q     reconfiguring a lot
                                                                                          Z 6 NOV 2010
                                                                                         Tewantin

    Department of Infrastructure and Planning                            C^T;TF21                        Queensland
                                                                                                         Government

Page 3

2. What type of approval is being sought?


® development permit

q    preliminary approval

q both - provide details below


3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?


® No

q    Yes - complete table A and then go to question 5




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises


                                                                                   Lot on plan
                Street Address
                                                                                   description
                                                                                                      Local government area
                Unit Street        Street name and official         Post                Plan type       (e.g. Logan,Cairns)
                                                                            Lot No
                                                                                No.
                 No.     No.        suburb/locality name           code               and plan no.

                                                                                                     sunshine coast regional
            1           33     Seamount Quay, Noosaville           4566      104      RP839226
                                                                                                     council

q Street address / lot on plan
  Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
® water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

                Coordinates (note: place each set of
                coordinates in a separate row)                             Zone                            Local government
                                                                                           Datum
                                                                      reference                           area (If applicable)
                  Fasting      Northing    Latitude    Longitude

                                                                                      q GDA94
                                                                                      q WGS84
            1
                                                                                      q other




5. Total area of the premises on which the development is proposed (indicate hectares or m2)

975m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)


        1       house


7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)


timber jetty




                                                                                                                De`.     IDAS form 1
                                                                                                               1.0 18 December 2009

Page 4

8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)


q No
® Yes - complete either table D, table E or table F as applicable



Table D (note: do not complete this table if lodging the application on-line using Smart eDA)



Name of owner/s of the land        Tony & Di Nicol            131 N wl s %i S /_ 2,        Pu       ^^ .


I/We, the above-mentioned owner/s of the land, consent to the making of this application.


Signature of owner/s of the land


DateO                              •     /        i   /0

Table E


Name of owner/s of the land

q The owner's written consent is attached or will be provided separately to the assessment manager


Table F


Name of owner/s of the land

   By making this application, I, the applicant, declare that the owner has given written consent to the making of
 q the application.


9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)


® No                            q Yes - complete table G



10. Identify if any of the following apply to the premises (tick applicable boxes)

       adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H

       on strategic port land under the Transport Infrastructure Act 1994 - complete table I

       in a tidal water area - complete table J


Table H       Name of water body, watercourse or aquifer

          1   Noosa Waters Canal


11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
    water, etc.)

® No      q Yes - ensure the type, location and dimension of each easement is included in the plans submitted




                                                                                               pl,cation Details- IDAS form 1
                                                                                               Version 1.0 18 December 2009

Page 5

12. Does the proposal include new building work or operational work on the premises? (including any
    services)


q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
    end of this form for more information)


® No - Go to question 15                  q Yes


15. Has the local government agreed to apply a superseded planning scheme to this application under
   section 96 of the Sustainable Planning Act 2009?



® No

q    Yes - provide details below



16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

                                                                                                Method of lodgement to
                             Description of attachment or title of attachment
                                                                                                 assessment manager

            1    Form 6                                                                         over the counter



            2    Checklist                                                                      over the counter



            3    John Norden Plans                                                              over the counter



17. Applicant's declaration


® By making this application, I declare that all information in this application is true and correct (note: it is
    unlawful to provide false or misleading information).




                                                                                                               IDAS form 1
                                                                                             Version 1.0 18 December 2009

Page 6

Notes for completing this form

Question 8:
•  Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
   for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
   required under section 263, then an application must contain, or be accompanied by, the written consent of the
   owner, or include a declaration by the applicant that the owner has given written consent to the making of the
   application.
•  Owner's consent is not required for a mobile and temporary ERA.

Question 9:
•     Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
      regulation may require the application to be supported by certain evidence prescribed under the regulation.
      Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
      required to be given, and the evidence required, to support the application.

Question 13:
•  The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
   long service leave levy is payable.
•  The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
   are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
•  The portable long service leave levy need not be paid when the application is made, but the Building and
   Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
   permit is issued.
•     Building and Construction Industry Notification and Payment Forms are available from any Queensland post
      office or agency, on request from QLeave, or can be completed on the QLeave website at
      www.gleave.gld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.


OFFICE USE ONLY


Date received                                 Reference numbers


NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER


                                                      Council. I have been engaged as the private certifier for the
To:
                                                      building work referred to in this application.


