Development Application part 2 Report and Plans MCU13/0053
The original of this document is very large (117 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn"". .-
,.- - -
,-
0~’ -;-.. ~.,... .. - r
~ ~
;
~ . ~
Council) will assist in blending
the facility into its
surroundings.
Safety and security 55.1 For Installations and 034 Complies. -
034 Infrastructure Uses are Towers-the use is fenced with The lease area for the
facility
secure and potential impacts security fencing; will be surrounded by a 2.4m
from vandalism are minimised.
high chain link fence.
AND
55.2 For other Infrastructure
Uses-no probable solution
Artificial lighting 56.1 Lighting associated with 035
Complies.
-
035 The generation of spill light the use isdesigned, The facility will not require the
by development, which gives installed, operated and installation of
lighting.
rise to annoyance, discomfort, maintained in accordance
distraction or a reduction in the with Section 3 of AS4282
ability to see essential The Control of the
information, is avoided. Obtrusive Effects of
Outdoor Lighting.
Mechanical plant and 57.1 Plant and equipment are- 57.1 Complies. -
equipment a) located more than 2m from The proposed facility will be
036 Mechanical plant and any property boundary; and located on the south eastern
equipment (including air b) screened by dense
property boundary and will not
conditioning equipment) vegetation or fencing (i.e. 1.5m achieve the 2m setback
are- wide vegetated buffer area);
specified in S7.1a.
a) positioned to minimise
adverse impacts on the OR
Notwithstanding this, the
amenity of any residential benefits from
property a
premises; 57.2 Plant and equipment are
vegetation buffer to the north,
b) designed and positioned to located within a building.
south and east which will
visually integrate with the the
effectively screen
building and roof design; and
equipment shelter from the
c) appropriately screened. residential
neighbouring
dwellings and Lake Flat Road.
This is considered to be
partially in accordance with
S7.1 b fully in accordance with
030.
Furthermore, noise and
vibration emissions associated
with the proposed facility will be
limited to the construction
phase. Noise generated during
the construction phase will be
of short duration and will be in
accordance with the standards
outlined in the Environmental
Protection Regulation 1998
and Environmental Protection
(Noise) Policy 1997.
Construction works will only
occur between the hours of
7.00am and 6.00pm.
There will be some low level
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.