2016/17 – A Year in Review
Corporate Plan Theme 1: The Noosa Environment
“Our environment is protected, enhanced and valued by the community”
Key achievements as we work towards our long term goal include:

   Council committed to a three-year agreement to            Stage 2 of the Munna Point foreshore revitalisation
    remain part of the Healthy Waterways Program.              project has been implemented with the aim of
   Council reviewed its management approach to the            reducing environmental damage to Munna Point
    Noosa River and has committed to refresh and               from erosion. While it is too early to tell whether the
    rewrite the Noosa River Plan with an expanded              geo-textile bags approach has been successful,
    focus on river catchment areas. The revised Noosa          early indications are positive.
    River Plan is currently being drafted.                    In December 2016, Council adopted the Noosa
   Council adopted the Noosa Shire Koala                      Biodiversity Assessment Report. This report is an
    Conservation Plan in July 2016. A further report to        important input into our Council’s new Planning
    Council on actions to implement the Plan will be           Scheme and also acts as a benchmark for future
    provided in due course as requested during the             assessment of biodiversity across the Shire. The
    recent budget meetings.                                    report will also be useful as part of the 10 year
                                                               renewal application for the Noosa Biosphere
   Council undertook an audit of waste water facilities       Reserve.
    in Cooran. Cooran is not serviced by a sewerage
    system and accordingly, residential properties use        In one of the largest contracts our Council has
    on site waste water facilities and an audit was            entered into, Council awarded a new waste
    undertaken to determine the level of compliance            management contract to Cleanaway for the period
    from an environmental protection and health                2017 - 2024 at an approximate cost of $46 million.
    perspective.                                               This contract covers the collection, disposal and
                                                               recycling operations for the Eumundi Road Waste
   Council adopted the Noosa Parklands Park                   Recovery Centre and includes the introduction of a
    Management Plan following significant consultation         green waste recycling bin which will reduce green
    with local residents. Staff are currently working to       waste being buried in the landfill, thus significantly
    develop a suite of other management plans for              reducing methane gas.
    other bushland reserve areas within the Shire.
    Those plans are substantially complete.                   Council was successful in receiving a grant
                                                               (managed by the Local Government Association of
   Council made a submission to the State                     Queensland) for the development of a Coastal
    government on the green paper on Fisheries                 Hazard Adaption Plan. A Project Officer has been
    Management Reform. Council has also made a                 appointed and work is currently underway to
    number of direct representations to the Minister on        develop both a Coastal Hazard Adaption Plan (year
    this topic.                                                one) and a Climate Change Adaption Plan (year
   Council has adopted its Zero Emissions Strategy            two).
    focused on eliminating our organisation’s emissions       Council entered into a Memorandum of
    by 2026. This was a major initiative of Mayor              Understanding with Healthy Waterways and
    Wellington and work has been undertaken in                 Catchments for the ongoing “Land for Wildlife”
    2016/17 to establish the baseline level of emissions       program. This program helps support property
    (which have been recently re-calculated). A major          owners who care for their land to encourage
    report has just been finalised by ERM in relation to       environmental protections.
    the energy use of 9 of Council’s largest energy
    producing sites to identify which energy efficiency       Council undertook an environmental clean-up of
    projects should be undertaken in the first instance        asbestos which was dumped illegally on Walter Hay
    to both reduce costs and emissions.                        Drive.
   Council adopted a new street sweeping contract            A systematic inspection of our industrial areas has
    (using the firm Environmental Waste Water                  been undertaken to identify any issues with run-off
    Catchment Services) which has resulted in an               etc to local waterways. The detailed report has
    increased length of roads being serviced by the            identified some key areas for improvement and the
    street sweeper. This reduces the amount of rubbish         Council will be considering the option of introducing
    going into drains and waterways.                           a licencing regime under our local laws.

