REPORT


MIXED USE DEVELOPMENT, COOROY – ACOUSTIC ASSESSMENT




JOB NO.: 0009



DATE: 10/06/2014




CLIENT: Verve Building Design and Concepts




                                        Prepared by:
                                    MRG Environmental
                                      P: 07 3841 0815
                                      F: 07 3841 0817
                    Ground Level 88 Brandl St, Eight Mile Plains QLD 4113
                         PO Box 6794 Upper Mt Gravatt QLD 4122
                               www.mrgenvironmental.com
Log in to download the original file

MCU14_0056 - Attachment F - Acoustic Assessment.pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 26 pages

Page 2

DOCUMENT TYPE:                              Report
DOCUMENT REFERENCE:                         0009-R1-01
PROJECT:                                    MIXED USE DEVELOPMENT, COOROY – ACOUSTIC ASSESSMENT


CLIENT:                                     Verve Building Design and Concepts


PROJECT MANAGER:                            Matthew Goodfellow




DOCUMENT CONTROL

Documents Reference               Description             Date                    Author
R1-01                             Report                  10/06/2014              Matthew Goodfellow




© 2014 MRG Environmental Pty Ltd trading as MRG Environmental All Rights Reserved.
Copyright of this document belongs to MRG Environmental Pty Ltd trading as MRG Environmental and may not
be used, sold, reproduced, stored, or distributed/transmitted in any form or by any means, electronic,
photocopying, recording or otherwise without the prior written consent of MRG Environmental Pty Ltd trading
as MRG Environmental.




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                     i
Report
Verve Building Design and Concepts | 0009

Page 3

Contents
1     Introduction .................................................................................................................................. 1
    1.1      Project Description ................................................................................................................ 1
2     Noise Criteria ................................................................................................................................ 3
    2.1      Road Traffic Noise Criteria .................................................................................................... 3
      2.1.1         Department of Transport and Main Roads .................................................................... 3
    2.2      Commercial Noise Criteria .................................................................................................... 4
      2.2.1         Sleep Disturbance ......................................................................................................... 5
3     Existing Noise Environment .......................................................................................................... 6
4     Road Traffic Noise Assessment ................................................................................................... 11
    4.1      Traffic Volumes ................................................................................................................... 12
    4.2      Traffic Speed ....................................................................................................................... 12
    4.3      Road Surface ....................................................................................................................... 12
    4.4      Model Verification .............................................................................................................. 12
    4.5      Predicted Noise levels ......................................................................................................... 13
    4.6      Assessment of Predictions .................................................................................................. 16
5     Commercial Noise Assessment ................................................................................................... 17
    5.1      Predicted Noise Levels ........................................................................................................ 18
    5.2      Assessment of Predictions .................................................................................................. 21
6     Conclusion................................................................................................................................... 22
7     References .................................................................................................................................. 23




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                                                                ii
Report
Verve Building Design and Concepts | 0009

Page 4

1 Introduction
MRG Environmental (MRG) has been requested by Verve Building Design and Concepts (VerveBD) to
conduct an acoustic assessment of the proposed mixed use development at Myall Street, Cooroy
(Real property description Lot 4 on SP248479).

This report assesses the following:

         Reverse Amenity – Road traffic noise assessment from surrounding state controlled roads
          being the Bruce Highway and Cooroy Connection Road onto proposed sensitive uses.
         Reverse Amenity – Noise assessment of proposed commercial/retail activity onto
          surrounding existing sensitive receivers.

1.1 Project Description

The proposed site is at Cooroy Connection Road (Myall Street), Cooroy, as shown in Figure 1.1.




                                                                  N2



                                                         N3
                                                         SITE
                                                        W1

                                                        N1




                                     Figure 1.1: Site Locality (Source: QLD Globe)

The proposed mixed use development, as shown in Figure 1.2 consists of the following:

         Combined service station, food store and fast food including drive-through
         Self-storage units
         Four (4) bay manual carwash with two (2) vacuum bays
         Tourist Park with a site manager office, an amenities building, 10 cabins and 27 van parks
         Surplus site noted for future development


0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                  1
Report
Verve Building Design and Concepts | 0009

Page 5

There are residences located to the northwest across Ferrells Road. A golf course is located across
Myall Street to the northeast and the Bruce Highway (off ramp) is adjacent to the southwestern site
boundary.

