               6.     External colours and finishes must be of muted/environmental tones that blend with the
                      natural environment and low-reflective roofing and cladding materials.
                      Geotechnical Stability
               7.     All works must be carried out in accordance with Tectonic’s Slope Stability Assessment
                      (26138-001-Rev0) dated 12 May 2026 and endorsed through the building permit.
                      *(Refer to Advisory Note)
               8.     Certification must be submitted to the private building certifier from a qualified person* which
                      certifies that the development has been constructed in accordance with the
                      recommendations contained in Tectonic’s Slope Stability Assessment (26138-001-Rev0)
                      dated 12 May 2026 and that the development has a minimum factor of safety against landslip
                      of 1.5 in the long term.
                      *(Refer to Advisory Note)
                      Stormwater Drainage
               9.     Stormwater runoff from the development must be connected to a Lawful Point of Discharge
                      or disposed of without causing scour or damage to the subject site or any adjoining property.
                      On-site disposal must be undertaken in accordance with the recommendations of a site-
                      specific geotechnical report and endorsed through a Building Permit.
                      Damage to Services and Assets
               10.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               Demolition of Relevant Structures
                      Codes of Development
               11.    Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
                      solutions as contained in the Waste Management Code and Water Quality and Drainage
                      Code of the Noosa Plan 2020.
                      Works
               12.    Demolition must be undertaken in a manner that causes no detrimental effect upon the
                      amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
                      hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
                      in accordance with the nuisance provisions of the Environmental Protection Act 1994.
                      Waste Management
               13.    Adequate area must be provided on-site for the collection and separate storage of recyclable,
                      non-recyclable, vegetative and hazardous materials in their specific waste streams during
                      removal or demolition works.
               14.    All waste materials must be removed from the site to avoid causing unhealthy conditions,
                      with the site left clean, tidy and free from any debris.
               15.    Where a development permit has not been issued for the future use of the site, hard surfaced
                      areas including concrete slabs must be removed and disturbed areas must be revegetated
                      in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively, the site must
                      be turfed within 20 business days of completing the removal or demolition work.




                                                                                                        Page 3 of 7
Document Set ID: 24935892
Version: 5, Version Date: 10/07/2026

Used in these records

About this file

File size
156 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority DBW26 0051 (As Published).pdf · 156 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.