1907NOO_ G Tree Removal Plan, prepared by Enrich 19/06/2023
Architecture
PD_A_001.2
01737 LC_01 B Landscape Site Plan, prepared by View March 2023
Landscape Architecture
01737 LC_02 B Landscape Concept Plan, prepared by View March 2023
Landscape Architecture
01737 LC_03 B Landscape Detailed Concept Plan, prepared by March 2023
View Landscape Architecture
01737 LC_04 B Suggested Planting Character, prepared by View March 2023
Landscape Architecture
Reference Documents
Plan No. Rev. Plan/Document Name Date
J000542 2 Bushfire Hazard Assessment & Management 21/03/2023
Plan, prepared by North Coast Environmental
Services
J000542 1 Bushfire Evacuation Plan, prepared by North 08/12/2022
Coast Environmental Services (Appendix 2 of the
Bushfire Hazard Assessment & Management
Plan, prepared by North Coast Environmental
Services)
WBFE965- OP1 Building Bushfire Safety and Spread Prevention 22/03/2023
001-2023 Strategy, prepared by Walkerbai Fire
Engineering
Building Height
47. The maximum height of the development must not exceed 9 metres above the ground level
for the roof of the Banksia building only, in accordance with the approved plans. All other
buildings in the development must not exceed 8 metres in height above the ground level
48. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that the buildings do not exceed the maximum height requirement of this Decision
Notice.
Nature and Extent of Approved Use
49. The total number of persons residing on the premises at any one time must not exceed 130.
Performance Bond
50. Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
Page 2 of 5
Page 77 of 310
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (ca3d9e722f.pdf)