Original source · versioned page text
202304 20 Kauri Street - DA REV.A 08.08.23
Very large file (11.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
FC1 15.00° RS1 AX1 GU FC1 15.00°
LEGEND
RS1
AC Airconditioning condensor unit to Builder Spec
AX1 JH 'Axon' Cladding - Paint Finish. Resene Half Iron
BAL01 Toughed glass balustrade with powdercoated top rail &
+115.965 = CEILING GU GU +115.515 = CEILING mullions
GU +115.515 = WINDOW / DOOR HEAD RBW1 +115.065 = WINDOW / DOOR HEAD BAL02 Powdercoated aluminium AS1428.1 compliant handrail,
SHS profile. Colorbond Paperbark
DP1 DP1
BFC Broom Finish Concrete Slab
DP1 SCN01
SCN01 BHD Bulkhead
BAL01 BRR Floor Bearer
RBW1 FC1 BN Basin - refer to Plumbing Fittings Schedule
+113.415 = FINISHED FLOOR LEVEL AX1 +112.965 = FINISHED FLOOR LEVEL CL Powdercoated aluminium wall mounted folding clothes
+112.575 = CEILING line
+113.025 = CEILING TF2
CLG Ceiling - Refer Reflected Ceiling Plan.
+112.125 = CEILING CT Cooktop - refer to appliances schedule
+112.425 = CEILING
RBW1 RBW1 EA.CONC Exposed agregate concrete
TF2 DP1 D.# Door Number. Refer Door Schedule.
BAL01 TF1 DP1 PVC Downpipe - Paint Finish - Colorbond Shale Grey
P1
DR Clothes dryer. Refer to Appliance Schedule.
AX1 F Fridge. Refer to Appliance Schedule
+110.325 = FINISHED FLOOR LEVEL +109.875 = FINISHED FLOOR LEVEL FC1 6mm fibre cement cladding with vertical timber cover
+110.075 = PAD HEIGHT +109.625 = PAD HEIGHT strips installed as per Architectural Elevations - Paint
Finish. Resene Rice Cake
FC2 JH 'Easy Lap' Cladding. Resene Rice Cake
FT1 Refer Fixtures Schedule.
Natural Ground Line P1 AX1 RBW1 AC CL RBW1 FT2 Refer Fixtures Schedule.
FT3 Refer Fixtures Schedule.
(NGL)
FG Fixed glass- refer to Window Schedule.
FL Flashing
BUILDING 3 - EAST ELEVATION BUILDING 3 - WEST ELEVATION FLJ
FSC
Floor Joist
Fascia
1:100 1:100 FWG Floor Waste Gully
G# Gate & number - refer to door schedule.
WB1 RS1 FC1 GU WB1 RS1 FC1 WB1 GU FC2 RS1 FC1 GU Colorbond Half Round Gutter, Shale Grey
17.00° 17.00°
GD Drain with SS grate
WB1 GU RS1 FC2 FC1
HC Hose Cock
RS1 GU WB1 HR Handrail - timber with powdercoated metal wall brackets.
17.00° GU RS1 FC2 17.00°
Refer to schedules
HWU# Hot water unit
RS1
+114.775 Ceiling Height INS Insulation
GU +114.325 Window & Door Head
J.## Joinery Type #
LIN Linen cupboard - refer to Joinery Drawings
+113.875 Ceiling Height GU
+114.775 Ceiling Height M Shower mixer
+113.425 Window / Door Head MV Mechanical room ventilator
DP1 +114.325 Window & Door Head
NGL Natural Ground Line - Refer to Natural Ground Survey
FC1 RS1 +113.875 Ceiling Height ORS Open Riser stair
DP1 DP1 +113.425 Window / Door Head P# Post/ column.
