Appendix C - site and soild evaluation for on site effluent.pdf
Report Limitations: The log sections in this report should be representative of the soil conditions over this site, however, soil conditions can change dramatically over short distances. The person responsible for installing the system must observe the soil profile and ensure it matches the soil profiles recorded in this report. If soil conditions differ from those recorded by us, we must be immediately notified so that further investigation can be carried out and the system design modified if necessary. This work may involve additional fees and costs. This company will not accept any responsibility for additional costs to any party as a result of soil variations. In writing this report, we have also considered all the information supplied to us by our client. Should the client or his agent have omitted to supply us with relevant information, our report may be irrelevant and/or inappropriate. We do not take responsibility for the consequences in such cases and we will make an additional charge if as a result, more testing or rewriting of this report is necessary. The operation of the disposal system is dependent upon the hydraulic load, the type of the material entering the system and the maintenance of the system. As these factors are beyond the control of this company we do not take any responsibility for the long term adequacy of any disposal system constructed on this site or the consequences of its malfunction. WADE HOLMES – QBCC 1120066 for and on behalf of: AUSTRALIAN SOIL INVESTIGATIONS – QBCC 15072110 AUSTRALIAN SOIL INVESTIGATIONS 7 ASI Ref: 240038 (A)
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix C - site and soild evaluation for on site effluent.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.