Skip to the record
Accept no imitations.

Original source · versioned page text

Planning-report-12 Figbird Court 1 Dec 2021 Final

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 Site access            Via existing driveway connection to Figbird Court

 Proposed               No additional lots proposed
 lots

 Proposed     Utilise existing 4 X 22,700 litre rainwater tanks (90,800 litres)
 servicing
              Proposed plunge pool (6 metres X 3 metres) estimated 20,000 litres capacity
 arrangements
              that can provide additional water for fire fighting purposes
                        Connection to existing 10 EP Fuji Clean Advanced Secondary Wastewater
                        Treatment System
                        Treated wastewater irrigation area
                        Electric solar panels and connection to existing property electricity supply




DA forms guide: Planning report template | July 2017                                           Page 10 of 48
Log in to download the original file

Planning-report-12 Figbird Court 1 Dec 2021 Final.pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.