Attachment A - Approved Decision Notice MCU210027

of 19

Page text shows just the words. Original shows the document exactly as it was published.

               9.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
               10.    A minimum maintenance period of 12 months will apply to all municipal works and thereafter
                      until such time as the works are performing in accordance with the approved design unless
                      noted otherwise
                      Environmental Advisory Notes
               11.    The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               12.    Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control
               13.    Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               14.    As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the time of the On-Maintenance inspection:
                      a.      Methods of stabilisation are:
                                      appropriate for slopes and slope lengths; and
                                      are consistent with best practice environmental management practices such as
                                       in the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
                              If at the time of request for the On-Maintenance inspection, the method of short-term
                              stabilisation has not achieved a level of stability that Council's Officers believe will have
                              a high probability of achieving long term stability (i.e. until house construction has
                              occurred on all lots), Council Officers may take the following matters into consideration
                              in determining whether the site is capable of achieving medium to long-term stability:
                                      evidence that the site has been effectively stabilised in the short term;
                                      evidence that soil has been adequately ameliorated;
                                      evidence that seed of annual and perennial grass species has been applied at
                                       an adequate rate; and
                                      that grass seed has germinated at a density that is likely to achieve an effective
                                       grass cover.
                      ENVIRONMENTAL HEALTH
                      Building Works
               15.    Noise from residential building works shall comply with the following:
                      a.      Limited to between 6:30am to 6:30pm Monday to Saturday.
                      b.      All reasonable measures are taken to minimise noise emissions
                      c.      Not permitted on Sunday or public holidays.
                      Measurement of Noise
               16.    Measurement of sound pressure levels (adjusted for tonality and impulse) must be in
                      accordance with either:

                                                                                                           Page 16 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021
Log in to download the original file

Attachment A - Approved Decision Notice MCU210027.pdf · 245 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.