Original source · versioned page text
Meeting papers
Original PDF page 115, section 1. The text section number identifies this passage in the reader.
BANKSIA WING - NORTH ADMINISTRATION EXISTING DARWINIA WING
SCREENING enricharchitecture.com
[email protected] | 07 3392 0235
Office 3, 18-24 Duke Street, Kangaroo Point Qld 4169
Hargraves Briggs Jacuzzi Pty Ltd TA Enrich Architecture
ACN 076 897 606 | ABN 90 076 897 606
STAGE 3A - GROUND FLOOR
16500
COPYRIGHT:
PAINTED FIBRE CEMENT CLADDING All rights reserved. This work is copyright and cannot be reproduced or
copied in any form or by any means (graphic, electronic or mechanical,
ADMINISTRATION - NORTH ELEVATION including photocopying) without the written permission of Hargraves
1 1 : 200 Briggs Jacuzzi Pty Ltd. Any licence, expressed or implied, to use the
document for any purpose whatsoever is restricted to the terms of the
agreement or implied agreement between Hargraves Briggs Jacuzzi Pty
Ltd and the instructing party.
AMENDMENTS
ISSUE DATE SUBJECT DRAWN
EXISTING EUCALYPTUS WING ADMISNISTRATION BANKSIA WING - NORTH A 10/11/22 DA COORDINATION EA
B 30/11/22 DRAFT DA ISSUE EA
C 08/12/22 DA ISSUE EA
D 23/03/23 REVISED DA ISSUE EA
PROFILED METAL ROOFING
COFFEE SHOP PLAYGROUND LIFT
STAGE
STAGE3A1 - GROUND FLOOR
16500
ADMINISTRATION - SOUTH ELEVATION
2 1 : 200
COMMUNAL AREA COMMUNAL AREA
COFFEE SHOP
STAGE 3B - GROUND FLOOR STAGE 3B - GROUND FLOOR
16500 PLAYGROUND 16500
COMMUNAL AREA - SOUTH ELEVATION COMMUNAL AREA - NORTH ELEVATION
3 1 : 200 6 1 : 200
PROJECT
COMMUNAL AREA
OZCARE NOOSA
RE-DEVELOPMENT
PROFILED METAL ROOFING
80 COOYAR ST NOOSA HEADS
STAGE 3B - GROUND FLOOR
16500
TEMPORARY RAMPED WALKWAY PAINTED FIBRE CEMENT CLADDING
COMMUNAL AREA - WEST ELEVATION
4 1 : 200 CLIENT
PRELIMINARY DESIGN
COMMUNAL AREA
DRAWING TITLE
ADMINISTRATION & COMMUNAL
AREA ELEVATIONS
NORTH NOTE: Figured dimensions to be taken in preference to
scaled. Verify all dimensions on site before
commencing work or making shop drawings. When
PAVILION PWD STAFF ROOM printing from electronic files it is the responsibility of
STAGE 3B - GROUND FLOOR the operator to ensure the required scale is achieved.
16500 DRAWN DATE SCALE
EA 01/24/22 1 : 200 at A1
PROJECT NUMBER DRAWING NUMBER ISSUE
COMMUNAL AREA - EAST ELEVATION 1907NOO_ PD_A_311 D
5 1 : 200
Document Set ID: 22447185
Page 115 of 310
Version: 1, Version Date: 01/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (ca3d9e722f.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.