The following hours of operation are proposed for the various commercial uses:

         Service station/Food store:
               o Service Station - 24 hours a day, 7 days a week
               o Food store – 7:00 am to 6:00 pm, 7 days a week (Deliveries 7:00am to 10:00pm)
         Fast food – 24 hours a day, 7 days a week (Deliveries 7:00am to 10:00pm)
         Self Storage units – 7:00 am to 10:00 pm, 7 days a week
         Carwash – 7:00 am to 10:00 pm, 7 days a week




          Figure 1.2: Proposed Site Layout (Source: VerveBD Ref: 14004-DA02 Rev B dated 27/05/14)

0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                 2
Report
Verve Building Design and Concepts | 0009

Page 6

2 Noise Criteria

2.1 Road Traffic Noise Criteria

2.1.1 Department of Transport and Main Roads

The Department of State Development, Infrastructure and Planning (DSDIP) have released the State
Development Assessment Provisions (SDAP). Module 1.1 ‘Managing noise and vibration impacts
from transport corridors state code’ (DSDIP, 2013) of SDAP includes a summary of noise criteria
taken from TMR’s document entitled ‘Transport and Main Roads Policy for Development on Land
Affected by Environmental Emissions from Transport and Transport Infrastructure Version 2, 10 May
2013’ (DLAEETTI)(TMR, 2013). Road traffic noise criteria included within DLAEETTI is summarised
below in Table 2.1and Table 2.2 for external and internal criteria respectively.

                                Table 2.1: DLAEETTI External Noise Level Criteria
   Transport           Development         Location within                  Environmental criteria
 Infrastructure            type             Development
  State-controlled    Accommodation               All facades            ≤ 60 dB(A) L10 (18hr) facade corrected
        road             activities                                   (measured L90 (8hr) free field between 10pm
         OR           Residential care                                             and 6am ≤ 40dB(A))
    Multi-modal           facilities                                     ≤ 63 dB(A) L10 (18hr) facade corrected
   Corridor which                                                     (measured L90 (8hr) free field between 10pm
does not include a                                                                 and 6am > 40dB(A))
railway or includes                          Private open space       ≤ 57 dB(A) L10 (18hr) free field (measured L90
 <15 single railway                                                  (18hr) free field between 6am and midnight ≤
       events                                                                            45dB(A))
                                                                      ≤ 60 dB(A) L10 (18hr) free field (measured L90
                                                                     (18hr) free field between 6am and midnight >
                                                                                         45dB(A))



                                Table 2.2: DLAEETTI Internal Noise Level Criteria
   Transport           Development         Location within                   Environmental criteria
 Infrastructure            type               building
  State-controlled    Accommodation          Habitable rooms all   ≤ 35 dB(A) Leq (1hr) (maximum hour over 24 hours)
        road             activities                times
         OR           Residential care
      Busway              facilities
         OR
      Light rail
         OR
    Multi-modal
   corridor which
does not include a
railway or includes
 <15 single railway
       events



As the proposed development is located in a transportation noise corridor, it is required to be
assessed under the Queensland Development Code (QDC) MP 4.4 Buildings in a Transport Noise


0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                                  3
Report
Verve Building Design and Concepts | 0009

Page 7

Corridor. It should be noted that land within a transport noise corridor is defined under Chapter 8B
of the Building Act 1975.

Queensland Development Code (QDC) MP 4.4 Buildings in a Transport Noise Corridor was gazetted
on 1 September 2010. The purpose of QDC MP 4.4 is to ensure habitable rooms of Class 1, 2, 3 and 4
buildings located in a Transport Noise Corridor are designed and constructed to reduce transport
noise.

The objective of this noise assessment is to demonstrate which noise category is applicable to each
of the proposed allotments. The criteria for determining the relevant noise category and facade
treatments are given below in Table 2.3 and offer an alternative method to criterion nominated in
Table 2.2 (DSDIP, 2013).

                                                Table 2.3: Noise Category Levels
                     Noise Category                           Level of transport noise * (LA10, 18hr) for State-controlled
                                                                   roads and designated local government roads
                             4                                                       ≥ 73 dB(A)
                             3                                                      68 – 72 dB(A
                             2                                                     63 – 67 dB(A)
                             1                                                     58 – 62 dB(A)
                             0                                                       ≤ 57 dB(A)
* measured at 1 m from the facade of the proposed or existing building.




2.2 Commercial Noise Criteria

The ‘Background Plus’ noise limits are widely accepted in Queensland as being appropriate noise
limits for minimising the risk of noise complaints. ‘Background Plus’ noise limits are regularly used
by DERM when specifying noise criteria or assessing noise complaints. Traditionally ‘Background
Plus’ criteria have been applied as presented in Table 2.4.

                                    Table 2.4: Informal ‘Background Plus’ Noise Criteria
Noise Sensitive Place
Daytime 7am - 6pm                                                     LAmax,adj ≤ Background noise level plus 5 dB(A)
Evening 6pm - 10pm                                                    LAmax,adj ≤ Background noise level plus 5 dB(A)
Nighttime 10pm - 7am                                                  LAmax,adj ≤ Background noise level plus 3 dB(A)
Noise Sensitive Commercial Place
Daytime 7am - 6pm                                                     LAmax,adj ≤ Background noise level plus 10 dB(A)
Evening 6pm - 10pm                                                    LAmax,adj ≤ Background noise level plus 10 dB(A)
Nighttime 10pm - 7am                                                  LAmax,adj ≤ Background noise level plus 8 dB(A)
Note: Background noise level is defined as LAbg,T.


