Skip to the record
Beware of cheap imitations.

Council archive · source document

Structural Plans 20220173 - 10 Natasha Structural Issue 190123 · OPW22/0299

of 56

Plans and drawings: the text below has words only, no drawings.

Very large file (10.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

                                                                     NOTE:
                                                                     STARTER BARS AND HOLD
                                                                     DOWN BOLTS OMITTED
                                                                                                     PAD FOOTING                                                                                                                                                                                           REFER PLAN FOR
                                                                                                                                                                                                                                                                                                           SLAB REINFORCEMENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PLUMBING NOTES
                                                                     FOR CLARITY                                                                                                        STACKS PIPE                                                                                                                                                                             PIPE PLACEMENT
                                                                                                                                                                                                                           BLOCK WALL
                                                                                                                                                                                        REFER HYDRAULICS
                                                                                                                                                                                                                           REFER DRG S050 FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PLUMBING & DRAINAGE NOTES
                                                                                                                                                                                                                           DETAILS                                                                                                                                              ZONE            COMMENT
                                                                                                                                                                                                                                                                                                                                                                                A          ALLOWED - REFER TO                                                    1.    PLUMBING & DRAINAGE UNDER A SLAB SHALL BE AVOIDED WHERE PRACTICAL. PIPES MAY
                                                                                                                                                                                                                                                                                                                                                                                           THICKENING DETAIL 1.                                                        BE ENCASED IN CONCRETE OR IN RECESSES IN THE SLAB WHEN PROVIDED WITH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FLEXIBLE JOINTS AT THE EXTERIOR OF THE SLAB




                                                                                                                                                                                                                                                                                     EQ. EQ. EQ.
                                                                                                                                                                                                                                                                                                   ZONE A                                                                       B          ALLOWED




                                                                                                                                                                                                                                                                       FOOTING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 2.    PENETRATION OF THE EXTERNAL FOOTINGS BY PLUMBING SHALL BE AVOIDED IF




                                                                                                                                                                                                                                                                        DEPTH
                                                                                                                                                                                        2 LAYERS OF                      ISOLATION JOINT                                                           ZONE B                                                                                                                                                              POSSIBLE, BUT WHERE NECESSARY THE PIPES SHALL BE SLEEVED.
                                                                                                                                                                                                                                                                                                                                                                                C          ALLOWED - REFER TO




                                                                                                                                   REINF "D" TOP
                                                                                                                   REINF "A" BTM
                                                                                                                                                                                        ABLEFLEX                                                                                                                                                                                                                                                                 3.    JOINTS IN PLUMBING & DRAINAGE PIPES WITHIN 3m OF THE BUILDING SHALL
                                                                                                                                                                                                                                                                                                                                                                                           THICKENING DETAIL 2.




                                                                                                                                                   LENGTH
                                                                                                                                                                                                                                                                                                   ZONE C                                                                                                                                                              BE ARTICULATED & FLEXIBLE CONNECTIONS USED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 4.    CLOSED-CELL POLYURETHANE LAGGING, WITH A MINIMUM THICKNESS OF 40mm, SHALL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       BE USED AROUND ALL PLUMBING & DRAINAGE PENETRATIONS THROUGH THE EXTERNAL




                                                                                                                                                                        450 AT STACKS
                                                                                                                                                                                                                                                                       BLOCKOUT IN                                                                                                                                  PENETRATION OF THE                                 FOOTINGS.
                                                                                                                                                                                                                                                                                                                                       PENETRATION OF THE                                                           EDGE BEAM BY PLUMBING
                                                                                                                                                                                                                                                                       FOOTING TO BE                                                   EDGE BEAM BY PLUMBING                                                                                                     5.    PLUMBING TRENCHES SHALL BE SLOPED AWAY FROM THE BUILDING & SHALL BE
                                                                                                                                                                                                                                                                       APPROX 2 x PIPE DIA.                                                                                                                         SHALL BE SLEEVED                                   BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1.5m OF THE BUILDING. THE CLAY
                                                                                                                                                                                                                                                                                                                                       SHALL BE SLEEVED                                                             REFER NOTES                                        USED SHALL BE COMPACTED. WHERE PIPES PASS UNDER THE FOOTING, THE TRENCH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SHALL BE BACKFILLED WITH CLAY OR CONCRETE TO RESTRICT THE INGRESS OF WATER




                                                                                                                                                                                                                                                                      200 'D' EDGE




                                                                                                                                                                                                                                                                                                                                                                  'D' EDGE
                                                                                                                                                                                                                                                                      MAX BEAM




