SUPERSEDED Minor Change Existing Approval - 51983.3225.23 (As Published)
Additional Conditions specific for Lot 3 GTP 1154 – 16 November 2023
Performance Bond - Planning
45. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, specifically
for Lot 3, prior to the issue of a Development Permit for Building Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval less
any costs incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Landscaping
46. The development site must be landscaped generally in accordance with the approved plans
of 16 November prepared by Earth Creation Landscapes and Planning Scheme Policy PSP2
– Landscaping.
47. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
48. All planting areas on the rooftop must be planted and maintained at all times, with
replacement planting undertaken promptly where plants fail or do not have a healthy and
vigorous growth.
49. Any vegetation to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape;
b. installing protective fencing around the drip line of the vegetation;
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared; and
d. using low impact construction techniques around vegetation.
Nature of Approved Use
50. The building must be used as one dwelling only, with Levels not permitted to be occupied/let
separately. The door between the stairwell and family room is not permitted to be installed
with the entry/exit area to the stairwell to remain open at all times.
51. The rooftop arbour frame shown on the plans of development is not approved and must not
be constructed.
Additional Conditions specific for Lot 2 GTP 1154 – 27 November 2023
Performance Bond - Planning
52. Deleted.
Landscaping
53. The development site must be landscaped generally in accordance with the approved plans
approved under OPW22/0022 – Development Permit for Operational Works – Landscaping,
issued on 25 May 2022.
54. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
55. Any planting areas above ground level must be planted and maintained at all times, with
replacement planting undertaken promptly where plants fail or do not have a healthy and
vigorous growth.
Page 16 of 23
Document Set ID: 24114935
Version: 6, Version Date: 19/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Minor Change Existing Approval - 51983.3225.23 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 220 KB (small file)
- File type
No other editions are linked here.