These limits are based on superseded AS 1055.2:1989 ‘Acoustics-Description and measurement of
environmental noise Part 2: Application to specific situations’ reference:

           Where LAmax,adj,T is greater than LAbg,T, the noise is likely to be discernible and if the difference
           is substantial enough the noise will be annoying.


0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                                        4
Report
Verve Building Design and Concepts | 0009

Page 8

It should be noted that AS 1055.2:1989 also states the following:

          Difference of 5 dB or less may be of marginal significance with respect to annoyance.

AS 1055.1:1989 ‘Acoustics-Description and measurement of environmental noise Part 1: General
Principles’ states that:

          LA90,T is commonly taken to be an approximation of LAbg,T

          LA10,T is commonly taken to be an approximation of LAmax,T

With adoption of the Environmental Protection (Noise) Policy 2008, Reprint 1A, 2012 ‘Background
Plus’ criteria have been changed from those used informally. Environmental Protection (Noise)
Policy 2008 adopts the following ‘Background Plus’ criteria to control background creep:

     (b) for noise that varies over time measured by LAeq,adj,T—more than 5dB(A) greater than the
        existing acoustic environment measured by LA90,T.

The latest ‘Background Plus’ noise criteria as defined in the Environmental Protection (Noise) Policy
2008 have been used to assess potential annoyance from industry located to the southeast of the
proposed site. The use of an LAeq descriptor allows for the accumulated noise level emission from
numerous facilities and sources to be assessed simultaneously.

2.2.1 Sleep Disturbance

World Health Organisation document entitled “Guidelines for Community Noise” (WHO, 1999)
recommends that to avoid sleep disturbance within bedrooms, indoor guideline values of 45 dB LAmax
should be adopted for single sound events.

Therefore an internal noise level goal of 45 dB(A) LAmax has been used to assess the potential for
sleep disturbance from industry to the southeast of the site. A facade reduction of 5 dB(A) is
assumed for windows open and therefore an external limit of 50 dB(A) LAmax has been assumed.




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                   5
Report
Verve Building Design and Concepts | 0009

Page 9

3 Existing Noise Environment
MRG conducted noise measurements to establish the existing ambient noise environment. Noise
measurements were conducted at Location N1, N2 and N3 located on the northwestern,
northeastern and northern portions of the site respectively, as presented on Figure 1.1.
Measurements were conducted from Saturday 15 to Wednesday 19 March 2014 with Larson Davies
LD831 sound level meters. The noise loggers were field calibrated with no significant drift noted
during the measurement period. Audio snap shots were recorded at the commencement of each
monitoring interval. Dominant noise source was road traffic noise with occasional wildlife noise.

Weather observations were measured at W1, as presented on Figure 1.1. With the exception of a
single hour (16/03/2014 17:00 - 3.35 m/s), inclement weather was not noted during the monitoring
period as wind speeds were below of 3 m/s and no rainfall was recorded.

A summary of unattended and attended measurements are presented in Table 3.1, Table 3.2 and
Table 3.3 for monitoring Location N1, N2 and N3 respectively. Table 3.4 summarises measured
background noise levels at Location N1, N2 and N3. Plots of LA1, LA10, LAeq and LA90 are presented in
Figure 3.1, Figure 3.2, and Figure 3.3 for N1, N2 and N3 respectively.

The 1/3 octave data from the measurement period for LA10 and LAeq are presented in:

          Figure 3.4 and Figure 3.5 respectively for Location N1.
          Figure 3.6 and Figure 3.7 respectively for Location N2.

The following time periods are considered:
          Daytime is taken to be 7:00 am to 6:00 pm (Road Traffic Noise 6:00 am to 6:00 pm).
          Evening is taken to be 6:00 pm to 10:00 pm
          Nighttime is the remaining hours of the day being 10:00 pm to 7:00 am (Road Traffic Noise
           10:00 pm to 6:00 am).

                      Table 3.1: Summary of Unattended Noise Measurements at Location N1
                                                                                            LA90 Minimum*
    Date             LA10(18 h)          LA90(8 h)           LA90(18 h)
                                                                                Daytime      Evening        Nighttime
 17/03/2014             65.6                36.7               51.7
 18/03/2014             65.4                37.2               51.6                50.1        43.3           30.1
   Average              65.5                37.0               51.6
Note: LA90 Minimum is taken to be the median of the measured LA90 minimum in each period.