                                                                                                                                                                                                                                                                                                                                                                    BEAM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       UNDER THE FOOTING.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 6.    WHERE PIERS ARE USED TO SUPPORT A SLAB ON FILL, PLUMBING & DRAINAGE PIPES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FOUNDED WITHIN SUCH FILL, SHALL BE HUNG FROM THE SLAB MESH WITH
                                                                                   REINF "B" BTM                                                                                                                                                                                                   1
                                                                                                                                                                                                                                                                                                                                              'Z' BARS TO MATCH                                                                                                        NON-CORROSIVE STRAPS.
                                                                                                                                                                                                                                                                                                       1                                                                                                                                                         7.    WATER RUNOFF SHALL BE DRAINED AWAY FROM BUILDING DURING CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                                              BEAM REINF.
                                                                                   REINF "C" TOP                                                                                                                                      CONCRETE PAD FOOTING                                                                                                                                                                   BTM. REINFORCEMENT                  8.    ALL PLUMBING & DRAINAGE MUST COMPLY WITH THE LOCAL AUTHORITY & THE NATIONAL




                                                                                                                                                                                                                                                                                                                                                                                             75
                                                                                                                                                                                                                                      REFER ADJACENT SCHEDULE                                                        3 x D MIN                                                                    1000 MIN                   50 COVER                                  PLUMBING & DRAINAGE CODE AS3500-2003.
                                                                                       WIDTH                                                                                                                                          FOR DETAILS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PLUMBING & DRAINAGE TRENCHES
                                                                                                                                                                                                                                                                                     PIPE PENETRATION - ZONE A                                                               PIPE PENETRATION - ZONE C                                                           1.    PLUMBING & DRAINAGE TRENCHES SHALL BE LOCATED OUTSIDE THE INFLUENCE OF THE
                                                                     SCHEMATIC PAD FOOTING PLAN                                                                           TYPICAL PAD FOOTING AT PIPE LOCATIONS DETAIL                                                               BEAM THICKENING 1                                                                       BEAM THICKENING 2                                                                         FOOTINGS. THAT IS, TRENCH EXCAVATIONS SHALL NOT EXTEND BELOW A LINE DRAWN 30
                                                                     SCALE 1:20                                                                                                  SCALE 1:20                                                                                                                                                                                                                                                                            DEGREES TO THE HORIZONTAL FOR SAND, OR 45 DEGREES TO THE HORIZONTAL FOR SILT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       OR CLAY, FROM THE BOTTOM EDGE OF THE EDGE BEAMS OR FOOTINGS IN ACCORDANCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       WITH CLAUSE 6.3 OF AS2870-2011.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 2.    TRENCH BACKFILL SHALL BE COMPACTED IN ACCORDANCE WITH CLAUSE 5.5 OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       AS/NZS3500.3.2003 OR CLAUSE 7.2.13 OF AS/NZS3500.3.2003. SAND BEDDING & SURROUND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SHALL BE BLOCKED WITH A CLAY PLUG WHEREVER TRENCHES PASS UNDER THE EDGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       OF ANY SLAB.




                                                                                                          BLOCK WALL
                                                                                                          REFER DRG S050 FOR
                                                                                                          DETAILS                                                                                                                                                                                                                         FILL TO UNDERSIDE OF FOOTING
                                                                                                                                                                                                                                                                                                                                          WITH MASS CONCRETE. PIPE TO
                                                                                                          ISOLATION JOINT
                                                        200 MIN




                                                                                                                                                                                                                                                                                                                                          BE SLEEVED. REFER NOTES.




                                                                                                                                                                                                                                                                                                             MIN
                                                                                                                                                                                                                                                                                                             200
                                                                                                                               REINFORCEMENT 'D'

                                                                                                                                                                                                                                                                                                                                          DIMENSIONS OF ADDITIONAL CONCRETE ARE
                                                                                                                                                                                                                                                                                                                           630 MIN        MINIMUM. CONCRETE THICKENINGS AND
                                                                                                                                                                                                                                                                                                                                          FOOTINGS ARE TO BEAR ON TARGET NATURAL
                                                                                                                                                                                                                                                                                                                                          GROUND OR ENGINEERED FILL. FOOTINGS ARE
                                                                                                                               REINFORCEMENT 'C'                                                                                                                                                                                          NOT BE CAST ON BEDDING SAND FROM
                                                        DEPTH




                                                                                                                                                                                                                                                                                                                                          SERVICES TRENCHES.
                                                                                                                               REINFORCEMENT 'B'

                                                                                                                               REINFORCEMENT 'A'                                                                                                                EDGE/INTERNAL BEAM OVER SERVICE CONNECTION
                                                                                                                                                                                                                                                                SCALE 1:20



