Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Development Application part 2 Report and Plans MCU13/0053

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (117 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5.2    Site Selection:’::
The proposal site was selected as it met the NBN Co coverage objectives. As discussed
in Section 3, a number of candidates were examined within the search area which
resulted in the chosen candidate at 153 Lake Flat Road, Boreen Point. Furthermore, the
reasons for   selecting this site are as follows:
   .   The site is appropriately located within a rural area which is characterised by large
       farming properties, heavily vegetated hinterland areas and large rural-residential
       allotments;

   .   The proposed location provides an adequate separation distance from community
       sensitive land      uses   and is setback more than 240 m from the closest and    only
       three (3)residential dwellings within        500 m radius;

   .   The   facility has been appropriately located on a highly modified subject site
       predominantly used for forestry and logging purposes and containing similar
       electrical infrastructure such as the energex electricity network which runs from
       north to south through the property;

   .   The proposed facility is located a sufficient buffer distance from environmentally
       sensitive locations (approximately 200 m from Lake Cootharaba) and no vegetation
       removal will be required;

   .   The location     provides line of sight to other planned     sites in the NBN wireless
       network specifically -Soreen Point North; and

   .   The Telecommunication Facility on this site has been appropriately located on the
       periphery of the township whilst still being able to meet coverage objectives for the
       area and minimising visual impact given the presence of mature vegetation

       surrounding the site.




NBN-4NBZ-4POM-5135     -   Boreen Point                                             Page 21
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0053.pdf · 117 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.