                      Table 3.2: Summary of Unattended Noise Measurements at Location N2
                                                                                            LA90 Minimum*
    Date             LA10(18 h)          LA90(8 h)           LA90(18 h)
                                                                                Daytime      Evening        Nighttime
 17/03/2014             56.8                37.2               46.9
 18/03/2014             56.5                36.1               46.8                47.4        40.4           32.1
   Average              56.6                36.6               46.9
Note: LA90 Minimum is taken to be the median of the measured LA90 minimum in each period.


0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                                   6
Report
Verve Building Design and Concepts | 0009

Page 10

          Table 3.3: Summary of Unattended Noise Measurements at Location N3 - 15 to 19/03/14
                                                           Measured Noise Level (dB(A)
     Descriptor               Period
                                                  Minimum           Maximum               Average
                                Daytime (7am-6pm)                      55.0                      74.8             61.9
          LA1                   Evening (6pm-10pm)                     49.1                      68.3             57.2
                               Nighttime (10pm-7am)                    42.5                      67.5             55.3
                                Daytime (7am-6pm)                      49.6                      64.8             55.4
          LA10                  Evening (6pm-10pm)                     45.7                      65.3             52.2
                               Nighttime (10pm-7am)                    38.2                      59.6             50.1
                                Daytime (7am-6pm)                      42.8                      53.3             48.4
          LA90                  Evening (6pm-10pm)                     36.6                      52.1             42.4
                               Nighttime (10pm-7am)                    26.9                      52.3             37.8
                                Daytime (7am-6pm)                      47.5                      61.7             54.5
          LAeq                  Evening (6pm-10pm)                     43.0                      62.5             51.5
                               Nighttime (10pm-7am)                    36.2                      57.4             49.3



                            Table 3.4: Summary of Background Noise Levels - 15 to 19/03/14
          Location                       Daytime                 Evening                                  Nighttime
             N1                                 50                                43                         30
             N2                                 47                                40                         32
             N3                                 45                                39                         32
Note: Background levels were calculcated by either the minimum LA90 or the lowest 10th percentile LA90.




                              Figure 3.1: Measured Noise levels at N1 from 15 to 19/03/14

0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                                    7
Report
Verve Building Design and Concepts | 0009

Page 11

                           Figure 3.2: Measured Noise levels at N2 from 15 to 19/03/14




                           Figure 3.3: Measured Noise levels at N3 from 15 to 19/03/14


0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                    8
Report
Verve Building Design and Concepts | 0009

Page 12

                   Figure 3.4: LA10 1/3 Octave Measured Noise Level at N1 from 17 to 18/03/14




                   Figure 3.5: LAeq 1/3 Octave Measured Noise Level at N1 from 17 to 18/03/14


0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                           9
Report
Verve Building Design and Concepts | 0009

Page 13

                   Figure 3.6: LA10 1/3 Octave Measured Noise Level at N2 from 17 to 18/03/14




                   Figure 3.7: LAeq 1/3 Octave Measured Noise Level at N2 from 17 to 18/03/14


0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                           10
Report
Verve Building Design and Concepts | 0009

Page 14

4 Road Traffic Noise Assessment
The road traffic noise model was configured using the CadnaA Version 4.4.145 noise prediction
software (DataKustik, 2013) with algorithms based on those contained in CoRTN (Calculation of Road
Traffic Noise), UK Department of Transport 1988.

Topographical information for the site was proved by Noosa Shire Council (NSC), development
layout provided by VerveBD (Drawing: 14004-DA02 Rev B dated 27/05/14). Figure 4.1 presents the
topography of the site.




                                       Figure 4.1: Topography Site & Surrounds

Floor levels were provided by vT Consulting Engineers (Drawing: 14012-P003 & P004 Rev A dated
23/05/14) as presented in Table 4.1.

                                            Table 4.1: Assumed Floor Levels
              Location                                Building                          Build Pad Level
                                                 Office/Site Manager                          112.5
            Tourist Park                              Amenities                               111.4
                                                  Cabins/Caravans             Assumed to be 0.5 m above ground level
                                                 Western/Northern                             117.3
            Self Storage                               Eastern                                116.7
                                                        Central                               117.0


0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                             11
Report
Verve Building Design and Concepts | 0009

Page 15

              Location                                  Building                     Build Pad Level
                                                       Fuel Sales                         112.5
                                                      Foodstore                           112.5
           Service Station
                                                Refuelling Bowser Area                    112.0
                                                       Fast food                          112.5
              Carwash                             Manual Wash Bays                        112.5


4.1 Traffic Volumes

Traffic data presented in Table 4.2 were used in the configuration of the road traffic noise model.
TARS data were provided by TMR for the existing scenario (AADT and historical growth rates). The
10 year horizon traffic figures were based on the default TMR growth rate of 3.5 % per annum. The
18 hour traffic flow is assumed to be 94 % of the AADT.

