Attachment A - Approved Decision Notice MCU210027
a. the works shown on the Approved Plans;
Services
27. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
28. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
29. A 4 metre wide easement for Stormwater purposes must be registered against the title of the
property in favour of Noosa Council over the proposed easement identified on the Approved
Plans.
30. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
31. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
32. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
33. All fill and associated batters must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
Earthworks for Commercial and Residential Developments and the conditions of this
Decision Notice.
34. Where the development involves excavation or filling over, or adjacent to, drainage, water
supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
provide a freeboard of 100mm above the finished ground surface level.
35. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
ENVIRONMENTAL HEALTH
Waste Storage
36. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy PSP - 9 Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties.
37. A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer,
via a bucket trap. The drain outlet is to be designed to prevent storm water entry to the
sewerage system which can be achieved by a bunded area, with a nib wall height of 100mm
maximum, enclosing a wash area of 700mm x 700mm minimum (max 0.7m²). Alternatively,
the waste area can be roofed, or any other appropriate design approved by Council.
Noise
38. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following:
a. Air-conditioning and Refrigeration
Page 5 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021