Date of                                                                   BSA Certification      Building
                      Name
engagement                                                                license number         classification/s




                                                                                              ,, ,        - IDAS form 1
                                                                                          Version 1.0 18 December 2009

Page 7

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)


                                                                                Date receipted
                                        QLeave Project   Amount                 form sighted by Name of officer who
              Description of the work                               Date paid
                                        Number           paid ($)               assessment       sighted the form
                                                                                manager


        1


The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.




                                                                                                     t !ails IDAS form 1
                                                                                          Version 1 0 18 December 2009

Page 8

Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
•     complete Applicant details - IDAS form I

•     complete any other forms relevant to your application
•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.


All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.


1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

    building work - complete table A                 ® operational work - complete table B



Table B


          What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)



          q road works                   [] stormwater                   ® water infrastructure

              drainage Works             LI earthworks                      sewerage infrastructure

              landscaping                    signage                     f clearing vegetation under the planning scheme

              other - please specify below


         What type of approval is being sought? (if you have indicated multiple works in the above question, please
         use an attachment to this form to detail each approval request)


          ® development permit                El preliminary approval                  b   e_y ^>r,f ,e1j5^ nt C o ur 'ter
         Is the operational work necessary to facilitate the creation of new lots? (e.g. subs v&i#lQV        2010
         ® No          [] Yes - specify the number of lots being created
                                                                                                      Tewantin
         Are there any current approvals associated with this application? (e.g. material change of use


         ® No          LI Yes - provide details below




Department 101 1",                     and Planning'

Page 9

uI

2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ 25,000

Page 10

3. Confirm the following mandatory supporting information accompanies this application
                                                                                 Confirmation
                                                                                                  Method of lodgement
                                                                                 of lodgement
All applications for operational works

site plans drawn to scale which show the following:
•   the location and site area of the land to which the application relates
    (relevant land)
•   the north point
•   the boundaries of the relevant land
•   the allotment layout showing existing lots, any proposed lots (including
    the dimensions of those lots), existing or proposed road reserves,           Z confirmed      over the counter
    building envelopes and existing or proposed open space (note:
    numbering is required for all lots)
•   any existing or proposed easements on the relevant land and their
    function
•   any access limitation strips
•   all existing and proposed roads and access points on the relevant land

a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents                   q confirmed
relevant to the application

Applications for operational works involving earthworks (filling and excavating)


drawings showing:
•   existing and proposed contours
•   areas to be cut and filled
•   the location and level of any permanent survey marks or reference
    stations used as datum for the works                                         q confirmed
•   the location of any proposed retaining walls on the relevant land and
    their height
•   the defined flood level (if applicable)
•   the defined fill level (if applicable)
Applications for operational works involving roadworks

drawings showing:
•   existing and proposed contours
•   the centreline or construction line showing chainages, bearings, offsets
    if the construction line is not the centreline of the road and all
    intersection points
•   information for each curve including tangent point chainages and
    offsets, curve radii, arc length, tangent length, superelevation (if
    applicable) and curve widening (if applicable)
•   kerb lines including kerb radii (where not parallel to centreline) and
    tangent point changes (where not parallel to centreline)
•   edge of pavement where kerb is not constructed                               q confirmed
•   position and extent of channelisation
•   location and details of all traffic signs, guideposts, guardrail and other
    street furniture
•   pavement markings including details on raised pavement markers
•   catchpit, manhole and pipeline locations
•   drainage details (if applicable)
•   cross road drainage culverts (if applicable)
•   concrete footpaths and cycle paths
•   location and details for access points, ramps and invert crossings
•   changes in surfacing material

                                                            )perational work assessable against a purr r; c    _ IDRS form 6
                                                                                                Version 1.0 18 December 2009

Page 11

                                                                              Confirmation
                                                                                                Method of lodgement
                                                                              of lodgement
Applications for operational works involving stormwater drainage

drawings showing:
•   existing and proposed contours
•   drainage locations, diameters and class of pipe, open drains and
    easements                                                                 fl confirmed
•   manhole location. chainage and offset or co-ordinates and inlet and
    outlet invert levels
•   inlet pit locations, chainage and offset or co-ordinates and invert and
    kerb levels
Applications for operational works involving water reticulation


drawings showing:
•   kerb lines or edge of pavement where kerb is not constructed
•   location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments                                                        confirmed
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
•   location of valves and fire hydrants
•   location of house connections (if applicable)
•   location of bench marks and reference pegs

