Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Meeting papers

of 320

Original PDF page 80, section 1. The text section number identifies this passage in the reader.

      Retention of Existing Trees
68.   The existing Allocasurina littoralis within the Bushfire buffer associated with Lot 1 SP239726
      must be retained in accordance with an Arborist Report (or part thereof) prepared by a
      qualified person* and endorsed through an Operational Works approval
      *(Refer to Advisory Note)
69.   The existing Allocasurina littoralis in the south-eastern portion of the subject site must be
      retained, except where required to be removed to accommodate the approved building, in
      accordance with the recommendations of an Arborist Report (or part thereof) prepared by a
      qualified person* and endorsed through an Operational Works approval.
      *(Refer to Advisory Note)
70.   Prior to the prestart meeting, a bank guarantee or a bond of $10,000 must be lodged as
      security for the protection of the trees identified for retention in the conditions of this approval
      listed within this Decision Notice. The bond:
      a.    may be drawn upon by Council in its entirety if any one tree identified for retention is
            damaged to the point where the tree cannot be saved (as confirmed by the project
            arborist and agreed in writing by Council)
      b.    will be returned upon practical completion of all the operational works relating to this
            development.
      *(Refer to Advisory Note)
      Fauna Management
71.   Vegetation must only be removed or disturbed in accordance with a Fauna Management
      Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
      Works approval.
      *(Refer to Advisory Note)
72.   Permanent artificial nesting boxes must be installed within the development site to provide
      compensatory habitat for arboreal mammals and hollow dependent avian species. The
      works must be undertaken in accordance with an Operational Works approval.
      Bushfire Management
73.   The development must be carried out in accordance with the Bushfire Hazard Assessment
      and Management Plan v2 listed within this Decision Notice*.
      *(Refer to Advisory Note)
74.   The development must be carried out in accordance with the Building Bushfire Safety and
      Spread Prevention Strategy listed within this Decision Notice*.
      *(Refer to Advisory Note)
75.   A 2.5 metre high non-flammable permanent fence must be constructed adjacent to the
      southern extension of the existing building footprint in accordance with the recommendations
      of the Bushfire hazard Assessment and Management Plan v2 listed in this Decision Notice.
76.   Certification must be submitted to Council from a qualified person* which certifies that the
      development has been constructed in accordance with the bushfire management conditions
      of this Decision Notice.
      *(Refer to Advisory Note)
77.   A copy of the bushfire evacuation plan for the development must be provided to the nearest
      fire authority.




                                                                                            Page 5 of 5

                                                                                                   Page 80 of 310

Log in to download the original (ca3d9e722f.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.