                                            Table 4.2: Traffic Data Summary
                                               AADT                18 Hour Traffic   % Heavy           Speed
            Road                   Year
                                            (vehicles)                (vehicles)     Vehicles           Limit
                                   2014        16092                   15126
        Bruce Highway                                                                 19.68%            90
                                   2024        22699                   21337

     Myall Street (Cooroy          2014        7854                     7383
                                                                                      9.16%            60/80
      Connection Road)             2024        11079                   10414

    Myall Street (Cooroy           2014        4125                     3877
                                                                                      9.16%             60
 Connection Road) Underpass        2024        5818                     5469

 Bruce Highway south bound         2014         201                     189
                                                                                      9.16%             60
          off ramp                 2024         283                     266

Bruce Highway south bound on       2014        3245                     3050
                                                                                      9.16%             80
           ramp                    2024        4577                     4302


4.2 Traffic Speed

The existing posted traffic speed is provided in Table 4.2. Noise modelling for current (2014) and
future (2024) years is based on the posted traffic speed.

4.3 Road Surface

The current road pavement surfacing is assumed to be principally dense graded asphalt. TMR, 2008
recommends a correction of + 0 dB(A) for dense graded asphalt.

4.4 Model Verification

The calculated noise level for 2014 was compared with the measured noise level as presented in
Table 4.3.




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                           12
Report
Verve Building Design and Concepts | 0009

Page 16

                         Table 4.3: Comparison of Measured and Calculated Noise Levels
        Location            Measured LA10(18 hour)     Calculated LA10(18 hour)      Modelled Difference
                                      dB(A)                     dB(A)
           N1                            65.5                            65.5                           0.0
           N2                            56.6                            61.8                           5.2



A comparison of the freefield calculations and measurements at Location N1 show that the model is
considered to be verified as the modelled difference is within the ± 2 dB(A) range.

The measured level at Location N2 is considered to be influenced by vegetation attenuation effects
(vegation 10 to 15 m in depth) which are not considered in the CoRTN algorithm. Measurements
conducted by Huddart, 1990 noted attenuation effects were in the order of 2 to 6 dB (LA10)
(recommends 5 dB for dense vegetation) for 10 m of vegetation when compared to grassland. This
research noted that the effectiveness of vegetation attenuating traffic noise is variable and is
greatest close to the road and diminishes as the distance from the road increases. Considering the
measured noise level with respect to these vegetation influences the modelled difference is likely to
be 3.2 dB to -0.8 dB (0.2 dB based on recommendation for dense vegetation) and for the purposes of
this assessment the model is considered to be verified at Location N2. It is noted that vegetation’s
effects have only been considered for verification and have not been included in the 2024 noise
predictions.

4.5 Predicted Noise levels

Noise levels were predicted for the year 2024 at the proposed tourist park. Table 4.4 presents the
facade corrected (+2.5 dB(A)) predicted road traffic noise levels for site office, cabins and pool area
(free field) with and without proposed barriers presented in Figure 4.2. Predicted noise levels are
1.5 m above floor levels provided in Table 4.1.

As the construction is unknown at this stage QDC noise level categories are presented with the
proposed barrier in Table 4.1. Predicted road traffic noise levels are presented for ground floor
receptors (caravan parking spaces) in Figure 4.3. Predicted facade noise levels contours are 1.8 m
above natural ground levels.

                                 Table 4.4: Predicted 2024 Road Traffic Noise Levels
                                                LA10(18 hour) Facade Reflected Noise Level          QDC MP 4.4
    Building                Location                              dB(A)                               Category
                                                No Barrier                With Barrier       No Barrier    With Barrier
                           Southwest                    66                    58                 2              1
                           Northwest                    62                    59                 1              1
  Site Manager
                           Northeast                    61                    60                 1              1
                           Southeast                    66                    60                 2              1
                           Southwest                    66                    64                 2              2
                           Northwest                    65                    59                 2              1
     Cabin 1
                           Northeast                    60                    60                 1              1
                           Southeast                    65                    65                 2              2
                           Southwest                    62                    61                 1              1
     Cabin 2
                           Northwest                    64                    60                 2              1

0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                                13
Report
Verve Building Design and Concepts | 0009

Page 17

 

 

Northeast
Southeast
Southwest
Northwest
Northeast
Southeast
Southwest
Northwest
Northeast
Southeast
Southwest
Northwest
Northeast
Southeast
Southwest
Northwest
Northeast
Southeast
Southwest
Northwest
Northeast
Southeast
Southwest
Northwest
Northeast
Southeast
Southwest
Northwest
Northeast
Southeast
Southwest
Northwest
Northeast
Southeast
Pool Area (free field)

Cabin 3

Cabin 4

Cabin 7

Cabin 8

Cabin 10

 

 

0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx 14
Report
Verve Building Design and Concepts | 0009

Page 18

                             Figure 4.2: Proposed Acoustic Barriers (Road Traffic Noise)




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                      15
Report
Verve Building Design and Concepts | 0009

Page 19

                    Figure 4.3: Ground Level Contours – Proposed Barrier – Facade Reflected




4.6 Assessment of Predictions

Predicted 2024 road traffic noise levels as shown in Table 4.4 meet the TMR external formal open
space criterion of 60 dB(A) LA10(18 hour) free field with the inclusion of the proposed acoustic barrier
as presented in Figure 4.2.