                                 15 MPa BLINDING AS REQUIRED TO                   WIDTH (x LENGTH)
                                 ACHIEVE 150 SOCKET INTO NATURAL
                                 MATERIAL WITH MINIMUM ALLOWABLE
                                 BEARING CAPACITY AS SHOWN IN
                                 FOUNDATION NOTES ON DRG. S001

                  PAD FOOTING SCHEDULE
                                                       DIMENSIONS                                          REINFORCEMENT
                  MARK                     LENGTH         WIDTH          DEPTH            'A'            'B'            'C'            'D'                                                                                                                                                                                                                                                                                         GRATED DRAIN AS PER HYD.
                                                                                                                                                                                                                                                                                                                                                                                                                                   ENGINEERS DETAILS
                  PF1                        1600          1600           450       N16-300 U-BARS N16-300 U-BARS N16-300 U-BARS N16-300 U-BARS
                  PF2                        1400          1400           450       N16-300 U-BARS N16-300 U-BARS N16-300 U-BARS N16-300 U-BARS                                                                                                                                                                                                                                                                                    1 N12 TRIMMER
                  PF3                        1800           700           450       N16-300 U-BARS N16-300 U-BARS N16-300 U-BARS N16-300 U-BARS                                                                                                                                                                                                                                            1 N12 TRIMMER                           SLAB MESH
                                                                                                                                                                                                                   400          1N12 CONTINUOUS TRIMMER
                                                                                                                                                                                                                                                                                                                                     1 N12                                                                                         REFER PLAN.
                                                                                                                                                                                                                                LAP AS REQUIRED
                                                                                                                                                                                                                                                                                                                                     CONTINUOUS
                                                       TYPICAL PAD FOOTING DETAIL                                                                                                                                                  50 MAX. STEP                                                                                      TRIMMER                                        FALL                                                   FALL
                                                        SCALE 1:20




                                                                                                                                                                                                                                                                                                                                        200




                                                                                                                                                                                                                                                                                                                                                                                                                                                                MIN.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                150
                                                                                                                                                                                                                                                                                                                     250
                                                                                                                                                                                                                         LAP MESH 300 MIN.
                                                                                                                                                                                                                                                                                                                                                                                                             200                   N12 AT 400 'U' BARS
                                                                                                                                                                                                                         DASHED LINE DENOTES                                                                                                                                                                 TYP.                  LAP 450 WITH MESH
                                                                                                                                                                                                                         VISQUEEN MEMBRANE                                                                                                                                                                                         75 BOTTOM COVER
                                                                                                                                                                                                                                                                                                                                                                                                                                   3 N12


                                                                                                                                                                                                  TYPICAL SLAB SETDOWN 50mm HIGH MAX.                                                TYPICAL EDGE THICKENING                                                                           TYPICAL GRATED DRAIN DETAIL
                                                                                                                                                                                                                                                                                                                                                                                       SCALE 1:20
                                                                                                                                                                                                      SCALE 1:20
                                                                                                                                                                                                                                                                                     DETAIL - ET1
                                                                                                                                                                                                                                                                                     SCALE 1:20




      200mm        0          200    400   600   800
 1 :20


                                                                                                                                                                                                                                                                                                                                                                                                                    Client                                                  Status                                   Title
                                                                                                                                                                                                                                                                                                                                                                                                                     MARK BAIN                                                                                       TYPICAL SLAB AND FOOTING DETAILS - SHEET 3
                                                                                                                                                                                                                                                                                                                                                                                                                    Drawn By                      Designed By               Approved By
                                                                                                                                                                                                                                                                                                                                                                                                                      Author                        Designer                  Approver
                                                                                                                                                                                                                                                                                                                                                                                                                    Project No.                   Discipline                Scale

                                                                                                                                                                                                                                                                                                                                                    [email protected]                                          20220173                                                 1 : 20                  (at A1)

                                                                                                                                                                                                                                                                                                                                                                                                                    Project Name
                                                                                                                                                                                                                                                                                                                                                    37 MARY ST NOOSAVILLE, QLD                                                                                                                                       Drawing No.                                      Revision
1        04.11.22 ISSUE FOR INFORMATION                                                                                                                     JAL   JO                                                                                                                                                                                                                                                 NOOSA VILLAS
                                                                                                                                                                                                                                                                                                                                                    07 5211 1003                                                                                                                                                      S022                                             1
Rev        Date        Description                                                                                                                          By    Chk                                                                                                                                                                                                                                                10 NATASHA AVE & 24 KATHARINA ST, NOOSA HEADS QLD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        FULL SIZE ON ORIGINAL    0           10    20   30   40   50   60   70   80        90    100 mm

Used in these records

About this file

File size
10.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Structural Plans 20220173 - 10 Natasha Structural Issue 190123.pdf · 10.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.