2022.02.06 - Noosa Council Ltr
Attached to the e-mail Minor Change Application OPW20/0145 - Cover letter - Stormwater Plans - Line 5 Tech Memo - Owner's Consent - DA Form 5.
06 February 2022
399 Montague Rd
Your ref: OPW20/0145
West End QLD 4101
PO Box 3144
Noosa Council South Brisbane QLD 4101
PO Box 141
Tewantin Q 4565 T 07 3004 6888
F 07 3004 6899
By email: [email protected]
www.stockwell.com.au
Attn: Mark Lewis – Coordinator Engineering ABN 50 010 095 360
Diogo Carrico – Development Engineer
Dear Mark and Diogo,
Re: Minor Change to Operational Works Approval - OPW 20/0145 for Reconfiguration of Lot for “Noosa
Business Centre” (NBC) at 28 Eenie Creek Road, Noosaville (Lot 3 on SP246584)
Further to Stockwell’s letter dated 4 November 2021 as part of OPW 20/0145.03 requesting the Lot 3 and Line 5
elements from that Minor Change Application be removed and be assessed separately, we have now revised our
documentation to facilitate a change to our Operational Works Approval, OPW20/0145.04. This change
incorporates: amended stormwater infrastructure at Lot 3 and Line 5 to ensure drainage outlets are not submerged.
The amended infrastructure design incorporates the design methodology reviewed at our site meeting with Mark
Lewis and Diogo Carrico on Tuesday 14 December 2021. This change incorporates:
Amended Stormwater Infrastructure
1. Lot 3 Outlet Swale
As currently designed and approved (1856 SW29-E), the Lot 3 drainage outlet is entirely submerged and
contemplates chasing the outlet to daylight at RL 2.8 within Covenant J.
We have amended our plans so that the Lot 3 drainage has been connected into the Line 5 drainage via a
new pipeline adjacent lot 4, thereby eliminating the additional outlet into the drainage reserve.
2. Line 5 Outlet Swale
As currently designed and approved (1856 SW28-F), the Line 5 drainage outlet is partially submerged and
contemplates chasing the outlet to daylight at RL 2.5 within existing drainage channel.
We have amended our plans to show the Line 5 outlet relocated to the south, at a location where the outlet
level (RL2.5m AHD) can be achieved with minimal works within the drainage reserve.
To facilitate the above Stormwater Infrastructure Amendments, an interim solution utilising the currently constructed
stormwater network has been proposed to enable the balance of the project to be completed.
Please do not hesitate to contract myself directly on 0410 398 363 or via email to discuss this further and resolve
any matters in a timely manner.
Yours Faithfully,
Steven Wright
Stockwell Development Group
Attachments:
Attachment 1 – Line 5 Memo dated 15 December 2021 (Calibre Professional Services Pty Ltd).
Attachment 2 – Line 5 & Lot 3 Swale – 20-000713, Drawings 620-623 & 628
1
Page
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.