Predicted 2024 road traffic noise levels as shown in Table 4.4 and Figure 4.3 exceed the TMR
external facade criterion (used to protect internal building amenity) of 60 dB(A) L A10(18 hour) at
some cabins facades and caravan spaces with the inclusion of the proposed acoustic barrier as
presented in Figure 4.2. Increasing the barrier height to meet the external cabin facade level seems
unnecessary in this instance as the protection of internal noise level goals for cabins may be
incorporated within the facade as per the QDC MP4.4 noise categories. The QDC MP4.4 noise
categories were for each cabin facade presented in Table 4.4.

As the caravan parking spaces are temporary sensitive receivers, maximum recommended acoustic
barrier height has been used and the development is likely to alter the acoustic background
environment. The acoustic barrier (see Figure 4.2) has been designed to meet the external facade
level of 63 LA10(18 hour) facade reflected.

0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                 16
Report
Verve Building Design and Concepts | 0009

Page 20

5 Commercial Noise Assessment
The environmental noise model was configured using the CadnaA Version 4.4.145 noise prediction
software (DataKustik, 2013) with calculations based on ISO 9613 ‘Acoustics — Attenuation of sound
during propagation outdoors’ algorithms.

The noise modelling takes into consideration the activity and equipment sound power levels of the
industrial operations to the southeast of the site and includes adjustments for attenuation from
geometric spreading, acoustic shielding from intervening ground topography, ground effect and
atmospheric absorption. The algorithm is inherently conservative, representing enhanced noise due
to moderate downwind conditions.

Topography, allotment layout and pad levels from the road traffic noise model (see Section 4) were
used in the environmental model.

Information regarding commercial operations was provided by VerveBD. The noise sources
identified and their estimated sound power levels (LWA) are presented in Table 5.1. Operational
hours are as per Section 1.1. Modelled traffic movement data is based on information obtained
from the traffic report prepared by Pekol Traffic and Transport ‘Proposed Mixed-Use Development
Myall Street, Cooroy Traffic Impact Assessment, 16 May 2014’. Table 5.2 provides the modelled
movements within a 15 minute period for daytime evening and night. These movements are based
on the highest peak hour traffic generation (2026 weekday evening) from the traffic report. The
traffic report also splits the site access for traffic 90 % and 10 % for Myall Street and Ferrells Road
respectively. Where nighttime operations are proposed the modelling has been based on the peak
evening values. Traffic report assumes that service station/fast food traffic would use the Myall
Street entry.

                                        Table 5.1: Commercial Premises Operations
Noise Sources                                              Operation                                 Est. LWA
Patron Vehicles                                                  see Table 5.2                       85 (moving)
Trucks (medium rigid)                                                                                102 (moving)

Trucks (heavy rigid)                                                                                 107 (moving), Maximum 110
Refrigerated Delivery Vehicle                                    7:00 am to 10:00 pm                 100 (stationary)
Carwash (vacuums)                                                7:00 am to 10:00 pm                 85
Carwash (wash bays)                                                                                  93
Service Station/Foodstore/Fast food mechanical Plant             Anytime                             98
(assumed to be 2 x refrigerated condensers, 2 x air              (located on the roof)
conditioning condensers)*
Note: * Refrigerated condensers are assumed to be Buffalo Trident LDV 8 fan and air conditioning condensers are assumed to be ACPAC
APC18.7L2-4 this will need to be confirmed during detailed design and mechanical plant mitigation reassessed.




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                                                 17
Report
Verve Building Design and Concepts | 0009

Page 21

                                        Table 5.2: Modelled Hourly Traffic Movements
                                                                                                          Two-way Traffic Movement
     Location                            Building                            Vehicle Types
                                                                                                        Day         Evening             Night
                           Tourist Park                                         Light                   27            27                 27
                           Self Storage                                      Light, MRV                  8             8                  -
                                       Foodstore                                Light                   124            -                  -
  Service Station            Fuel sales/Fast food/Car wash                   Light, MRV                 210           210                210
                                      Delivery Dock                       HRV (Refrigerated)             1             1                  -
                                              Total                                                     370            246              237
Note: Vehicle distribution of light and commercial vehicles is based on Myall Street existing distribution as presented in Table 4.2.




