Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2020-07-16 SM Agenda - Item 1 - Attachment 4 - Final Noosa Plan 2020 Part 7

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Performance outcomes                                                 Acceptable outcomes
  Development is sited and designed such that it does not diminish No acceptable outcome provided
  the ability of laneways to:
  (a)    relieve traffic on streets;
  (b)    provide convenient and safe rear access to premises
         including service vehicles where relevant;
  (c)    provide safe pedestrian linkages;
  (d)    add to the heritage character of Cooroy.

  PO17
  Development facilitates the widening and upgrading of laneways       No acceptable outcome provided.
  in the Cooroy Local Plan Area to accommodate anticipated levels
  of traffic. Where:
  (a)    access to development is taken from a laneway, a 2 metre
         resumption from the laneway frontage is required for
         widening and the laneway is to be upgraded to the
         appropriate standard; or
  (b)    development is undertaken on a property with a laneway
         frontage, and access is not taken, a 2 metre easement is
         provided for future widening and upgrading purposes.

  PO18
  Development improves local connectivity by providing safe and        No acceptable outcome provided.
  convenient pedestrian and bicycle pathways to and between key
  destinations such as the town centre, railway station, community
  and sports facilities and schools.
  PO19                                                                 AO19
  Development integrates with and extends the existing street and      Development on land including or adjoining a key pedestrian/cycle
  pathway networks including but not limited to those identified on    link shown on Figure 7.2.2.4 (Cooroy Framework and Character
  Figure 7.2.2.4 (Cooroy Framework and Character Plan) such that       Plan) facilitates these connections.
  connections to and between key local destinations are provided
  and reinforced.


 Environment, natural resource and recreation values                           Table 7.2.2.3 Table for Assessment Criteria
 (part)
  Performance outcomes                                                 Acceptable outcomes

  Environment, natural resource and recreation values
  PO20                                                                 AO20
  Development has no significant adverse effects on biodiversity,      Connecting Habitat Areas as identified on Map SFM­4 ­
  natural vegetation, native fauna habitat, landscape quality, water   Biodiversity (Strategic Framework Map) are protected from
  quality or cultural heritage values, including those related to:     fragmentation and encroachment by development.
  (a)    changes to natural drainage;
                                                                       Editor’s Note— Council may request additional information on the
  (b)    disturbance to any of the wetland systems;
                                                                       proposed method of effluent disposal to ensure the nature of the
  (c)    management of landslide and fire risk;                        development is compatible with environmental values. Refer to
  (d)    erosion and the transport of sediments off­site;              PSP1 – Preparing a well made application..

  (e)    unmanaged public access;
  (f)    effluent disposal; and
  (g)    changes to fauna habitat and behaviour.

  PO21                                                                 AO21
  Development maintains and protects an integrated open space          Open space corridors identified as Ecological Linkages and Major
  network throughout the locality to—                                  Recreation areas on Map SFM­1 ­ Settlement and Map SFM­4 ­




NOOSA PLAN 2020                                                                                                                Page 20 of 74
Log in to download the original file

2020-07-16 SM Agenda - Item 1 - Attachment 4 - Final Noosa Plan 2020 Part 7(PDF, 23MB).pdf · 23.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.