Log in to download the original (2016-17 A Year in Review(PDF, 615KB).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 8 sections

Section 2

   The Waste Reduction and Recycling Plan has been
    rolled out in 2016/17. This included significant
    media coverage and school education sessions.
   Council has entered into a contract for the purchase
    of Johns Landing (approximately 50 ha) in order to
    undertake the long-term protection of important
    environmental land on the Noosa River. Council is
    also working with the current owner of the property
    to assist with the transition to alternative housing for
    those residents living on the current site.
   Council has facilitated the approval processes for a
    project being funded by the Noosa Biosphere
    Reserve Foundation to re-establish oyster reefs in
    the Noosa River. This has entailed obtaining both
    town planning approval from Council and
    environmental approvals from the State
    government. In addition, Council also provided
    $250,000 to the Noosa Biosphere Reserve
    Foundation for projects that advance the purpose of
    the Noosa Biosphere Reserve.
   Council has addressed a range of significant
    planning and environment applications during the
    last 12 months. As can be seen from the table of
    statistics at the end of this report, Council approved
    98.7% of planning applications. Some of the more
    interesting applications considered by Council
    during 2016/17 included:
    o Village Bicycle
    o Proposal to extend a deck at the Noosa Marina
    o Tewantin RSL
    o Service Station at Taylor Court, Cooroy
    o Proposed Elanda Point jetty
    o 90 Beach Road, Noosa North Shore
    o A number of microbreweries and of course, a
         chocolate factory!
   Council had considerable success in the Planning
    and Environment Court with a significant victory for
    our Planning Scheme in the Noosa Civic case. The
    court supported Council’s position that it was
    inappropriate under the Planning Scheme to
    expand retail operations on that site. During
    2016/17, the appellant in the poultry farm case also
    withdrew their appeal as did the appellant in the
    Service Station Centre appeal at the Good
    Shepherd Lutheran School site on Eumundi Road.
   In an environmental first, Council has trialled a
    range of new environmentally friendly asphalt
    processes in conjunction with our contractor. This
    has included the introduction of recycled printer
    cartridges into the asphalt mix and the use of
    different temperatures to undertake the planning
    process. We have also trialled different
    combinations of recyclable material including
    shredded car tyres and recycled glass. Further
    details on this interesting initiative together with the
    environmental benefits are listed below.

Section 3

Corporate Plan Theme 2: The Noosa Community
“Our community is connected, safe and happy and able to meet their potential”
Key achievements as we work towards our long term goal include:

   Council adopted a three-year implementation plan          Council introduced a community support scheme
    for the Noosa Social Strategy. This includes an            for those residents living in the vicinity of Wallace
    annual update to Council on progress for                   Park who were directly affected by large numbers
    implementation of the Noosa Social Strategy.               of flying foxes that came to Wallace Park on an
    Included within the Social Strategy is the                 intermittent basis. The scheme included the
    establishment of the Noosa Community Round                 provision of cleaning materials, car covers and
    Table which has been successfully operating to             other tangible support materials to reduce the
    assist with the transition process at Johns Landing.       impact on local residents. Council also employed a
   There has been significant progress on the backlog         project officer for a period during 2016/17 to help
    of community lease renewals. A separate report to          roll out the support items.
    Council has identified the degree of progress that        Council undertook a sports field audit to provide
    has been made in the last 12 months to reduce the          additional assistance to sporting clubs who have
    number of outstanding community leases.                    the responsibility of maintaining their sporting fields.
   Staff have been working to develop a Sport and             Council agreed to provide membership to the
    Recreation Plan. This has included initial                 Sports Turf Association of Queensland to 12
    community engagement and a draft Plan has been             sporting clubs to assist in increasing expertise
    developed in preparation for a formal round of             within the clubs on field and turf maintenance.
    community consultation.                                   Council has commenced a process to review
   Council has entered into a three-year agreement            options for the future use of the Noosaville
    with the Cooroy Futures Group Inc for the operation        foreshore. This included an extensive community
    of the Cooroy Butter Factory Arts Centre. This             engagement process which will be completed in
    agreement was entered into after a trial                   2017.
    management period following an extensive                  Council has reviewed and updated its Community
    community engagement process on the future of              Engagement Policy. Significant community
    the Cooroy Butter Factory.                                 engagement projects in 2016/17 included:
   Council has undertaken two community Council               o Cooroy Memorial Hall
    meetings during 2016/17. In October 2016, we held          o Sunshine Beach Skate Park
    a Council meeting at Cooroy and in April 2017, we
                                                               o Digital Hub, Peregian Beach
    held a Council meeting at Boreen Point.
                                                               o Botanic Gardens Masterplan
   Council commenced the development of a Noosa
    Arts, Culture and Heritage Plan. A Consultative            o Noosa Planning Scheme
    Committee has been established and work is well            o Noosa Transport Strategy
    advanced on the development of that Plan.                  o Waste Reduction and Recycling Plan
   Council undertook extensive community                      o Corporate Plan
    engagement with the Cooroy community regarding
                                                              Council has accepted a contract for the restoration
    the future of the Cooroy Community Hall. Council
                                                               and upgrade of the Sunshine Beach Skate park at a
    agreed to accept trusteeship of the Deed of Grant
                                                               cost of $380,000. This is an important facility for the
    in Trust and supported the establishment of the
                                                               younger demographic in our Shire.
    Cooroy Community Hall Association Inc. A lease is
    being provided to the Association in order that they      Council has undertaken numerous Library and
    can manage the Hall. Council has also agreed to            Gallery programs to support our community. Our
    fund 50% of the restoration costs (capped) with the        Library Services have physically issued over
    community funding the remaining 50%. This has              570,000 items to our community during the last 12
    been an excellent outcome for the Cooroy                   months.
    community.                                                After considerable work with the local community
   Council extended the lifeguard services agreement          including United Synergies and local Rotary Clubs,
    for a five-year term. This agreement enables our           Tait Duke Cottage was restored and open for
    community and visitors to safely use our beaches           community use in June 2017. This milestone was
    with a high level of safety based on our lifeguard         significant after many years of work to identify an
    services.                                                  appropriate site and working in partnership with the
                                                               local community to restore the building and make it
                                                               available for ongoing community use.