RS1 +112.225 Finished Floor Level PB 10mm Plasterboard with paint finish - Resene 'Rice Cake'
WB1
GU GU +111.835 Ceiling Height PG1 Timber framed open pergola to detail. Paint finish
RS1 FC1
Resene 'Rice Cake'
+111.325 Finished Floor Level P1 +111.235 Window & Door Head +112.225 Finished Floor Level DP1 PU Purlin
+110.935 Ceiling Height DP1 +111.835 Ceiling Height PV# Concrete Pavers, lightly exposed agregate
R Tiled recess in tiled wall - Refer joinery detail
+110.335 Window / Door Head +111.235 Window & Door Head +111.325 Finished Floor Level
RBW1 Rendered 190 series blockwork. White
CL BAL02 +110.935 Ceiling Height
FC1 RBW2 Rendered 290 series blockwork letterbox enclosure. White
RS1 Colorbond Custom Orb Roof Sheeting, 'Shale Grey'
CL +110.335 Window / Door Head
+109.135 Finished Floor Level S Sink
P1 +108.885 Pad Height SE# Shot Edge hardwood timber decking
AC BAL02 AC TF2 SC Structural Column Concealed within wall
+108.235 Finished Floor Level +109.135 Finished Floor Level SCN01 Timber lattice screen to detail. Colorbond 'Paperbark'
+107.985 Pad Height +108.885 Pad Height SHR Shower Head
SF Structural Footing
+108.235 Finished Floor Level T# Tiles- refer to Specification
WB1 FC1 Natural WB1 FC1 WB1 FC1 AC TF2 +107.985 Pad Height
TF1 Painted vertical shadow box timber paling fence, to detail
Ground Line TF2 Standard timber paling fence to Builder Spec
(NGL) T&G# Tongue & Groove Hardwood Flooring
TRF Turf
BUILDING 4 - EAST ELEVATION Natural Ground Line P1 RBW1 DP1 FC1 TF1 AC RBW1 P1 DP1 TOW
WB1
Top of Wall
JH Linea Weatherboard Cladding with mitered corners,
1:100 (NGL)
150mm cover. Paint finish Resene 'Rice Cake'
WC Toilet
BUILDING 4 - WEST ELEVATION WM Washing Machine
1:100 PBWA Plasterboard wet area
WPM Waterproof membrane
W.#.## Window Number
AX1 RS1 Trusses - by others RS1 AX1 8m height limit GU RS1 Trusses - by others RS1
15.00°
GU
+116.115 Ceiling Height 15.00° 17.00°
+115.665 Ceiling Height
+115.515 Window / Door Head
+115.065 Window & Door Head
+114.775 Ceiling Height
2,700
2,700
BAL01 +114.325 Window & Door Head
2,700
LIVING / LIVING / LIVING /
DINING DINING DINING
DECK DECK
2,550
+113.415 Finished Floor Level
DECK
+113.025 Ceiling Height +112.965 Finished Floor Level
+112.575 Ceiling Height
+112.425 Window / Door Head BED 2 BATHR'M BED 1 +112.225 Finished Floor Level
TF1 +111.975 Window & Door Head +111.835 Ceiling Height
2,700
2,850
BED 1 BED 1 BED 1 +111.235 Window & Door Head
2,700
TERRACE UNIT 5 UNIT 6 UNIT 7 TERRACE UNIT 8
2,700
+110.325 Finished Floor Level
+110.075 Pad Height +110.175 +110.105
+109.875 FFL LIVING /
+109.625 Pad
DINING
+109.135 Finished Floor Level
+108.885 Pad Height
AX1 AX1 Natural Ground Line AX1 TF2 RBW1 RBW1 Carport beyond TF2 HR WB1 TF2
(NGL)
Section F
1:100
RS1 Trusses - by others RS1 8m height limit Trusses - by others RS1
GU +114.775 Ceiling Height
+114.325 Window & Door Head
+113.875 Ceiling Height
WB1
+113.425 Window / Door Head
BED 1 ENSUITE +112.225 Finished Floor Level
+111.825 BED 1 ENSUITE +111.835 Ceiling Height
+111.325 Finished Floor Level BED 1 ENSUITE
+111.235 Window & Door Head
+110.935 Ceiling Height
+110.335 Window / Door Head
UNIT 8
UNIT 9
UNIT 10
LIVING / DINING
+109.135 Finished Floor Level
LIVING / DINING +108.885 Pad Height
+108.735
LIVING / DINING
+108.235 Finished Floor Level
+107.985 Pad Height
Natural Ground Line
(NGL)
Section G
1:100
Notes: Rev Date Description Project: Drawing Title: Project No. Drawn By Drawing No.
REV A 3/08/2023 PLANNING APPLICATION ISSUE
Use figured dimensions in preference to scale.
All dimensions to be varified and checked on B L A C K Contact information:
site. These designs, drawings, specifications
PO Box 781 Tewantin Q 4565 Kauri Street Townhouses BUILDING 3/4 ELEVATIONS 202304 PT DA.16
Architect Registration # 5386 QLD
and the copyright thereof are the property of For Davrus
Blackwood and must not be used, retained or W O O D Ph: 0416 037 424 & SECTIONS
copied without the written authority of [email protected] Lot 1 on RP203032 20 Kauri St, COOROY Scale Date Project Stage Revision
Blackwood. a r c h i t e c t u r e & d e s i g n www.blackwoodarchitecture.com.au QLD 4563 1:100 @ A1 8/08/2023 Dev. Application REV A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.