      This Deed is conditional upon the approval of the owner's request for a minor change
      in respect of the development on the Subject Site.

3.    INFRASTRUCTURE CONTRIBUTION

3.1   Infrastructure Agreement overrides Development Permit

      This Deed applies to the extent of any inconsistency with any development permit
      and the Infrastructure Contribution payable hereunder is in addition to any conditions
      of, or payments required by, any development permit and/or any infrastructure
      charges notice given in respect of the development.

3.2   Infrastructure Contribution

      On and from satisfaction of clause 2.4, but only while the aged care facility is being
      operated on the Subject Site, the owner must at its cost:

      (i)      construct the access track and causeway crossings / stormwater discharge
               points upgrades on the Council Land generally in acco_rdance with drawings
               General Arrangement Plan STP220347 C102 A dated Jan 2023, Stormwater
               Layout STP22-0347 SKO1 dated 21.03.23, Earthworks / Track Layout
               STP22-0347 SKO3 dated 23.03.23, Causeway Crossing 1 STP22-0347
               SKO5 dated 03.05.23, and Causeway Crossing 2 STP22-0347 SKO6 dated
               03.05.23 prepared by STP Consultants;

      (ii)     maintain the access track and causeway crossings / stormwater discharge
               points on the Council Land a minimum of:

               (A)      Fire trail (including the track, causeway crossings and stormwater
                        discharge): every 3 months

               (B)     Fuel Reduction Zone (FRZ): every 3 years

               (C)      Slashing/mowing: every 3 months

      (iii)    maintain the vegetation buffer zone along the north-eastern and south­
               eastern boundary of the Subject Site on the Council Land, refer to
               RM2022/09056 dated 7 June 2022 and see also RM2020/53583 dated 7
               October 2020:

               (A)     north-eastern boundary: maximum total width of 20m comprising
                       15m as a fire access trail / fuel free zone width and 5m fuel
                       reduction zone width;

               (B)     south-eastern boundary: maximum total width of 15m comprising a
                       15m fuel free zone width.

      (iv)    obtain the necessary owners' consent and subsequent approvals (e.g.
              Operational Works) prior to accessing and undertaking works on the Council
              Land.

      (v)     prepare a Maintenance Plan and Construction Management Plan for the
              works being undertaken on the Council Land to be approved by Council prior
              to the commencement of works.




                                         7 of 12



                                                                                         Page 103 of 310

Log in to download the original (ca3d9e722f.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.