Development Application part 2 Report and Plans MCU13/0053
The original of this document is very large (117 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Compliance with the Infrastructure Uses Code
- ~ .
~ ...
’0~ ,
t
14.39 Effects of use
Location and siting 51.1 For Installations and 51.1 -
Complies.
030 The location and siting of Towers, where practicable, The proposed site for the
Infrastructure Uses- infrastructure is -
establishment of a
a) maximises accessibility for a) co-located with existing telecommunications facility (or
maintenance purposes; and Infrastructure Uses; or ’Tower’) is considered to be
b) does not disrupt access for b) located on or within an consistent with S1.1 as it will,
other purposes. existing building; although not directly co-
located within an existing
AND infrastructure use, be located
in an area which is
51.2 Easements for access to characterised
by similar such
Infrastructure Uses are granted including existing power
uses
to the Councilor the beneficiary stanchions and light poles.
of the easement to ensure
suitable access can be gained, 030 -
Complies.
where practicable. The facility is also consistent
with 030 as it will be
intentionally located within
private land for which there is
existing access available. After
the construction period, only
infrequent access would be
required during maintenance
periods or outages. The
existing access arrangements
are considered appropriate
and will not impact on any
adjoining land uses.
Separation from incompatible No solution provided. 031 -
Complies.
uses The subject site has been
031 Sufficient separation sited an appropriate
distance is provided between separation distance from
Infrastructure Uses and community sensitive locations
incompatible uses on the same and residential dwellings.
site and neighbouring premises
to maintain amenity for The proposed facility has been
neighbouring uses. appropriately sited on the
periphery of the township and
located as far away from
residential dwellings as possible
while still being capable of
providing service across the
township.
The subject site is setback
more than 1 km from the
Boreen Point Village and
240m from the closest
residential dwelling is and
only in proximity to three (3)
residential dwellings within a
500m radius.
Significant areas of mature
vegetation on the site will hel p
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.