Section 4

   To encourage community interaction, Council has        Council continued to provide its community grant
    installed chalkboard walls as part of the               program supporting our community groups. During
    International “Before I Die” wall movement. This        2016/17, we provided over $810,000 in grants to
    has been successful (particularly at Cooroy) with       local community groups to support projects,
    one of the walls recently being transferred from        acquisition of equipment or events. Council staff
    Noosa Junction to Peregian Beach.                       also facilitated a number of evening information
                                                            sessions for community organisations to help
                                                            improve their governance and grant writing skills.

Section 5

Corporate Plan Theme 3: The Noosa Economy
“Our economy is diverse and resilient”
Key achievements as we work towards our long term goal include:

   The design of the Peregian Beach Digital Hub was            Council continued to work closely with Tourism
    completed and town planning approval obtained.               Noosa to develop the Noosa Tourism market. In
    Council was successful in obtaining $1 million of            particular, Council provided significant input into the
    funding from the State Government. Associated                development of the Noosa Tourism Strategy 2017 -
    road works and parking in Rufous Street have                 2022 adopted by the Tourism Noosa Board. This
    substantially been completed and preparatory                 strategy included a focus on “value over volume” in
    works have commenced on the Digital Hub building.            relation to tourism so that the focus is on yield per
    Tenders have been called for the management of               visitor rather than simply more visitor numbers.
    the Digital Hub component of the building and in            Council continued to work closely with Regional
    addition, Council has submitted an application to            Development Australia (Sunshine Coast) on a
    the Commonwealth under the Building Better                   range of projects including a successful
    Regions Fund for additional work associated with             entrepreneurship program.
    the project.
                                                                Council undertook an audit of footpath trading
   Council appointed an Economic Development                    across the shire and also provided information to
    Manager who has brought significant experience               the operators while the audit was being undertaken.
    and focus to our economic development programs.
                                                                Council worked with the private sector to assist with
   Council undertook a detailed review of the proposal          the establishment of Innovative Noosa. This is part
    from CCIQ Noosa for a Noosa Convention and                   of a regional program that attracted significant
    Cultural Centre. Council recognised that such a              funding from Advance Queensland to develop
    proposal could have potential economic benefit but           innovation on the Sunshine Coast.
    identified that the cost of construction and operation
    should not be borne by Noosa ratepayers but                 Council continues to manage our Holiday Parks
    rather, Council expressed a willingness to consider          including awarding a new three-year contract for the
    financial options driven by the market.                      management of the Noosa River Holiday Park.
                                                                 During 2016/17, Council also commenced a
   Council undertook its first Economic Development             process to redevelop the Noosa North Shore
    Grants Program providing financial support for               Beachfront Campground including the development
    programs that will support the outcomes of the               of concept designs and sorting out tenure issues.
    Local Economic Plan.
                                                                Council undertook its three yearly review of
   Council entered into a Memorandum of                         commercial high use permits and following a tender
    Understanding with the Small Business Solutions              process, awarded new permits for the operation of
    section of TAFE Queensland to provide support for            commercial activities on Council controlled land in
    training and development of local small businesses.          the Hastings Street precinct.