5.1 Predicted Noise Levels

Noise levels (LAeq) from the proposed mixed use development were predicted at existing sensitive
receivers. Predictions were made with and without acoustic barriers (see Figure 5.1) as presented in
Table 5.3 and Table 5.4 respectively.

In addition LAmax noise levels were predicted from HRV manoeuvring in the bowser area. With no
acoustic barriers LAmax levels were predicted to be up to 57 dB(A) at the most exposed residence
across Ferrells Road. With the inclusion of the proposed barrier this level was predicted to be L Amax
49 dB(A).

              Table 5.3: Predicted Mixed Use Noise Levels at Existing Sensitive Receivers (No Barrier)
                                                                                        Predicted LAeq dB(A)
                               Criterion            Vehicles Manoeuvring         Refrigerated Delivery        Carwash        Mechanical Plant
     Location          Day Evening Night Day Evening Night Day                           Evening          Day Evening        Anytime
1 Ferrells Road - 1    50         43        35      33         32        32       44           44          32      32              39
1 Ferrells Road - 2    50         43        35      34         33        33       45           45          33      33              41
1 Ferrells Road - 3    50         43        35      34         34        33       46           46          34      34              42
1 Ferrells Road - 4    50         43        35      35         34        33       47           47          35      35              42
 13 Ferrells Road      50         43        35      39         38        37       49           49          39      39              46
 15 Ferrells Road      50         43        35      40         39        38       49           49          40      40              46
 17 Ferrells Road      48         42        35      41         40        39       48           48          41      41              46
 19 Ferrells Road      48         42        35      41         41        40       47           47          42      42              46
1/21 Ferrells Road     48         42        35      41         41        40       45           45          42      42              44
2/21 Ferrells Road     48         42        35      42         41        40       46           46          42      42              45
 25 Ferrells Road      48         42        35      40         40        39       43           43          42      42              42
 27 Ferrells Road      53         46        33      40         40        39       42           42          44      44              41
 29 Ferrells Road      53         46        33      39         39        38       41           41          38      38              40
 31 Ferrells Road      53         46        33      38         38        37       40           40          35      35              39
Note: 1 Ferrells Road 1 to 4 denotes the first row of units fronting Ferrells Road north to south respectively.




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                                                         18
Report
Verve Building Design and Concepts | 0009

Page 22

AMRG

Environmental

 

Table 5.4: Predicted Mixed Use Noise Levels at Existing Sensitive Receivers (With Barrier)

1 Ferrells Road -1 50 43 35 31 31 30 39 39 28
1 Ferrells Road - 2 50 43 35 31 30 30 40 40 29
1 Ferrells Road - 3 50 43 35 31 30 30 40 40 30
1 Ferrells Road - 4 50 43 35 31 30 30 39 39 27
13 Ferrells Road 50 43 35 34 34 33 41 41 33
15 Ferrells Road 50 43 35 36 35 34 41 41 39
17 Ferrells Road 48 42 35 37 36 35 41 41 34
19 Ferrells Road 48 42 35 37 36 35 41 41 34
1/21 Ferrells Road 48 42 35 36 35 34 45 45 34
2/21 Ferrells Road 48 42 35 36 35 34 46 46 34
25 Ferrells Road 42 35 35 35 34 39 39 34
27 Ferrells Road 53 46 33 35 34 33 38 38 34
29 Ferrells Road 53 46 33 35 34 33 37 37 31
31 Ferrells Road 53 46 33 35 34 33 36 36 29
Note: 1 Ferrells Road 1 to 4 denotes the first row of units fronting Ferrells Road north to south respectively.

 

 

0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx 19
Report
Verve Building Design and Concepts | 0009

Page 23

                             Figure 5.1: Proposed Acoustic Barriers (Commercial Noise)




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                    20
Report
Verve Building Design and Concepts | 0009

Page 24

5.2 Assessment of Predictions

Predicted mixed-use noise levels as shown in Table 5.4 and Section 4.5 meet the nominated criteria
with the exception of delivery vehicles (refrigerated) in the loading dock area, mechanical plant and
trucks manoeuvring outside the service station area. Mechanical plant exceedances would require
additional analysis and may utilise options such as barrier shielding, placement, quiet equipment
selection to ensure limits are met.

The following recommendations are made:

         Construction of acoustic barriers as per Figure 5.1. The barriers should be solid and
          continuous with negligible gaps and a minimum surface density of 12.5 kg/m 2.
         Deliveries and refuse collection (with the exception of fuel) should be during the daytime
          (7:00 am to 6:00 pm) only.
         Site access should be restricted to Myall Street entry/egress during the nighttime.
         Mechanical plant for the purposes of assessment was assumed to determine a benchmark as
          the mechanical plant for the proposed development is yet to be selected. It is proposed that
          during the detailed stages of the project, an assessment of the mechanical plant noise
          emissions using the actual plant model selections and installation arrangements be made to
          ensure that the nominated limits are met. Therefore noise limits are proposed to inform the
          selection of mechanical plant for the development. Table 5.3 presents noise limits to be met
          at the nearest existing sensitive receivers to the proposed development.




