From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
6.1. Groundwater — Sub-Artesian Bore Groundwater resource potential was assessed through the drilling of a number of test bores and the completion of the bores as groundwater monitoring facilities. Groundwater quality was assessed through laboratory testing of water samples taken from the monitoring bores. Following an initial review of topographic mapping and aerial photography, the elevated “ Landsborough Sandstone outcrop covering a significant portion of the property was identified as the most prospective groundwater target. Groundwater Coffey and Water Studies undertook a program of field investigations over the period 21“ to 25" July 2003. Three (3) test bores (GW1, GW2 and G3) were drilled within the area of elevated bedrock on the property by rotary wash boring techniques using a Jacro 200 drill rig. All three test holes were completed as groundwater monitoring bores, and the approximate locations of the bores are given on Figure 1. An approximate assessment of groundwater yield was obtained by noting the ability of bores to sustain pumping during purging for groundwater sampling. Groundwater samples were collected and submitted to a NATA registered laboratory (Australian Laboratory Services (ALS), Brisbane) to be analysed for a range of chemical parameters. Construction of Groundwater Monitoring Bores Groundwaier monitoring boreholes were drilled to intersect the shallowest aquifer on the site. All groundwater monitoring bores were constructed with 50mm internal diameter, Class 18 machine slotted PVC pipe, with a sand filter pack installed around the screened section and a bentonite seal between the screened section and the ground surface. The wells were completed approximately one metre above the ground with PVC end caps. Groundwater Sampling Groundwater sampling was carried out on 23 July 2003. The groundwater sampling procedure is summarised below. © The groundwater level in the weil and depth of well was measured. : . © The well was purged prior to sampling, using a 12V whale pump and dedicated Waterra tubing. ‘ © Samples were collected in containers provided by a NATA accredited analytical testing laboratory. The samples were stored on ice and forwarded to ALS in Brisbane for analysis, under the standard Coffey Chain of Custody documentation. The samples for metals analysis were field filtered using a 0.45-micron filter attached to 10mL syringes. e All laboratory analytical methods employed were based on the NSW EPA and USEPA standard methods. Groundwater Results Pa 6 piece The three groundwaier exploration bores GW1, GW2 and GW3 were drilled fo depths of 10.3m, 10.0m and 11.0m respectively, and terminated in fresh sandstone of the Landsborough Sandstone Formation. All three groundwater exploration bores were terminated due to slow bit penetration in the relatively hard, fresh sandstone. There were no obvious fractured zones encountered in the drilling. PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003 LA7296-03\Report\FINAL REPORT - 18Sept03.dac Commercial in Confidence Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.127.tifRelated documentApplication case desk ↗
About this file
- File size
- 64 KB (small file)
- File type
- TIF
No other editions are linked here.