Original source · versioned page text
Development Application part 2 Report and Plans MCU13/0053
The original of this document is very large (117 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn The proposal does not involve the
implementation of. .
passive nature-based
recreational and educational opportunities,
however not withstanding this the proposed
facility is set back on a private property and
will not adversely impact or remove
opportunities for recreational or educational
facilities to occur.
There are no other significant conservation
present within the subject site.
areas
For
reasons the
these proposal is
consistent with DEO 3.1.3 (g).
"3.1.3 (I) Infrastructure and services Complies.
(i) The efficient provision and use of The proposed use for a telecommunications
services such as water, sewerage, power, facility is identified as an infrastructure
telecommunications and waste disposal, service as per DEO 3.1.3 (I).
caters for the needs of residents and
visitors, relative to their location within The locality of Boreen Point has been
Noosa identified for development of a new facility
(ii) the ongoing viability of existing to provide broadband services to residents,
infrastructure uses and facilities are visitors and businesses within the area. The
protected from the impacts of future facility will serve as a key link in the NBN
development. network, shooting information to Boreen
Point North.
,-
To mini mise amenity impacts, the facility
has been appropriately co-located with
existing infrastructural
uses the in
surrounding area including powerlines and
poles.
The siting of this facility’ has been a
strategic and comprehensive process
undertaken to provide an efficient and high
quality service to the community, whilst
mlnlmising potential impacts on the
environment.
Existing infrastructure uses within the area
will not be impacted by the development.
Instead the proposed facility will provide
telecommunications services and
infrastructure and thus an. opportunity for
other mobile phone carriers to collocate
which will increase the efficient provision of
telecommunications services in the Boreen
Point Area.
For these reasons, the proposal is
considered to comply with the intent of OED
3.1.3 (I).
NBN-4NBZ-4POM-5135 -
Boreen Point Page 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.