Applications for operational works involving sewerage reticulation


drawings showing:
•   location of all existing and proposed services
•   location of all existing and proposed sewer lines and manhole locations
•   location of all house connection branches
•   kerb lines or edge of pavement where kerb is not constructed
•   chainages
                                                                                confirmed
•   design sewer invert levels
•   design top of manhole levels
•   type of manhole and manhole cover
•   pipe diameter, type of pipe and pipe alignment
•   location of house connections (if applicable)
•   sewer pump station details (if applicable)

Applications for operational works involving street lighting

drawings showing.
• location of all light poles and service conduits
• location of all other cross road conduits
•   type of wattage and lighting
•   any traffic calming devices                                               q confirmed

•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels




                                                                                             planning scheme - IDAS form 6
                                                                                             Version 1.0 18 December 2009

Page 12

qOf
                                                                                  Confirmation
                                                                                                     Method of lodgement
                                                                                  of lodgement
Applications for operational works involving public utility services

drawings showing:
• any existing light poles and power poles
•   any existing underground services                                                confirmed
•   details of proposed services
•   alternation to existing services

Applications for operational works involving landscaping works

drawings showing:
•   the location of proposed plant species
•   a plant schedule indicating common and botanical names, pot sizes
    and numbers of plants
•   planting bed preparation details including topsoil depth, subgrade
    preparation, mulch type and depth, type of turf, pebble, paving and              confirmed
    garden edge
•   the location and type of any existing trees to be retained
•   construction details of planter boxes, retaining walls and fences
•   the proposed maintenance period
• irrigation system details


Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable
    against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
    mentioned, take it to mean the land use plan for the airport land.



Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.



OFFICE USE ONLY


Date Receivc-A                           Reference Numbers


The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.




                                             &iifcinc z>,nd rner ^!^onaI ^;. r'^ ass^ssabie a a.r,sr ;.:. „ . _        IDAS form 6
                                                                                                     Version 1.0 18 December 2009

Page 13

Development assessment checklist - IDAS
checklist 1
(Sustainable Planning Act 2009, version 1.0 18 December 2009)


This checklist applies to the carrying out of development generally.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

•    whether you need to make a development application for the proposed development

•    if a development application is required, the relevant IDAS forms you need to complete as part of your application

•    whether you need to give a copy of your application to any referral agencies.

If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4, as applicable
I f you are unsure how to answer any questions on this checklist, phone or v it your Iota         r^cu    or   o to the
Department of Infrastructure and Planning's website at www.dip.ald. ov.         D    evelop, re ^ r.. }}




                                                                                                                              i
All terms used in this checklist have the meaning given in the Sustainable planning Act 2049 or ^e Sus it          r i ter
Planning Regulation 2009.

                                                                                              2 6 NOV 201f
Part I - General questions

1.1 Have you received a referral agency response in relation to this prop
an application?

    No
            •        To assist you in preparing your application, completing Referral agency responses - IDAS checklist
D Yes
                     6 is recommended

1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?

® No

                     You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
F-1 Yes              form 2 and give this notice to the relevant local government. If the local government agrees to
                     your request, details must be provided in Application details - IDAS form 1



1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?

    No
    Yes              It is recommended that you complete part 2 of this checklist


1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensland Heritage Act 1992?


® No

J Yes                It is recommended that you complete part 3 of this checklist
                                                                                                                          I




    Department of Infrastructure and Planning                   QPlan

Page 14

1.5 Does the proposal involve development on a local heritage place?


® No

    Yes            It is recommended that you complete part 4 of this checklist



1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?

    No

   Yes             It is recommended that you complete part 5 of this checklist


1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)


   No

q Yes              It is recommended that you complete part 6 of this checklist


1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?


Z No

[] Yes             It is recommended that you complete part 7 of this checklist


1.9 Is any part of the premises designated for community infrastructure?

® No

   Yes             It is recommended that you complete part 8 of this checklist


1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?


   No

q Yes              It is recommended that you complete part 9 of this checklist


1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?


   No

q Yes              It is recommended that you complete part 10 of this checklist


Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disclaimer:
   While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
   checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
   not rely on the information without first making your own enquiries regarding the interpretation and application of
   the applicable legislation to your circumstances.

   To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
   negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
   other consequence which may arise from your reliance on this process and the information contained on this
   checklist.




                                                                  elopment application assessr,• ,      i,!rst - IDAS checklist 1
                                                                                                Version 1.0 18 December 2009

Page 15

   LJL

OFFICE USE ONLY


Date received                           Reference numbers


The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.




                                                                                              1.0 18 December 2009

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 1 of 2 IDAS Forms 1and checklist 33 Seamount Qy Noosaville.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.