Section 6

Corporate Plan Theme 4: Long term planning for Noosa Shire
“Noosa Shire is well managed and sustainable”
Key achievements as we work towards our long term goal include:

   Council undertook significant work on the                   Council has adopted the Noosa Local Disaster
    development of the new Planning Scheme during                Management Plan which guides our responses to
    2016/17. Council adopted the New Noosa Plan                  natural disasters. Council has also undertaken
    Discussion Paper for the purposes of public                  considerable work in developing our response to
    consultation and undertook an extensive                      natural disasters including undertaking disaster
    community engagement process to seek feedback.               management exercises to train our staff. This was
    Council also finalised a range of studies to support         put to the test with the arrival of the remnants of
    the development of the new Planning Scheme                   Cyclone Debbie in February 2017. Our
    including:                                                   management of that response was good and our
    o Resources and Minerals Planning Study                      Local Disaster Management Plan was able to deal
                                                                 with that scenario. Council was also successful in
    o Study into Agriculture and Agricultural Land in
                                                                 obtaining State funding to install new flood alert
         Noosa Shire
                                                                 stations at a cost of $206,000.
    o On-Site Effluent Disposal Noosa Shire Study
                                                                Council adopted a Transport Policy and Transport
    o Housing Needs Assessment                                   Strategy following extensive community
   Council was able to provide significant input into the       consultation. This was one of the signature long-
    ongoing development of the draft South-East                  term pieces of planning for our community
    Queensland Regional Plan which will achieve a                undertaken in 2016/17. There were two rounds of
    good outcome for the Noosa community.                        community consultation including targeted
   Council undertook a significant review of our                consultation with key stakeholders. One of the
    infrastructure plans to enable us to meet new                challenges for 2017/18 is the implementation of that
    legislative requirements for the imposition of               Strategy. Also during 2016/17, Council successfully
    contributions from developers towards the cost of            delivered its Christmas and Easter free holiday bus
    infrastructure.                                              program.
   Council adopted its new Corporate Plan which will           Council adopted an Asset Management Plan
    guide key corporate decision making for the next 20          Roadmap in 2016/17. The roadmap sets out the
    years. The Corporate Plan was developed following            priorities for developing more robust long-term
    a series of Councillor workshops analysing future            asset management plans and ensuring that asset
    trends and developed a new vision – “Noosa Shire -           management becomes more central to our decision
    different by nature”.                                        making processes. Converting this roadmap into
                                                                 action is also one of the challenges for 2017/18.

Section 7

Corporate Plan Theme 5: Excellence as a Council
“The Noosa Shire community is proud of its Council”
Key achievements as we work towards our long term goal include:

