Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
        For these reasons, the proposed is considered to comply with the Overall Outcomes of the
        Biodiversity Overlay Code, and further assessment is not required.


        7.2.7 Natural Hazards Overlay Code

        The subject site is identified as containing ’Flood Hazard Area’ and ’Subject to minimum
        floor height’ within the Landslide & Flooding         Overlay (refer to Figure 6.5) as well as
        ’Medium Bushfire Hazard Area’ and’ High         -
                                                            Low Potential Acid Sulfate Areas’ within the
        Bushfire & Acid Sulfate Soils Overlay (refer to Figure 6.6). The Overall Outcomes relevant
        to the subject site are as follows:


            a) development in areas at risk from natural hazards is compatible with the nature of
                 the natural hazard;
            b)   the risk to people, property and the natural environment from natural hazards is
                 minimised;
            c) development does not result in a material increase in the extent or severity of
                 natural hazards; and
            d) for acid sulfate areas-the generation or release of acid and associated metal
                 contaminants into the environment is avoided


        Compliance
        Although the proposed facility is located within a Medium Bushfire Hazard area, the
        proposed use will not increase the risk or impact of this natural hazard since it is already
        cleared of vegetation where the foundations and earthworks are to follow engineering
        design standards and will not use equipment that significantly increases the risk of fire. In
        addition   no   buildings are proposed and the proposed development for a
        Telecommunication Facility is not considered to be a habitable use and will not result in an
        additional increase in the number of people living, working or congregating in the Bushfire
        Hazard Area.


        The facility is also identified as containing ’High Potential Acid Sulfate Soils’ between 0 m-
        5 m AHD. The proposal is for a 30 m monopole to be located at approximately 11 m AHD
        natural ground level. The proposed development complies with the overall outcomes of the
        Natural Hazards Overlay Code as it is not anticipated to involve excavation of more than
        100 m3 or filling of more than 500 m3 nor is excavation expected to be undertaken below 5
        m   AHD natural ground level. As such, the proposed          development will not result in the
        disturbance of acid sulfate soils and reflects the State Planning Policy 2/02 Planning and
        Managing Development involving Acid Sulfate Soils.

        The proposed facility will also be located outside of ’Landslide Hazard Areas’ as identified
        on the Natural Hazard: Landslide &       Flooding Overlay. Therefore the proposed use will not
        increase the risk or impact of this natural hazard       as it will   be constructed on level land
        which does not     slope    and is not considered to be unstable. Earthworks           required    to
        construct the facility will be minimal and will not result in any adverse impacts on land
    ,
I       stability.

        The   proposed facility is located within a ’Flood Hazard Area’ and on land ’Subject to
        minimum floor height’ as identified on the Natural Hazard: Landslide & Flooding Overlay.
        However the proposed telecommunication facility is not for a habitable use and has been
        sited and designed with raised equipment cabinets on elevated grillage to minimise the
        hazards associated with flooding. The proposed will not result in an increased risk of flood,
        bushfire or landslide for the area and reflects the State Planning Policy 1/03 Mitigating the
        Impacts of Flood, Bushfire and Landslide.




        NBN-4NBZ-4POM-5135    -
                                  Boreen Point                                                   Page 44
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0053.pdf · 117 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.