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                               21
Report
Verve Building Design and Concepts | 0009

Page 25

6 Conclusion
MRG Environmental conducted a noise impact assessment for the proposed mixed use development
at Myall Street, Cooroy. The assessment was conducted to assess noise emanating from
surrounding state controlled roads being the Bruce Highway and Cooroy Connection Road and the
proposed mixed use development and recommend treatment to achieve the nominated noise level
criteria.

Road traffic noise impacting external facades/formal open space was assessed using ‘Transport and
Main Roads Policy for Development on Land Affected by Environmental Emissions from Transport
and Transport Infrastructure Version 2, 10 May 2013’ (DLAEETTI)(TMR, 2013). Internal acoustic
amenity was assessed by the revision of the QDC MP4.4 noise categories for each cabin/site office.
Commercial noise was assessed using ‘background plus’ and sleep disturbance criteria during the
nominated operational hours.

The results of the assessment are as follows:

Road Traffic Noise

         Construction of acoustic barriers as per Figure 4.2. Acoustic barriers should be solid and
          continuous with negligible gaps and constructed to meet TMRs MRS15 and MRTS15.
         Incorporate facade treatments consistent with QDC MP4.4 noise categories as presented in
          Table 4.4 for cabins/site office.

Commercial Noise

         Construction of acoustic barriers as per Figure 5.1. The barriers should be solid and
          continuous with negligible gaps and a minimum surface density of 12.5 kg/m2.
         Deliveries and refuse collection (with the exception of fuel) should be during the daytime
          (7:00 am to 6:00 pm) only.
         Site access should be restricted to Myall Street entry/egress during the nighttime.
         As mechanical plant for the proposed development is yet to be selected, noise limits were
          proposed to inform the selection of mechanical plant as presented in Table 5.3.
         Carwash pumps and water treatment should be located within an enclosed building.
         Carwash vacuums should be selected to be at or below the estimated sound power levels
          nominated within Table 5.1.




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                                  22
Report
Verve Building Design and Concepts | 0009

Page 26

7 References
Datakustik (2013). CadnaA Noise Prediction Software Version 4.4.145. DataKustik GmbH. Munich,
Germany.

Department of Local Government and Planning (2010). Queensland Development Code: MP4.4 –
Buildings in a Transport Noise Corridor, Queensland, Australia.

Department of Transport and the Welsh Office, UK, (1988). “Calculation of Road Traffic Noise.”

DSDIP (2013). Module 1.1 - Managing noise and vibration impacts from transport corridors state
code.

EHP (2008). Environmental Protection (Noise) Policy 2008 Explanatory Notes for SL 2008 No. 442.
Office of the Queensland Parliamentary Counsel, Brisbane.

EHP (2012). Environmental Protection (Noise) Policy 2008, Reprint 1A, Office of the Queensland
Parliamentary Counsel, Brisbane.

Huddart L (1990). The use of vegetation for traffic noise screening - TRRL Research Report 238.
Department of Transport - Transport and Road Research Laboratory, Crowthorne Berkshire.

International Organization for Standardization (1993). ISO 9613 Acoustics – Attenuation of sound
during propagation outdoors.

Pekol Traffic and Transport (2014) ‘Proposed Mixed-Use Development Myall Street, Cooroy Traffic
Impact Assessment, 16 May 2014’.

Standards Australia (1989). AS 1055.1: 1989 Acoustics-Description and measurement of
environmental noise Part 1: General Principles. Standards Australia, Sydney.

Standards Australia (1989). AS 1055.2: 1989 Acoustics-Description and measurement of
environmental noise Part 2: Application to specific situations. Standards Australia, Sydney.

Standards Australia (1997). AS 1055.1-1997 Acoustics – Description and measurement of
environmental noise – General procedures. Standards Australia, Sydney.

Standards Australia (1997). AS 1055.2-1997 Acoustics – Description and measurement of
environmental noise – Application to specific situations. Standards Australia, Sydney.

TMR (2008), Road Traffic Noise Management: Code of Practice, Department of Transport and Main
Roads, Brisbane.

TMR (2013), Transport and Main Roads Policy for Development on Land Affected by Environmental
Emissions from Transport and Transport Infrastructure Version 2, 10 May 2013, Department of
Transport and Main Roads, Brisbane.



0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                              23
Report
Verve Building Design and Concepts | 0009

Page 27

World Health Organisation (1999). Guidelines for community noise, World Health Organisation,
Bonn, Germany.




0009-R1-01 VerveBD Mixed Use Cooroy Noise Report.docx                                          24
Report
Verve Building Design and Concepts | 0009

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.