   Although our end of year financial statements have         Our Noosa Aquatic Centre, Noosa Leisure Centre
    not yet been finalised, it is clear that we have had        and The J all had outstanding years. The Noosa
    another successful financial year. Revenues were            Leisure Centre had its highest ever annual
    above budget, expenses were below budget, debt              attendance, The J had its highest ever revenue and
    levels are lower than at the beginning of the               the Noosa Aquatic Centre had its strongest ever
    financial year and cash reserves are higher than at         financial performance. Reports will be provided to
    the beginning of the financial year. At the end of          Council in due course in relation to the annual
    2016/17, Council adopted its budget for the 2017/18         performance of our community facilities.
    financial year with a 2% general rate increase.            Council has recently undertaken its first external
   Council has successfully achieved another                   customer service survey. The survey was
    unmodified audit from the Queensland Audit Office           undertaken by Market Facts to enable us to
    with the 2015/16 financial statements being signed          benchmark with other Queensland local
    off by the QAO in late 2016.                                governments (LGAQ also use this firm to undertake
   Behind the scenes, the Audit and Risk Committee             state wide customer service surveys). A report will
    has continued to add value to our compliance and            be provided separately to Council in relation to this
    performance for governance and finance. This has            matter but our benchmark scores are above state
    included an oversight of our strategic risks, review        averages.
    of key governance and financial policies, review of        Council continued to undertake a series of service
    organisational KPI’s, development of Business               reviews looking in detail at operations to find ways
    Continuity Planning etc. Our two external members           in which we can be more efficient in delivering
    of the Audit and Risk Committee in particular have          services. This included areas such as the Noosa
    added significantly to our overall governance               Leisure Centre, Environmental Health, and Building
    practices. Although not high profile, this Committee        and Plumbing Services. Following these reviews,
    plays an important role in making sure that Council         Council adopted additional staff resources in some
    “dots the i’s and crosses the t’s” both in governance       parts of the organisation to ensure that appropriate
    and in the management of risk. Council’s Internal           service levels can be delivered.
    Audit Program included internal audits on                  The transformation of our Workplace Health and
    Procurement and Council investments.                        Safety performance has continued. Significant
   Council commenced a review of our organisational            progress has been made in relation to our
    structure at the end of 2016 with the new structure         documentation, processes and practices for
    being adopted in March 2017. Following                      Workplace Health and Safety. Based on the LGW
    considerable internal consultation, the Planning and        Workcover Performance statistics for category D
    Infrastructure Department was split in two with a           Councils we have transitioned from one of the worst
    new Environment and Sustainable Development                 performing local governments of our size to one of
    Department and a new Infrastructure Services                the best performing local governments of our size
    Department being created. Also during 2016/17,              for Lost Time Frequency and Lost Time Injury.
    Council added additional staff resources to our            A Digital Strategy has been developed for
    Infrastructure Design and Delivery Branch and               management to focus on opportunities available
    Asset Management Branch to enable them to                   with emerging digital technology. This strategy
    deliver expected outcomes.                                  focuses particularly on improving our organisational
   Our enterprise risk management has been further             efficiency using digital technology as well as
    developed with risk management practices being              improving our interface to our community. During
    further embedded into Council operations. Council           the year, more mobile technology was rolled out to
    was recognised by Local Government Mutual for               our external workforce.
    our risk management practices. The Leadership              We commenced negotiations for a Noosa Council
    Team reviews strategic risks on a quarterly basis           Certified Agreement. Given the recent changes to
    and operational risk registers have been                    industrial relations legislation and awards, it is only
    established at a Departmental level. Our                    now become possible for Council to begin to
    comprehensive Business Continuity Plans are all             develop our own Noosa Council Certified
    but complete and will be tested in early 2017/18.           Agreement rather than continuing to be bound by
                                                                the former Sunshine Coast Council Certified
                                                                Agreements. These negotiations with unions will
                                                                continue into the 2017/18 financial year.

Section 8

   We transitioned our ICT systems to the latest             Although commencing in the 2015/16 financial year,
    version of the Cloud which provided enhanced               the process of bringing our new Council up to
    security and stability for our systems which is            speed with the myriad of Council issues was a pre-
    important given the number of cyber-attacks                dominant theme in the first few months of the
    occurring at the moment. We have also continued            2016/17 financial year. This involved a significant
    to roll out our ICT strategy to enhance our system         number of workshops and presentations to
    capabilities.                                              Councillors to brief them on key strategies, projects
   We undertook significant training and development          and priorities. This was quite a seamless process
    for leadership capabilities within the organisation.       resulting in good governance and good decision-
    This included the continuation of the Leadership           making processes.
    Practices Inventory (LPI) program for our senior
    management staff (approximately 30 staff leaders).
    While undertaking a significant amount of
    professional development training for our staff, we
    still have more to do to successfully implement an
    annual staff development program.

Section 9

Some Statistics
To put the level of “day to day” activity into perspective, the following statistics are provided:

 Services Provided in 2016/17                                            Data
 Number of visitors to the Noosa Aquatic Centre                          245,208
 Number of visitors to The J                                             79,740
 Number of visitors to the Noosa Leisure Centre                          101,877
 Number of clients serviced at Noosa Community Support                   2,915 clients
                                                                         (39,355 services delivered)
 Number of physical items issued by our Libraries                        572,435
 Number of bins collected                                                General Waste - 1,846,152
                                                                         Recycling - 1,206,385
                                                                         Green waste - 213,779
 Number of calls answered by our customer service team                   65,713
 Number of development applications and percentage approved              444 applications
                                                                         98.7% approved
                                                                         (including tree removal applications)
 Number of rate notices issued                                           62,262
 Length of road resurfaced                                               Asphalt – 10km
                                                                         Spray sealing – 23km
                                                                         Total – 33km
 Length of road serviced by our street sweeper                           11,480km

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.